ML20059L470

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-213/94-01 on 940110-14.No Violations Noted
ML20059L470
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/28/1994
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20059L473 List:
References
NUDOCS 9402070044
Download: ML20059L470 (3)


See also: IR 05000213/1994001

Text

i

D

.

T 28 194

Docket No. 50-213

-,

Mr. John F. Opeka

Executive Vice President - Nuclear

Connecticut Yankee Atomic Power Company

P.O. Box 270

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

Subject: Inspection Number 50-213/944)1

.

This letter refers to the safety inspection conducted by Dr. Jason C. Jang of this office on

'

January 10-14, 1994, of activities authorized by NRC License No. DPR-61 at the Northeast

Utilities Service Company (NU), Berlin, Connecticut and to the discussion of our findings

held by Dr. Jang with Mr. R. Schmidt and other members of your staff at the conclusion of

the inspection.

'

Areas examined during this inspection are important to public health and safety and included

your capability for calculating the projected radiation doses resulting from radioactive liquid

and gaseous effluent releases, as described in the NRC Region I Inspection Report that is

enclosed with this letter. Within these areas, the inspection consisted of selective

r

examinations of procedures and representative records, interviews with personnel, and

observations by the inspector.

Within the scope of this inspection, we noted that you had excellent projected dose

calculation capability. We noted further that the responsible individuals in the Radiation

Assessment Branch (RAB) had excellent knowledge to implement the projected dose

calculation methodology. No safety concerns or violations of NRC requirements were

>

identified in your program.

,

No reply to this letter is required. Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed By;

James H. Joyner

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

'\\

Oy0007

O

OFFICIAL RECORD COPY

f(,eu

[;

9402070044 94012s

PDR

ADOCK 05000213

'

<

,

-G

PDR

- .

.

.

_

-

,.

-

.

,t

-Connecticut Yankee Atomic Power Company 2

.

Enclosure: NRC Region I Inspection Report Number 50-213/94-01

cc w/ encl:

S. E. Scace, Vice President, Nuclear Operations Services

i

J. P. Stetz, Vice President, Haddam Neck Station

J. Solymossy, Director, Nuclear Quality and Assessment Services

J. J. LaPlatney, Nuclear Unit Director

R. M. Kacich, Director, Nuclear Planning, Licensing and Budgeting

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

.

NRC Resident Inspector

State of Connecticut SLO

!

,

,

,

i

OFFICIAL fiECORD COPY

!

-

.

-

.

. . .

,

.

Connecticut Yankee Atornic Power Company ' 3

bec w/ encl:

Region I Docket Room (with concurrences)

f-

bec w/enci (VIA E-MAIL):

J. Stolz, NRR/PD I-4

'

- V. McCree, OEDO

A. Wang, PM, NRR

M. Shannon, NRR/ILPB

i

.

i

t

!

!

,

^'

i

e

f

.

DRSS:RI

DRSS:RI

DRSS:RI

l

JANG 1/jM/94

JOUSTRA 1/ Dn/94

JOYNER 1/7/94

->

M-

b

i

%

t-

j

'

j

hV

(]

!j

-

OFFICIAL RECORD CCPY