Forwards Sys Operability Rept Commonwealth Edison Zion Nuclear Station Component Cooling Water Sys, to Document Completion of Statement of Work
ML20059L086
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/07/1990
From: Gore B
Battelle Memorial Institute, PACIFIC NORTHWEST NATION
To: Khadijah West
Office of Nuclear Reactor Regulation
Shared Package
ML20059L088 List:
References
NUDOCS 9009260112
Download: ML20059L086 (1)


Text

.

'y 6

.[

f ( s,A D i. -?. A in

,_.J-r P.kific Northwest Laboratories -

l" P.O. Box <M Richland, Washington U.S. A. 99332 lelephone(509). 376 3431-September 7,'21990 W"152an f acsimile (509) 375-2716 -

'(

_ Mr._K.' Stephen West U.S. Nuclear Regulatory Commission Office of NRR

+

One White. Flint ~ North 11555 Rockville Pike Rockville, MD 20852

Dear Mr.. West:

This letter documents the completion of-the Statement of Work (S0W) _ for the operability inspection conducted at Commonwealth Edison's Zion Nuclear 1

Station.-

~~

.w LThe operability team's task included an inspection of'both the service water f

system.and the component cooling water system. The NRC operability in,cpection-t

. team leader,' in order to maximize the use of team resources, assigned the. _

component' cooling. water system operability inspection to the Pacific Northwest.

~

-Laboratory team member.

7 m'

f Attached is' a copy of the " System Operability Report, Commonwealth Edison Zion Nuclear Statio~ 's Component Cooling Water System".

n ic a a:

s Sincerely, 1

f]

i

.l.

Y'

. L.1(Ch Larson Bryan F. Gore i

ght

, Senior _ Development Engineer

' Project Manager

'LLL/BFG:bd

,aM i

a jE LAttachment.

w cc:

Ms. Sonia Burgess, Team Leader, Region 111 4,

-Dr. Jack Burns, US NRC-Washington DC l

i l

0010a.

900,26o 12 90o907 flg/

o PDR ADOCK 05000295 P

PNU gl,

~.

.