ML20059L149

From kanterella
Jump to navigation Jump to search
Notification of 931119 Meeting W/Numarc Representatives in Rockville,Md to Discuss Phase 2 of NUMARC Thermo-Lag Test Program
ML20059L149
Person / Time
Issue date: 11/09/1993
From: Mccracken C
Office of Nuclear Reactor Regulation
To: Thadani A
Office of Nuclear Reactor Regulation
References
NUDOCS 9311160315
Download: ML20059L149 (3)


Text

-

November 9,1093 MEMORANDUM FOR:

Ashok C. Thadani, Director Division of Systems Safety and Analysis FROM:

Conrad E. McCracken, Chief Plant Systems Branch..

Division of Systems Safety and Analysis

SUBJECT:

FORTHCOMING MEETING WITH NUMARC REPRESENTATIVES DATE & TIME:

Friday, November 19, 1993 3:00pm - 5:00pm LOCATION:

One White Flint North l'

Commission Conference Room 1-F-16 11555 Rockville Pike l

Rockville, MD 20852 PURPOSE:

To discuss Phase 2 of NUMARC Thermo-Lag Test Program i

  • PARTICIPANTS:

NRC NUMARC J. Taylor J. Colvin F. Miraglia W. Rasin A. Thadani C. McCracken Conrad E. McCracken, Chief Plant Systems Branch Division of Systems Safety and Analysis cc: See next page

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff i

Policy," 43 Federal Reaister 28058, 6/28/78.

DISTRIBUTION SPLB TSI File FMiraglia PMadden RJenkins LPlisco Central File?

WRussell JSingh Receptionist, OWFN D0udinot NRC PDR AThadani JHolmes GPA/PA WDean JTaylor CMcCracken IMiller ETana, PMAS JLee JSniezek MCallahan GMulley P0' Dell, 12E4 EPawlik JBlaha SW PGill CBerlinger ffk,h hkhE3 hhI$f S

ESh A

SPLB: DSS <[

6 D

ot West *

  • CMcCrack fl/f/93 11/9/93 II/jP/93

[G:\\ THERM 0LA\\ ZED 019.D0]

g1160315931109 OM NN REVCP ERONungc

{f { 74 & Wrg)

I b-3

jco oroug y,.

k UNITED STATES 4

i S

NUCLEAR REGULATORY COMMISSION E

j WASHINGTON. D.C. 2056FA1001 o,

  1. ,a November 9, 1993 l

MEMORANDUM FOR:

Ashok C. Thadani, Lirector Division of Systems Safety and Analysis i

FROM:

Conrad E. McCracken, Chief Plant Systems Branch Division of Systems Safety and Analysis

SUBJECT:

FORTHCOMING MEETING WITH NUMARC REPRESENTATIVES DATE & TIME:

Friday, November 19, 1993 3:00pm - 5:00pm LOCATION:

One White Flint North Commission Conference Room 1-F-16 11555 Rockville Pike Rockville, MD 20852 PURPOSE:

To discuss Phase 2 of NUMARC Thermo-Lag Test Program i

  • PARTICIPANTS:

NRC NUMARC i

J. Taylor J. Colvin F. Miraglia W. Rasin l

A. Thadani C. McCracken onrad E. McCracken, Chief Plant Systems Branch Division of Systems Safety and Analysis cc: See,next page

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff 4

Policy," 43 Federal Reoister 28058, 6/28/78.,

4

. a

1 Ashok C. Thadani cc:

Mr. Joseph F. Colvin Dresident and Chief Executive Officer fiuclear Manaaement and Resources Council 1776 Eye Street, NW Suite 300 Washington, DC 20006-3706 Mr. Richard Licht 3M General Offices 3M Center St. Paul, MN 55144-1000 Mr. Dave Haines Eternit, Inc.

Excelsior Industrial Park i

P.O. Box 679 Blandon, PA 19510-0679 Mr. Ralph Block President Promatec, Inc.

P.O. Box 309 Cypress, TX 77429 Mr. Clifton Philpott Darchem Engineering 81 West Bellevue Dr.

Pasadena, CA 91105 j

C. T. M. Hall Darchem Engineering Ltd.

Stillington, Stockton-on-Tees Cleveland TS21 1LB England Mr. John A. D. Maxwell Thermal Ceramics P.O. Box 923 Augusta, GA 30903 Mr. Rubin Feldman President g

Thermal ScientV, Inc.

2200 Cassens Drtive St. Louis, M0 93026 A

\\

-