Text
-
j Docket No. 50-285 November.10, 1993 i
i Mr. Terry. L. Patterson Division Manager - Nuclear Operations
+
Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 399 q
Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 f
Dear Mr. Patterson:
, {
SUBJECT:
FORT CALHOUN LOW POWER PHYSICS TESTING PROGRAM (TAC N0. M87821)
By letter dated October 1,1993, Omaha Public Power District proposed changes to the Low Power Physics Testing Program for Fort Calhoun Station. These proposed changes would eliminate the pseudo ejection symmetry checks and t'
replace them with a low power flux map prior to 30 percent power. The NRC staff has reviewed the proposed changes and find them acceptable.
A copy of our Safety Evaluation is enclosed.
I Sincerely, j
ORIGINAL SIGNED BY:
Steven. Bloom, Project Manager I
Project Directorate IV-1 Division of Reactor Projects - III/IV/V i
Office of Nuclear Reactor Regulation l
t
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page l
DISTRIBUTION:
i: Docket File,,
NRC & LPDRs PD4-1 r/f S. Bloom E. Adensam W. Beckner
-P.
Noonan ACRS(10) (P-315)
OGC(15B18)
A. B. Beach, RIV J. Roe M. Chatterton 0FC LA:PD4flW PM:RD4-1 D:PD4-1 A NAME PNoonan b SBNm/vw WBeckne[
DATE ////d 93 tt/t /93
\\\\ / p /93
/
,gl' YESk) kS)N0 YES/t0 j
COPY OfflCIAL RECORD COPY Tocument Name:
FC87821.LTR j
NRC FRE CBER COPY 9311170304 931110 PDR ADOCK 05000285 P
PDR N
}f*'c%
a 5 ' ; s, c/')
8 -
UNITED STATES ds. j NUCLEAR REGULATORY COMMISSION
(
WASHINGTON, D.C. 20555-0001 November 10, 1993 Docket No. 50-285 Mr. Terry. L. Patterson Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399
Dear Mr. Patterson:
SUBJECT:
FORT CALHOUN LOW POWER PHYSICS TESTING PROGRAM (TAC NO. M87821)
By letter dated October 1,1993, Omaha Public Power District proposed changes to the Low Power Physics Testing Program for Fort Calhoun Station. These proposed changes would eliminate the pseudo ejection symmetry checks and replace them with a low power flux map prior to 30 percent power. The NRC staff has reviewed the proposed changes and find them acceptable.
A copy of our Safety Evaluation is enclosed.
Sincerely, Steven Bloom, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page
or_ -
4 t
Mr.' Terry L. Patterson Omaha Public Power District Fort Calhoun Station, Unit 1 i
i cc:
Mr. Michael F. McBride, Esq.
LeBoeuf, Lamb, teiby & MacRae 1875 Connecticut Avenue, NW Washington, D.C.
20009-5728 i
Mr. Jack Jensen, Chairman Washington County Board of Supervisers Blair, Nebraska 68008 Mr. Raymond P. Mullikin, Resident Inspector U.S. Nuclear Regulatory Commission i
i Post Office Box 309 Fort Calhoun, Nebraska 68023 1
Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
i 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission j
'611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 y
Harold Borchert, Director r
Division of Radiological Health Nebraska Department of Health 301 Centennial Mall, South j
Post Office Box 95007 l
Lincoln, Nebraska 68509 Mr. James W. Chase, Manager Fort Calhoun Station Post Office Box 399 Fort Ceihoun, Nebraska 68023 i