ML20059L373

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-245/94-03,50-336/94-03 & 50-423/94-03 on 940110-14.No Violations Noted
ML20059L373
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 01/28/1994
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20059L377 List:
References
NUDOCS 9402070001
Download: ML20059L373 (3)


See also: IR 05000245/1994003

Text

'

%

,

Vr

!

[.

'JW 2 8 1994'

FL

Docket Nos. 50-245, 50-336, 50-423

(

Mr. John F. Opeka

l

Executive Vice President - Nuclear

L

Northeast Nuclear Energy Company

(

P. O. Box 270

Hartford, Connecticut 06141-0270

i

l:

Dear Mr. Opeka:

c

Subject: Combined Inspection Nos, 50-245/94-03,50-336/94-03, and 50-423/94-03

This letter refers to the safety inspection conducted by Dr. Jason C. Jang of this of6ce on

January 10-14, 1994, of activities authorized by NRC License Nos. DPR-21, DPR-65, and

MPF-49 at the Northeast Utilities Service Company (NU), Berlin, Connecticut and to the

discussion of our findings held by Dr. Jang with Mr. R. Schmidt and other members of your

I

staff at the conclusion of the insi,ection.

I

Areas examined during this inspeaan are important to public health and safety and included

your capability for calculating projected radiation doses resulting from radioactive liquid and

gaseous effluent releases, as described in the NRC Region I Inspection Report that is

enclosed with this letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, Interviews with personnel, and

observations by the inspector.

Within the scope of uns inspection, we noted that you had excellent projected dose

calculation capabilly. We noted further that the responsible individuals in the Radiation

Assessment Bran.:h (RAB) had excellent knowledge to implement the projected dose

calculation methodology. No safety concerns or violations of NRC requirements were

identined in your program,

r

'

No reply to this letter is required. Your cooperation with us in this matter is appreciated.

kftf8l%igned By;

James H. Joyner

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

t

0$0003

y~

9402070ool 94o12g'

,

~

g.

~

OFFICIAL RECORD CCPY

y[au

.

,

m

PM

ADOCK 05000245

!,,-

-

pg

\\

'

..

,

.

Northeast Nuclear Energy Company

2

Enclosure:

NRC Region I Combined Inspection Report Nos. 50-245/94-03; 50-336/94-03

and 50-423/94-03

cc w/ encl:

S. E. Scace, Vice President, Nuclear Operations Services

D. B. Miller, Senior Vice President, Millstone Station

H. F. Haynes, Nuclear Unit Director

G. H. Bouchard,. Nuclear Unit Director

F. R. Dacimo, Nuclear Unit Director -

R. M. Kacich, Director, Nuclear Planning, Licensing and Budgeting

J. Solymossy, Director of Nuclear Quality and Assessment Services

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Connecticut SLO Designee

NRC Resident Inspector

!

OFFICIAL RECORD CCPY

.!

-

_

- ---_-

-

_ _ _ - _

- __

..:

,

..

Nonheast Nuclear Energy Company

3

l

bec w/ encl:

q

l

Region I Docket Room (with concurrences)

i

. bec w/enci (VIA E-MAIL):

l

J. Stolz, NRR/PD I-4

1

V. McCree, OEDO

G. Vissing, PM, NRR

V. Rooney, PM, NRR

{

D. Jaffe, PM, NRR

J. Andersen, NRR

M. Shannon, NRR/ILPB

1

)

DRSS:RI

DRSS:RI

DRSS:RI

l

_

JANG 1/ fd /94

JOUSTRA 1/g1/94

OYNER 1/ 8/94

-y

-

o

u

o,

s

1

OFFICIAL RECORD COPY

_ _ _ -____-__ _ -_--_ _ ___-_______ _ _____- __

-_____ ___ _ _ _ -_

___ - ______