Ltr Contract for Task Order 8,to Nuclear Power Reactor Operations,Mods & Maint Insp Svcs, Awarded to Parameter, Inc
ML20059L559
Person / Time
Issue date: 08/23/1990
From: Hagan T
NRC OFFICE OF ADMINISTRATION (ADM)
To: Lofy R
PARAMETER, INC.
Shared Package
ML20059L558 List:
References
CON-FIN-L-1342, CON-NRC-03-89-027, CON-NRC-3-89-27 NUDOCS 9009270120
Download: ML20059L559 (5)


Text

--

i js

'Cy?,

f. >,
  • UNITED STATES -

Ny=

p, NUCLEAR REGULATORY COMMISSION 3._.....j

-";;;;;;;7

' Parameter, Inc...

-ATTN: - Richard A.' L6fy

-13380 Watertown Plank Road-Elm Grove, Wisconsin 53122

Dear Mr. Lofy:

Subject:

' Task Orue No. 8 Under Contract No. NRC-03-89-027 Entitled

" Operational Safety Team Inspection - Arkansas Nuclear One" (FIN L-1342)

You are hereby authorized to commence work under Task Order No. 8 effective-August 23, 1990 with an established cost ceiling of $58,865.33.

In accordance with Section G.6, Task Order. Procedures, of the subject contract, this letter definitizes Task Order No. 8.

This effort shall be performed in accordance with the enclosed' Statement of Work and Parameter Inc.'s proposal dated July 13, 1990, incorporated herein by reference.

The period of~ performance for Task Oider No. 8 is August 23, 1990 through October 31,-1990.

The total cost cei;ing is $58,865.33.

The amount of

$57,475,10 represents the total reimbursable costs, the amount of $20.23 represents the facilities capital cost of money, and'the amount'of

$1,370.00 represents the fixed fee, Accounting data for Task Order No. 8 is as follows:

B&R No.-

920-19-04-03-0 FIN No.:

L-1342-0 Appropiation No.

31X0000.209.

s Obligated Amount:

$15,330.80 B&R No.:

020-19-14-02-0 FIN No.:

L-1342-0 Appropriation No.-

31X0200.200 Obligated Amount:

$43,534.53 Total Obligation:

$58,865.33 The following individuals are considered.by the Government to be essential to the successful performance of the work heraunder:

D. Beckman

11. Brinkman D. Waters 9009270120 900827 PDR CONTR NRC-03-89-027 PDC

.g.

e 4

~ Richard A.'Lofy NRC-03-89-027 Task Order No. 8 Page 2 of 2 The contractor agrees ~ that. such personnel shall not be removed from the effort under this task orde*r without compliance with Contract Clause H.1 -

Key Personnel.

The'. issuance of this task: order does not amend any terms or conditions of the. subject contract.

Acceptance'of' Task Order No. 8 should be made by executing three-copies of

.t is document in the space provided and returning two copies to the-h Contract Administrator. You should retain the third copy for your records.

Should you have any questions regarding this matter, please feel free to contact Brenda DuBose, Contract Management Assistant, on (301) 492-7442.

~

Sincerely,

.I mothy F. I agan, Contracting Officer Contract Administration Branch No, 1 Division of Contracts and Property Management Office of Administration

Enclosure:

As stated-ACCEPTED-ask er No. 8 l.

C1 NAME "

V{

3 h61 TITLE DATE l-

[

1 l

l-l

08/07/90-112391 WHITE FLINT H, NO 003:

005

~ ' ' "

.c..

.i.

, _. 3 y,

/

- Contract NRC-03-89.027

.Enclosuro

  • : Parameter,-Inc.-

STATEMENT OF WORK-

. Task Order 008 t

FIN L-1348.

TITLE:

Operational Safety Team Inspection - Arkansas Nuclear One DOCKET Nt1MBERS:

50-313 INSPECTION REPORT NUMBERS:

50-313/90-NRC PROJECT MANAGER:

=F. Steven West, NRR (301-492-1220)

. NRC TEAX LEADER:

.J.

E. Cumminc, Region IV (817-860-8157)

PERIOD OF PERFORMANCE August 23, 1990 through October 31, 1990.

t BACAGEQRED Arkansas Powcr and Light, the 11conoce for Arkansas Nuclear One (ANO), has'.rocently made a number of changes -that impact the management, operation, and mainterance of ANO.

These changes include the infusion ' of new personnel into the organization, organizational restructuring, and the

. development _

.and implementation of new programs.

In~1ight of the changes that hav.e been made or are in process at ANO, NRC Region IV has decided to

- conduct an: Operational Saf ety' Team Inspection (OSTI) at ANO.to

- verify that the plantLis iseing operated safely and in conformance with regulatory requireuents. The OSTI will be conducted using the guidelines ~ delineated in Inspection procedure 93802, " Operational Safety Team Inspection," dated-November 27, 1989.

OBJECTIVE The' objective of this task order is to obtain specialized technical expertise in nuclear ' power plant operations and - maintenance to assist an'NRC inspection team'in the performance of the subject inspecthn.

WORK B.ROUIREMENTS AND SCHEDULE

~

The~ contractor shall provide the services of threo specialists in nuclear power plant operations, maintenance, and safety systems review / corrective actions to perform the work specified below.

O O

/-

OEpMm.

p:40, tJH1TE FL1MT H.

,NO.003-M

-(

(;

2' Tasks schedule

-1.

prepare for the inspection by 1.

Preparation is reviewing inspection related background scheduled for August documentation and records provided by' the -

24, 1990.

NRC Team Leador and prepare input to the

' inspection = plan.

'2.

Travel to the plant site and provide 2.

The on-site technical-assistance to the NRC inspection is inspection team.

The inspection will be scheduled for. August-cenducted in accordance with NRC 27 - through 31, 1990 Iidpection Procedure 93802, and-September 10 through 21, 1990 (Saturday, September 15 will be' a work day) with

'a home -

office review period during the intervening wook of September 03, 1990.

3.

prepare a draft inspection report 3.

September 21,-

input.

1990.

4.

Prepare a final inspection report 4.

September 24 input through October 05, 1990.

REPORTING REOUIREMENTJ T.gchnien1 ReDorts At the completion of Task 1; the contractor specialists shall provide inspection plan input as specified in Section F.3.1(a) of the basic' contract.

During Task 2,

the contractor-specialists shall provide daily reports ' as specified. in Section F.3.1(b) of the basic contract.

At the completion of Tank 3 (prior to the inspection. team's exit meeting.with the licenseo),

the contractor upccialists shall-provide 'a draft inspection report input as specified in Sections F. 3 ;1(c) and ' F.3.1(d) of the basic contract.

At the completion of Task 4, the contractor shecialists shall submit a final inspection report input in accordance with sections F.3.l(c) and F.3. l(d) of the banic contract.

All technical reporto shall be delivered in accordance with Sections F.3.1(e) and F.3.1(f) of the basic contract.

\\

"0EV07/90[

l11:40-

' LJHITE FLINT H.

to.003-Odi

&p..

.. _(

(;

-i Oy 9 3

'?

[Q p r-y g'.

, v J

' j$ j' a

j 3

-I J

p' Rontr 'v Business LattR. Reports The contractor shall1 provide monthly progress reports'as specified j

!in Section F.3.2 of the basic contract.

J

[

MERYINGS AND TRAVEL

^

-For planning purposes, the meeting and~ travel requirements are as-follows:

one three-person, five day trip to the Arkansas Nuclear one plant site-(located near Russellville, Arkansas) to participate in the subject inspection (Te.sk 2).

c'-

One three-person, twelve. day trip to the Arkansas Nuclear one plant -

site to participate in the subject inspection (Tasks 2 and 3).

The contractor specialists shall coordinate all travel arrangements 3

Lwith the NRC Team Leac.er.

ESTIMATED LEVEL OF EQ g g r

For planning purposes, the estimated level of effort is an.follows:

Project Manager:

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

l' Three specialists.:

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> in home office for inspection L

preparation (Task *.).

17 days in the field to assist.in tho inspection (Tasks 2 and 3).

40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> in home office during.the intervening week for inspection 4

related review (Task 2).

L 40 hours in home office for report input' l a.

preparation'(Task 4).

(

Support staff:

20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />.

h-t APPLICABLE SPEcrAL Pacyjszoxs o

The~ vork specified in this statement of work is license fee recoverable.

License fue recovery information shall be included-T in the monthly progress reports as specified in section r.3.i.3 of the basic contract.

e

(

NRC FURMISHED MATERIALS

-y-v_

[

Documents required to. prepare for the inspec' tion, including L

Inspection Procedurc 93802, will bc ' provided by the NRC Team Leader.

Documents and other materials required to perform the inspection will be provided at the plant site, (End of Statement of Work) o L

\\

ls

,/

./

---. --..-s

- --