ML20059L716

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-352/93-25 & 50-353/93-25 on 930926- 1101.Enforcement Discretion Exercised in One Instance Re Missed Firewatch
ML20059L716
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/10/1993
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20059L718 List:
References
NUDOCS 9311170309
Download: ML20059L716 (3)


See also: IR 05000352/1993025

Text

1

E.

NOV I O 19cn

Docket Nos. 50-352 ,

50-353

Mr. D. M. Smith

Senior Vice President-Nuclear

Philadelphia Electric Company

Nuclear Group Headquarters

Correspondence Control Desk

P.O. Box 195

Wayne, Pennsylvania 19087-0195

Dear Mr. Smith:

.

SUBJECT: COMBINED INSPECTION REPORT NOS. 50-352/93-25 AND 50-353/93-25

This letter transmits the results of the resident safety inspection by Messrs. N. Perry and

T. Easlick, from September 26 to November 1,1993, at the Limerick Generating Station,

l Limerick, Pennsylvania. The inspection focused on issues important to ensuring the public

health and safety and consisted of observations of activities, reviews of documents and

interviews with plant personnel. The results are documented in the enclosed report and were

discussed with Mr. R. Boyce of your staff at the conclusion of the inspection. ,

'

In general, activities were found to be conducted safely. In one instance, enforcement

discretion was exercised because of efforts in identifying and evaluating an instance of a

missed firewatch. Corrective actions were found to be comprehensive.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

Your cooperation is appreciated.

,

Sincerely, j

l

Oddin/L S!GNED BY ' <

I

EDWARD C. WENZlNGER

Edward C. Wenzinger, Chief

Projects Branch No. 2

Division of Reactor Projects

Enclosures:

1. NRC Region 1 Inspection Report 50-352/93-25 & 50-353/93-25 1

2. Attachment 1

1700d2

9311170309 931110

PDR

7

/( i

ADOCK 05000352 CA

\ G PDR ,'jf

<

. .

~

l

'

'

_ NOV I O 1993

Philadelphia Electric Company 2 -

)

i

cc w/encls:

J. Doering, Chairman, Nuclear Review Board  ;

D. R. Helwig, Vice President - Limerick Generating Stt' ion i

G. A. Hunger, Jr., Manager - Licensing Section

J. L. Kantner, Regulatory Engineer - Limerick Generating Station i

l

Secretary, Nuclear Committee of the Board l

'

l Public Document Room (PDR)

Local Public Document Room (LPDR) i

Nuclear Safety Information Center (NSIC) l

l

K. Abraham, PAO (2)

R. Temps, DRP l

NRC Resident Inspector, Limerick i

Commonwealth of Pennsylvania

1

l

l

l

l

.-

,

,

NOV I O 1993

Philadelphia Electric Company 3

bec w/ encl:

Region I Docket Room (with concurrences)

bec w/ encl: (Via E-Mail)

V. McCree, OEDO

F. Rinaldi, NRR

L. Nicholson, Acting PDI-2, NRR

,

,

R RI:DRP R[DR

(lf 0D P

NPerry

'

ifG

CAnderson

k

EWenzinger

11/ 7/93 11/f793 11/g93

4

OFFICIAL RECORD COPY

a:9325. lim

__ - -- - - - - - - - - - - - - - _ - _ _ _ _ - - _ -, _ _ _ . .

_ _ _ - - . _ . - _ ..