MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
r w ,
i ^
r f.. _
...:.,.; l Q
l 'Af '
J Teiephone Hi?) 393-6000 Nuclear Oroup = r s P O Box 4 . .
Shippmgport PA 15077 0004.
7 gg -
1 ,
i Beaver Valley Power Station .
Unit 1 - Docket No. 50-334, Lioerse.No. DPR-66 Unit 2 - Docket No.-50-412,' License No. NPF-73 1
,o: ~
Monthly Operatirn Report j
.6 s
j P
U. S. Nuclear Regulatory. Ccm nission
,,c Wn=nt Can'rol Desk '
Washington, D.C. 20555 Gentlemen:.
In .accordance with Appendix A, Technical Specifications, the Monthly i Operatirq Report is sutznitted for Unit 1 and Unit 2; for the month of August, l
- l. 1990.
L Also note lthat Deaver-- Valley Unit II is c W ing its Maximum Dependable l' -Capacity- (net PMe) frun 833 to 820 PMe and Maximum Dependable Capacity. (Gross PMe) 'from 885 to 870144e.; ,
- 'i L," Veryltrulyyours, h,+
(
J.:D.-Sieber Vloe President Nuclear Group d f' ,
1 Lic .
MAW /nd .,
o.
Enclosures I h , it f ac:.NRC Regional Office. .
J ,
King of Prussia,- PA :
l- . 9009240214 900831 R l PDR ADOCK 05000334 .
I R PNV km O n n .,. v 3. #
- r5 2-4 J S
[* fh I
\
, g, . .=
, o 4' 'c, , AVERAGE DAILY LNIT KMD, IEVEL Docket No. '50-334
-I
- . Unit' BVPS Ur.it 1
' Date ._ Septeunbar 7, ' 1990 :
Completed by M.A. Winner
'htlephone (412) 393-7621._
MNIH Aucnist 1990 'I.
e I
DAY AVDtAGE DAILY PJWER IEVEL DAY ' AVERAGE IAILY ICWER IEVEL
- (We-Net) (We-Net) '!
.1 808 17 '800 2 0 18 800 3 109 19 796 !
.s 4 85 20 800 , !
9 5- 612 21 808 1
,6- 788 22 813 7 804 23 '800 8 796 '24 804
-1 9 813 25 796 10' 788 26. 800 11 '- 658 27 _796 12 800 28- 792
'13i 808 29 804 !
-114 . , _ , 808 30 813 !
15- 800 31 800' f16 808 'U l
INSTRDCTIONS On-_'this format, list the average daily unit power level in MWe-Net fa each' day l l
in the reporting month. Coupute to the nearest whole megawatt. l L-m j
l I
s-) -
l 4
L.
t . .
e c OPERATING DATA REPORT i
DOCKET NO.: 50 334 REPORT DATE: 09/07/90 .
COMPLETED BY: M.A.WINGER TELEPHONE:- (412)1393 7621 i OPERATING STATUS i
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: AUGUST 1990
- 3. LICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPLATE RATING (Cross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
- 8. IF CHANGES OCCUR IN CAPACITY RATINCS SINCE LAST REPORT, CIVE REASONS:
p I
- 9. REASONS
- 10. POWER LEVEL TO WHICH RESTRICTED FOR RESTRICTIONS, IF ANY: IF ANY (Net MWe):
None ,
N/A i 1
! THIS MONTH YEAR TO DATE CUMULATIVE 11.-HOURS IN REPORTING PERIOD: 744.0 5831.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 125663.0 723.2 5373.1 77511.6:
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0. 0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
4482.8 711.7 5325.0 75792.5
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 .
0.0 0.0 16.' GROSS THERMAL ENERGY GEN. (MWH): 1779924.0 13349166.0 179429221.5
- 17. GROSS ELECT. ENERGY GEN.'(MWH):' 568050.0 4338830.0 57608519.0
'18. NET ELECTRICAL ENERGY GEN. (MWH): 535080.0- 4076550.0 53773700.0 7
- 19. UNIT SERVICE-FACTOR: (PERCENT) 95.7 91.3 62.5
- 20. UNIT AVAILABILITY FACTOR:(PERCENT)- 95.7 91.3 62.5
- 21. UNIT CAPACITY FACTOR-(MDC): PCT 88.8 86.3 55.8
- 22. UNIT CAPACITY FACTOR'(DER): PCT 86.1 83.7 54.1
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 4.3 3.2 16.7
- 24. SHUTPOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
- i FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A-INITIAL ELECTRICITY N/A N/A
- COMMERCIAL OPERATION N/A N/A
T
. NARRATIVE SGMARY OF
" ' i MJtfIHLY OPERATING EXPERIENCE UNIT I AUGUST 1990 ALgust i h Unit operated at 100% output.
August 2 At 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> the Unit -was removed frun service while. I repairity the number 2 battery charger. At 0152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br /> the unit entered mode 3. At 2244 hours0.026 days <br />0.623 hours <br />0.00371 weeks <br />8.53842e-4 months <br /> the reactor was taken ,
critical. '
Atqust 3 At 0308 hours0.00356 days <br />0.0856 hours <br />5.092593e-4 weeks <br />1.17194e-4 months <br /> the Unit was syndtronized as output escalated to 30%. Power ascension was halted at 30% to permit improvements to Secondary Steam Generator Water chemistt,f.
Aagust 4 At 0220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br /> the Unit was removed frun service to permit- !
repairs to the turbine's ele.L sydraulic control system.
At 0858 hours0.00993 days <br />0.238 hours <br />0.00142 weeks <br />3.26469e-4 months <br /> the Unit was syndtronized and the Unit's output was er:alated to 30%. 'Ihe power -lation was halted at 30's to permit inprovements to Secondary Steam ,
Generator Water chemistry.
Atgust 5 At 0155 hours0.00179 days <br />0.0431 hours <br />2.562831e-4 weeks <br />5.89775e-5 months <br /> the Unit's output was asuvilated to 100%. '
August 6 h Unit operated at a nominal value of 100% output.
through August 9 August 10 At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit's output was reduced to 45% to penit testing the govemor valve for the main turbine.
August 11 At 0215 the Unit'r, output was -lated to approximately 53%. 'At 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> the Unit's output was escalated to a ncatinal value of 100%.
L August 12 h Unit operated at a ncatinal value of 100% output.
through August 26 August 27 N Unit operated at a ncatinal value of 100% output. At y
1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br /> the Rod Position Indicator for the K-2. Control Rod malfunctioned.
August-28 'Ihe , Unit operated at a ncatinal value of 100% output. At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> the Rod Position Indicator for the K-2 Control Rod was repaired.
E August 29 h Unit operated at a ncatinal value of 100% output.
l~
w
' ~
INIT SUIIX3@l3 MO RMR REI1JCIIGE Dadu!t It). 334 lhit Neue IM S Latt 31 ~!
Dinte % u =- 1. osu eted M.A. Mmtnir -
i HEREP M.NIH MKIEP 1990 f4121 JyJ-Anzl
~
pt!thoql of Liamsee musep & Qtatettive Dratim Suetirry Everit a, a. Actam to No. Dette 'Iypel (Haurs) maar:12 Da m Daarf w't Repmt # Prevelt Heatultumae 27 900802 F 25.6 A 1- 1-90-12 BC OGHE thit reuoved frga servim to regaa*r AC Sqnt Cirotalt Breeler fitt #2 statam .
28 900803 F 0 H 5 WA ZZ 71 71 71. Rawer haltjed at 30% to mturto-d W*2-y.
29 900804 S 6.6 B 1 WA HA VAIM X thit uns reurwe$ fras service to repair the '1urbine I!1ectrdykmalin j Qxitrol Systuum.
! 30 900804 F 0 H 5 WA ZZ 71 71 71. Howeep marwnim halted at 30t to Mutur duuan 31 900827 F 0 H 9 WA IE DEIRJ Rxi Positicrt Indiout)ar fitr K-2 amitzul Itxt uniftmetacmed.
1 a
1 2 3 4 P-Rroed h It!thod: IMtibit Q-Instzutias fiar S-Stivvtikri A-Rusir= art Failure (ENplain) 1-fernal Preputatim of Dsta Suw*n B-ftitinberumae cr 'R!st 2-fernal fiicran fcr Lamsee EWent (IER) File !
3,pmenetic Smana (MEED 0161) . .
D-9vn a Restrictim 4-Ont'd, fran Previous Itzith E
F
'aka
' & Linmse ENaa 5-Dart w+wrt 5 9-Other Exhibit I-Same Satutoe.
GNirwal Eritr (ENplain)
H{iher (Euplain) i l
l c - - _ _ _. _ _ _ -_ _- _ _ - --- _ __- - - -___--__
AVERAGE IRILY LNIT 30WER IEVEL i Docket No. 50-412' Unit BVPS Unit 2 !
4 Data Settarnhar 7.1990 e Ompleted by. M. A. Wirrsar Telephone (412)393-7621
-i K NIH August 1990 x
IAY AVERAGE IRILY 10WER IEVEL DAY AVERAGE IAILY ICWER IEVEL -;
(We-Net) (We-Net) ',
-1 794 17 769 1
2- 790 18 765 3 782 19 773 ~'
4 782 20' 777 5 773 21 777
'6 ' 786 22 757-7- 782 23 757-i 8 794 24 716
! 9 786 25 418 10 782 26 377 1 I 11 - 781 27 377
~
-1 12 782 28 377- -
s
~13 377 29 381 g . 14 262 30 389 L,<
h 15 765 31 381 16 753 INSTRUCTIG4S l
On this. format, list the average daily unit power level in W e-Net for each day ii in the reporting month. Ocupute to the nearest whole megawatt, i l
l i.
n-t
+ , -
.' *'= -
NARRATIVE SLD99M OF M0tmEX OPERATING EXPERIDICE ;
r UNIT II 5 AUGUST 1990 .
I i
August 1 'Ihe Unit operated at a runinal value of 100% output.
through -
August 11
<gy [
August 12 At 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br /> the Unit's output was r=+v=9 to 27% to permit repairs to the 'C' Main Feedwater Flow Control Valve.
August 13 The Unit operated at approximately 27%' output to permit repairs to the 'C' Main Feedwater Flow Control Valve.
(
August-14 At =1205 hours the ' Unit's output was incrua wl to !
approximately 97%.
- August 15 The Unit operated at approximately 97% output, through '
August 23 Atxfast 24 At 1605 hours0.0186 days <br />0.446 hours <br />0.00265 weeks <br />6.107025e-4 months <br /> the Unit's output was reduced to 55% to stretch the current fuel cycle.
August 25 The Unit operated at 55%-output to stretcts the current -
through fuel cycle.
August.31 i
August 31 At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit's output was ra+vwi to 40% at System 4 Operator request.
i 1
-l o
~
t
~
i l
l IMIT SUIDEME AIO RMR IHilCEIDE Dodest No. - ' 50-412 ~
l ' LRiit Name - tus tant mz
!. ~ Data M --- - 7. '-
l NERRP KNDI MIIBF 1,1990 eted By M.A. M1rtaur -
(412) .res-mn
(.
~
Dethod of . T3<wenee n= == & us u ve DRatiG) sum 1 Bm!rt 85tMM mz d. . MWWI to No. . Dste 'Iypel (then) Iaswwrw12 Dahn M Itgxrt i Prevert Dnavemos o
23 900812 F 0 B 'S YA CH VADEX tilit's output twtrud to 27% to '
t rgmm to the 'c' semin Flow Cuntzot Vinive.
24 900824 S O H 5 j
WA ZZ ~ T17171. thit's output rsarid to 55% to
. stretx21 ttfe onrumt fuel cycle.
-i i
f
-I 1 2 3 4 P-Rxced Reastn: Itthod: Delibit G-Irstzutias fx SHSdnilled A-#unir==rt Faihre (EWplain) 1-ftnal 4 Sheets B-feiirixmmice or Test _ ~ 2-termaal Stran FxYwv=101 fcr 1seeofBart Data (Ist) File 04anemlir1g 3-as w w Sa an Diasmi p=*ri,+1rwi- (MHD0161) . -
EC ; .__ ' ' 4-Ort'd. from Previcts Ptzith
& Tirs=1se Ex2sa 5 p drtian 5 F-AIttainihive 9-Otf1Er ENhibit I h Source.
i (Eglain)
-)
?
y.7, ..
_9 .w .y .%_ , , . ~ , 3-y.. a y. ,.c .-
=,o-
-p'.. ..
.- -q l
OPERATING-DATA REPORT I DOCKET No.: 50 412 REPORT DATE: 09/07/90 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 393-7621 I
.1 OPERATING STATUS 1.' UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING-PERIOD: AUGUST 1990
- 3. LICENSED THERMAL POWER (MWt): 2652
- 4. NAMEPIATE RATING (Gross MWe): 923 !
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870 '
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 820
'I
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT. GIVE REASONS:
)AX. )E 'E9)AB"2 CAPAC"TY (NET MWe) UAS REDUCED TO 820 MW AND PAX. )E.8E4 )AB' E CAPAC::TY (GROSS MWe) WAS REDUCED TO 870 MW
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (Net MWe): None .
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A f
THIS MONTH YEAR TO DATE CUMUIATIVE ,
- 11. HOURS IN REPORTING PERIOD: 744.0 5831.0 24446.0 [
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 744.0 5723.4 21280.0
- 13. REACTOR RESERVE SHUTDOWN HOURS: . 0.0 0.0 . 0.0
- 14. HOURS CENERATOR WAS ON-LINE: 744.0 5716 0 21142.9 j!
'15. UNIT RESERVE SHUTDOWN HOURS: .
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MWH): 1664072.0 11902174.0- 50714918.4
- 17. CROSS' ELECT ENERGY GEN. (MWH): .519400.0 3796100.0 16262200.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 488637.0 3569948.0 15326423.0 l
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 98.0 86.5 ;
20.' UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 98.0 86.5. i!
- 21. UNIT CAPACITY FACTOR-(MDC); PCT- 80.1 73.7 75.3 .
22.- UNIT CAPACITY FACTOR (DER): PCT 78.6- 73.2 '75.0
- 23. UNIT IVRCED OUTAGE RATE: (PERCENT) 0.0 2.0 5.5
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):
'THE UNI" SHUT XW SEPTEMBER 4.1990 FOR ITS SECOND REFUELING OUTAGE. THE OUTAGE ::S Smar t" .Fh TO BE COMPLETED BY THE THIRD WEEK IN NOVEMBER 1,9,,90.
- p 25. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: ,
26... UNITS IN TEST STATUS (PPIOR TO COMMERCIAL OPERATION):
L.
FORECAST ACHIEVED L
INITIAL CRITICALITY N/A _ N/A l: INITIAL ELECTRICITY N/A _ N/A-f COMMERCIAL OPERATION N /A _,, _ N/A l
- 1 >
1:
l; e-- _. -. . ,, ,- - _ . _ - _ _ _ . - - _ _ _ _ . .___--------____-____-____--.;