Certifies That Licensed Operator Training Programs Developed Using Sys Approach to Training & Implemented Utilizing Certified Simulation Facility,In Accordance W/ 10CFR55.31(a)(4) & 10CFR55.59(c),as Ack by GL 87-07
ML20059L250
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/12/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-87-07, GL-87-7, NUDOCS 9311160395
Download: ML20059L250 (2)


Text

.

(

  • l l

A 1 l 1 ,

Tennessee Valley Authonty, Post Off ce Box 2000. Soddy-Daisy, Tennessee 37379 2000 I

l Robert A. Fenech V(e P esident. %@ovan Naclear Pant ,

November 12, 1993  !

\ .

l U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

! i l Gentlemen:  ;

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - CERTIFICATION OF SQN LICENSED OPERATOR ,

TRAINING PROGRAMS The purpose of this letter is to provide TVA's certification that the SQN i licensed operator training programs have been developed using a systeas approach to training (SAT) and are implemented utilizing a certifie/

simulation facility (reference letter from TVA to NRC dated March 21, 1991). In addition, the SQN licensed training program ~<as originally accredited on January 11, 1984, by the National Nucle..r Accrediting Board (last renewed January 30, 1992). This certificJtion is made in accordance with the requirements of 10 CFR 55.31(a)(4) and 10 CFR 55.59(c), as acknowledged by Generic Letter (GL) 87-07, ,

l "Information Transmittal of Final Rulemaking for Revisions to Operator  ;

Licensing - 10 CFR 55 and Conforming Amendments."

l l In accordance with GL 87-07, implementation of these certified training programs may be substituted for initial and requalification training programs previously approved by NRC without staff review. SQN is taking this opportunity to notify NRC of its use of an accredited SAT for licensed operators as a result of the recent issuance of the rule concerning nonlicensed nuclear power plant personnel (10 CFR 50.120) that also required an SAT approach. A description of SQN's accredited training program has been incorporated into SQN's "Living" Final Safety Analysis l Report (FSAR) in accordance with the FSAR update process.

i

\

^50050 1

' O 9311160395 931112 F PDR ADOCK 05000327 4 v PDs y

a B -

- U.'S. Nuclear Regulatory Commission Page 2 November 12, 1993 i

If there are any questions, please telephone Jim Smith at (515) 843-6672.

Sincerely, l k ,

Robert A. Fenech cc: Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector {

Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission -

Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 L