Forwards Insp Rept 99901006/89-01 on 890515-18 & Notice of Nonconformance.Written Response Requested within 30 Days of Ltr Date.Ltr Should Include Corrective Actions to Be Taken
ML20059L462
Person / Time
Issue date: 09/17/1990
From: Brach E
Office of Nuclear Reactor Regulation
To: Matt Thomas
A&G ENGINEERING
Shared Package
ML20059L465 List:
References
REF-QA-99901006 NUDOCS 9009270037
Download: ML20059L462 (3)


Text

'

p qq-t 1

f$

C

)

kg f. m w,.s\\

i-UNITED sT ATEs y'

'l

^

NUCLEAR REGULATORY COMMISSION -

WASHINGT ON, D. C. 205L5 F

y m

,,J:

..... +f SEP 1 1 1000 r

' Docket'No. 99901006/89-01 Mr. Marvin EL Thomas,J President J'

A&G Engineering Company.II, Incorporated i

4640 East LaPalma Avenue

'l

['

Anaheim, California 92807-i j

1

(,(

Dear. Mr. Thomas:

s/

4,]q h

4 s

r "L

/N +, L This'1etter addresses the cinh,4ction of your facility at Anaheim, California L

1

-conducted by Messrs. R. L. Cilimberg,,S. M. Matthews, and E. Lea of this office.

1 yt fon'May'15-18,,1989,= and.the discussions of> their findings with you and+ other*

x'~'1J members of your; staff at the conclusion of the inspection. ; Release of' this 2

.,3 x

'd_

> report was delayed during NRC's ongoing review of nonconforming and substant

_440!

j; 11 !

-o

'dard vendor products.

2 L.,

wc U

ThepurposeoftheinspectionwasNofollow-upanallegationthatA&G J

C ~,

J Engineering Company:II,' Incorporated (A&G) had provided nuts to Washington o o'

bi

'PublicPowerSupplySystem(WNP-2)withmanufacturers'markingsthatdidnot match the, accompanying A&G' certified material test report (CMTR).1 m

^

J Pj Y

  • Areas examined during the NRC inspection and'our f edings are discussed in the

.t ~tl enclosed report. This inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by i1 the inspectors.

(

During this inspection it was-found.that the implementation of 'your quality

)

~

assurance program failed to meet.certain NRC requirements. The allegation was substantiated in that the manufacturers' markings were not appro)tiately l

described on the CMTR and A&G had marked some nuts not manufactured )y A&G from l

^,'

.an order of 200 with the A&G mark. Nonconformances were identified concerning-Lthe selection and use of suppliers, improperly marked and upgraded nuts, and q

lost traceability of. nuts supplied to nuclear utilities. Two unresolved items concerning disposition of nonconforming material wers also identified during j;

the inspection. A&G is requested to respond to these items in addition to.the responses required by~ the items of nonconformance. The specific findings and references to the pertinent requirements are identified;in the enclosures to q

this letter.

x-

.Please provide us within'30 days from the date of this letter, a written j

statement containing: (1) a description of steps that have been or will be

'taken to correct these items identified in the enclosures; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be i

completed. We will consider extending the response time, if you can show good cause for us to do so.

9oo927oo37 900917 T) YDS Dd 3[

PDR QA999 EECAGENG Nb RLE CEN1ER COPY po\\

%W I a

um

^{Y

,EP17yg 7

t Mr. Marvin E. Thomas n' The response requested by this letter is not subject to the clearance l

procedures of the Office of Management and Budget as required by the Paperwork

-Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Sincerely,

/s E. William Brach, Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office Of Nuclear Reactor Regulation

Enclosures:

1.

Appendix A. Notice Nonconformance 2.

Appendix B, inspection Report 99901006/89-01 DISTRIBUTION:

7,. s ; 3. s.

PDR.

VIB Reading DRIS Reading WTRussell BKGrimec EWBrach

'JPotapovs

limberg
b. - '+ hews Elt., Region 11 PJoukoff, Region V IS Distribution Central Files
  • Previously concurred.

OFC

RIS.1:VIB:DR15 :RIS-1:VIB:DRIS:C:RIS.1:VIB
C:VI IS:NRR:D:DRIS:NRR 4

l j ::BKGrimes NAME :RLCilimberg:jeh :SMMatthews

UPotapevs
EWB DATE
08/13/90*
08/13/90*
09/05/90*
09/10/90
09/11/90*

0FFICIAL RECORD COPY Document Name:

LETTER MR MARVIN E. THOMAS

v.

Mr.karvinE. Thomas >-

The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Sincerely,

,~

,Y 1111ambrach, Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation j

r

Enclosures:

1 1.

Appendix A, Notice of Nonconformance l

2.

Appendix B, Inspection Report 99901006/89-01 i

4 i

6 P

___________-_____.____...,_____.____m______.________m

-, _ _