Text

_ _ _ _ _ . . .

4 p

Entergy Operations,inc.  !

=~ ENTERGY eon 8 KRea LA 700( 6

{

h- f>G4 729 0774 j R. F. Burski Ovcu Nam in:y

{

p hot?f W:f 3  ;

i W3F1-93-0197 A4.05 i PR l

i November 11, 1993 l

U.S. Nuclear Regulatory Commission  !

ATTN: Document Control Desk j Washington, D.C. 20555 ,

Subject:

Waterford 3 SES i Docket No. 50-382 l License No. NPF-38 Monthly Operating Report

{

1 Gentlemen: l l

Attached is the subject monthly report which covers the operating l statistics for the month of October, 1993. This report is submitted per l Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility l Operating License No. NPF-38. i i

Very truly yours, .l l

l . l

/ 4+V , j

\ l

<[

R.F. Burski Director i Nuclear Safety -l 1

RFB/TSB/ssf -j Attachment  ;

I cc: J.L. Milhoan, (NRC Region IV), R.B. McGehee, N.S. Reynolds, F. Yost (Utility Data Institute, Inc.),

J.T. Wheelock (INP0 Records Center), NRC Resident Inspectors Office

/

9311170229 DR 931031 I /

ADDOK 05000382 'L/

PDR_ ,

\

. I

+ l PRESSURIZER SAFETY VALVE  :

FAILURES AND CHALLENGES  :

r WATERFORD 3 l During the month of October 1993, there were no pressurizer safety valve failures or challenges.  !

I r

i f

f

.i 4

9 k

3 1

1 t

i e

i 1

l i

1 6

5 l

i I

I I

a t

l '

-i l

l e 1 OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: NOVEMBER,1993 COMPLETED BY: P.M. CENTOLANZI TELEPHONE: 504-739-6683 OPERATING STATUS

1. Reporting Period: October,1993 Gross Hours in Reporting Period: 745
2. Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104
3. Power Level to which Restricted (if any) (Net MWe): N/A
4. Reasons for Restriction (if any): N/A ,

i THIS MONTH YR TO DATE CUMULATIVE

5. Number of Hours Reactor was Critical 745.0 7.243.0- 59,636.0  !
6. Reactor Reserve Shutdown Hours 7. Hours Generator was On-line 745.0 7,228.0 58,824.2
8. Unit Reserve Shutdown Hours 9. Gross Thermal Energy Generated (MWH) 2,519.890 24,405,648 194,072.701
10. Gross Electrical Energy Generated (MWH) 818.100 7.947,190 64,808,660 ,
11. Net Electrical Energy l Generated (MWH) 783,056 7,594,172 61,765,789
12. Reactor Service Factor 100.0 99.3 83.9
13. Reactor Availability Factor 100.0 99.3 83.9 j i
14. Unit Service Factor 100.0 99.1 82.8 l
15. Unit Availability Factor 100.0 99.1 82.8
16. Unit Capacity Factor (using MDC) 97.8 96.8 80.9
17. Unit Capacity Factor (Using DER) 95.2 94.3 78.8
18. Unit Forced Outage Rate 0.9 3.6 l

l

i i

OPERATING DATA REPORT  !

DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 l DATE OF REPORT: NOVEMBER,1993 l COMPLETED BY: P.M. CENTOLANZI '

TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Con 1)

19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):

i Refueling - March 18,1994. Planned duration - 52 days.

i

20. If Shutdown at end of report perica, estimated date of startup: N/A l r
21. Unit in Commercial Operation 7 THIS MONTH YR TO DATE CUMULATIVE <
22. Hours in Reporting Period 745.0 7.296.0 71,041.0
23. Unit Forced Outage Hours 0.0 68.0 2,178.7
24. Nameplate Rating (Gross MWe): 1200
25. If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, i j Give Reasons: N/A i i

I I

P a

l

i 1

AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NUMBER: 50-382 ,

UNIT NAME: WATERFORD 3 DATE OF PEPORT: NOVEMBER,1993 COMPLliTED BY: P.M. CENTOLANZI TELEPHONE: 504-739-6683 ,

MONTH OCTOBER.1993 ,

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1050 17 1052 2 1050 18 1055 3 1050 19 1054 7

4 1050 20 1053 5 1050 21 1055 i

6 1052 22 1055 i'

7 1052 23 1055 8 1057 24 1054 9 1050 25 1055 10 1048 26 1055 11 1050 27 1055 12 1053 28 1013 13 1050 29 1054 14 1049 30 1054 15 1053 31 1054 16 1054 INSTRUCTIONS l

I On this format, list the average daily unit power /el in MWe-Net for each day in the reporting month.

Compute to the nearest whola megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 '

UNIT NAME: WATERFORD 3 DATE OF REPORT: NOVEMSER,1993 COMPLETED BY: P.M. CENTOLANZI ,

TELEPHONE: 504-739-6683 REPORT FOR OCTOBER.1993 Type Method of Shutting F = Forced Duration Down the Reactor or Cause, Comments and Number Date S = Scheduled (Hours) Reason (1) Reducino Power (2) Corrective Actions NONE (1) REASON (2) METHOD A= Equipment Failure (explain) 1= Manual B= Maintenance or Test 2= Manual Scram C= Refueling 3= Automatic Scram D= Regulatory Restriction 4= Continuation from Previous Period E= Operator Training and 5= Power Reduction License Examination 6= Other (explain)

F= Administrative G= Operational Error (explain)

H= Other (explain)