ML20059L470
| ML20059L470 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 01/28/1994 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20059L473 | List: |
| References | |
| NUDOCS 9402070044 | |
| Download: ML20059L470 (3) | |
See also: IR 05000213/1994001
Text
i
D
.
T 28 194
Docket No. 50-213
-,
Mr. John F. Opeka
Executive Vice President - Nuclear
Connecticut Yankee Atomic Power Company
P.O. Box 270
Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
Subject: Inspection Number 50-213/944)1
.
This letter refers to the safety inspection conducted by Dr. Jason C. Jang of this office on
'
January 10-14, 1994, of activities authorized by NRC License No. DPR-61 at the Northeast
Utilities Service Company (NU), Berlin, Connecticut and to the discussion of our findings
held by Dr. Jang with Mr. R. Schmidt and other members of your staff at the conclusion of
the inspection.
'
Areas examined during this inspection are important to public health and safety and included
your capability for calculating the projected radiation doses resulting from radioactive liquid
and gaseous effluent releases, as described in the NRC Region I Inspection Report that is
enclosed with this letter. Within these areas, the inspection consisted of selective
r
examinations of procedures and representative records, interviews with personnel, and
observations by the inspector.
Within the scope of this inspection, we noted that you had excellent projected dose
calculation capability. We noted further that the responsible individuals in the Radiation
Assessment Branch (RAB) had excellent knowledge to implement the projected dose
calculation methodology. No safety concerns or violations of NRC requirements were
>
identified in your program.
,
No reply to this letter is required. Your cooperation with us in this matter is appreciated.
Sincerely,
Original Signed By;
James H. Joyner
James H. Joyner, Chief
Facilities Radiological Safety
and Safeguards Branch
Division of Radiation Safety
and Safeguards
'\\
Oy0007
O
OFFICIAL RECORD COPY
f(,eu
[;
9402070044 94012s
ADOCK 05000213
'
<
,
-G
- .
.
.
_
-
,.
-
.
,t
-Connecticut Yankee Atomic Power Company 2
.
Enclosure: NRC Region I Inspection Report Number 50-213/94-01
cc w/ encl:
S. E. Scace, Vice President, Nuclear Operations Services
i
J. P. Stetz, Vice President, Haddam Neck Station
J. Solymossy, Director, Nuclear Quality and Assessment Services
J. J. LaPlatney, Nuclear Unit Director
R. M. Kacich, Director, Nuclear Planning, Licensing and Budgeting
Gerald Garfield, Esquire
Nicholas Reynolds, Esquire
K. Abraham, PAO (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
.
NRC Resident Inspector
State of Connecticut SLO
!
,
,
,
i
OFFICIAL fiECORD COPY
!
-
.
-
.
. . .
,
.
Connecticut Yankee Atornic Power Company ' 3
bec w/ encl:
Region I Docket Room (with concurrences)
f-
bec w/enci (VIA E-MAIL):
J. Stolz, NRR/PD I-4
'
- V. McCree, OEDO
M. Shannon, NRR/ILPB
i
.
i
t
!
!
,
^'
i
e
f
.
DRSS:RI
DRSS:RI
DRSS:RI
l
JANG 1/jM/94
JOUSTRA 1/ Dn/94
JOYNER 1/7/94
->
M-
b
i
%
t-
j
'
j
hV
(]
!j
-
OFFICIAL RECORD CCPY