ML20059K753

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1990 for Beaver Valley Power Station Units 1 & 2
ML20059K753
Person / Time
Site: Beaver Valley
Issue date: 08/31/1990
From: Sieber J, Winger M
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9009240214
Download: ML20059K753 (9)


Text

r w

i ^

f.. _

r Q

l

'Af J

Teiephone Hi?) 393-6000 Nuclear Oroup =

r P O Box 4 s

Shippmgport PA 15077 0004.

7 gg -

1 i

Beaver Valley Power Station Unit 1 - Docket No. 50-334, Lioerse.No. DPR-66 Unit 2 - Docket No.-50-412,' License No. NPF-73 1

Monthly Operatirn Report j

,o:

~

.6j s

P U. S. Nuclear Regulatory. Ccm nission

,,c Wn=nt Can'rol Desk '

Washington, D.C.

20555 Gentlemen:.

In.accordance with Appendix A,

Technical Specifications, the Monthly i

Operatirq Report is sutznitted for Unit 1 and Unit 2; for the month of August, l

l.

1990.

L Also note lthat Deaver-- Valley Unit II is c W ing its Maximum Dependable l'

-Capacity- (net PMe) frun 833 to 820 PMe and Maximum Dependable Capacity. (Gross PMe) 'from 885 to 870144e.;

'i L,"

Veryltrulyyours, h,+

(

J.:D.-Sieber Vloe President f'

Nuclear Group d

Lic 1

MAW /nd o.

Enclosures I

ac:.NRC Regional Office.

h, it f

J King of Prussia,- PA l-9009240214 900831 R

l PDR ADOCK 05000334.

I R

PNV km O n n.,. v 3. #

r5 2-4 J

S

[*

fh I

\\

g,

..=

o 4'

'c AVERAGE DAILY LNIT KMD, IEVEL Docket No. '50-334

-I Unit' BVPS Ur.it 1 Date._ Septeunbar 7, ' 1990 :

Completed by M.A. Winner

'htlephone (412) 393-7621._

MNIH Aucnist 1990

'I e

I DAY AVDtAGE DAILY PJWER IEVEL DAY

' AVERAGE IAILY ICWER IEVEL (We-Net)

(We-Net)

.1 808 17

'800 2

0 18 800 3

109 19 796

.s 4

85 20 800,

9 5-612 21 808 1

,6-788 22 813 7

804 23

'800 8

796

'24 804

-1 9

813 25 796 10' 788 26.

800 11 '-

658 27

_796 12 800 28-792

'13i 808 29 804

-114 808 30 813 15-800 31 800' f16 808

'U INSTRDCTIONS On-_'this format, list the average daily unit power level in MWe-Net fa each' day in the reporting month. Coupute to the nearest whole megawatt.

l l

L-m

,j I s-)

4 L.

t.

e c

OPERATING DATA REPORT i

DOCKET NO.:

50 334 REPORT DATE:

09/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:-

(412)1393 7621 i

OPERATING STATUS i

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: AUGUST 1990
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPLATE RATING (Cross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810

8. IF CHANGES OCCUR IN CAPACITY RATINCS SINCE LAST REPORT, CIVE REASONS:

p I

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A i

1 THIS MONTH YEAR TO DATE CUMULATIVE 11.-HOURS IN REPORTING PERIOD:

744.0 5831.0 125663.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

723.2 5373.1 77511.6:

13. REACTOR RESERVE SHUTDOWN HOURS:
0. 0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE:

711.7 5325.0 75792.5

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0 16.' GROSS THERMAL ENERGY GEN. (MWH):

1779924.0 13349166.0 179429221.5

17. GROSS ELECT. ENERGY GEN.'(MWH):'

568050.0 4338830.0 57608519.0

'18. NET ELECTRICAL ENERGY GEN. (MWH):

535080.0-4076550.0 53773700.0 7

19. UNIT SERVICE-FACTOR: (PERCENT) 95.7 91.3 62.5
20. UNIT AVAILABILITY FACTOR:(PERCENT)-

95.7 91.3 62.5

21. UNIT CAPACITY FACTOR-(MDC): PCT 88.8 86.3 55.8
22. UNIT CAPACITY FACTOR'(DER): PCT 86.1 83.7 54.1
23. UNIT FORCED OUTAGE RATE: (PERCENT) 4.3 3.2 16.7
24. SHUTPOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

i FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A-INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

T NARRATIVE SGMARY OF i

MJtfIHLY OPERATING EXPERIENCE UNIT I AUGUST 1990 ALgust i h Unit operated at 100% output.

August 2 At 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> the Unit -was removed frun service while.

I repairity the number 2 battery charger. At 0152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br /> the unit entered mode 3.

At 2244 hours0.026 days <br />0.623 hours <br />0.00371 weeks <br />8.53842e-4 months <br /> the reactor was taken critical.

Atqust 3 At 0308 hours0.00356 days <br />0.0856 hours <br />5.092593e-4 weeks <br />1.17194e-4 months <br /> the Unit was syndtronized as output escalated to 30%.

Power ascension was halted at 30% to permit improvements to Secondary Steam Generator Water chemistt,f.

Aagust 4 At 0220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br /> the Unit was removed frun service to permit-repairs to the turbine's ele.L sydraulic control system.

At 0858 hours0.00993 days <br />0.238 hours <br />0.00142 weeks <br />3.26469e-4 months <br /> the Unit was syndtronized and the Unit's output was er:alated to 30%.

'Ihe power -lation was halted at 30's to permit inprovements to Secondary Steam Generator Water chemistry.

Atgust 5 At 0155 hours0.00179 days <br />0.0431 hours <br />2.562831e-4 weeks <br />5.89775e-5 months <br /> the Unit's output was asuvilated to 100%.

August 6 h Unit operated at a nominal value of 100% output.

through August 9 August 10 At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit's output was reduced to 45% to penit testing the govemor valve for the main turbine.

August 11 At 0215 the Unit'r, output was -lated to approximately 53%.

'At 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> the Unit's output was escalated to a ncatinal value of 100%.

L August 12 h Unit operated at a ncatinal value of 100% output.

through August 26 August 27 N Unit operated at a ncatinal value of 100% output. At y

1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br /> the Rod Position Indicator for the K-2. Control Rod malfunctioned.

August-28

'Ihe, Unit operated at a ncatinal value of 100% output. At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> the Rod Position Indicator for the K-2 Control Rod was repaired.

E August 29 h Unit operated at a ncatinal value of 100% output.

  • W L

August 31 l~

w

' ~

INIT SUIIX3@l3 MO RMR REI1JCIIGE Dadu!t It). 334 lhit Neue IM S Latt 31

~!

Dinte

% u =- 1. osu eted M.A. Mmtnir -

i HEREP M.NIH MKIEP 1990 f4121 JyJ-Anzl

~

pt!thoql of Liamsee musep & Qtatettive Dratim Suetirry Everit a, a.

Actam to No.

Dette

'Iypel (Haurs) maar:12 Da m Daarf w't Repmt #

Prevelt Heatultumae 27 900802 F

25.6 A

1-1-90-12 BC OGHE thit reuoved frga servim to regaa*r AC Sqnt Cirotalt Breeler fitt #2 statam 28 900803 F

0 H

5 WA ZZ 71 71 71.

Rawer haltjed at 30% to to-W*2-y.

mtur d 29 900804 S

6.6 B

1 WA HA VAIM X thit uns reurwe$ fras service to repair the '1urbine I!1ectrdykmalin j

Qxitrol Systuum.

30 900804 F

0 H

5 WA ZZ 71 71 71.

Howeep marwnim halted at 30t to Mutur duuan 31 900827 F

0 H

9 WA IE DEIRJ Rxi Positicrt Indiout)ar fitr K-2 amitzul Itxt uniftmetacmed.

1 a

1 2

3 4

P-Rroed h

It!thod:

IMtibit Q-Instzutias fiar S-Stivvtikri A-Rusir= art Failure (ENplain) 1-fernal Preputatim of Dsta Suw*n B-ftitinberumae cr 'R!st 2-fernal fiicran fcr Lamsee EWent (IER) File 3,pmenetic Smana (MEED 0161)..

D-9vn a Restrictim 4-Ont'd, fran Previous Itzith E

'aka

& Linmse ENaa 5-Dart w+wrt 5

F 9-Other Exhibit I-Same Satutoe.

GNirwal Eritr (ENplain)

H{iher (Euplain) i l

lc

AVERAGE IRILY LNIT 30WER IEVEL i

Docket No.

50-412' Unit BVPS Unit 2 Data Settarnhar 7.1990 e

4 Ompleted by. M. A. Wirrsar Telephone (412)393-7621

-i K NIH August 1990 x

IAY AVERAGE IRILY 10WER IEVEL DAY AVERAGE IAILY ICWER IEVEL (We-Net)

(We-Net)

-1 794 17 769 1

2-790 18 765 3

782 19 773

~'

4 782 20' 777 5

773 21 777

'6

' 786 22 757-7-

782 23 757-i 8

794 24 716 9

786 25 418 10 782 26 377 1

I 11

- 781 27 377

~

12 782 28 377-

-1 s

~13 377 29 381 g

. 14 262 30 389 L,<

h 15 765 31 381 16 753 INSTRUCTIG4S l

On this. format, list the average daily unit power level in W e-Net for each day ii in the reporting month. Ocupute to the nearest whole megawatt, i

l l

i.

n-t

+

  • ' =

NARRATIVE SLD99M OF M0tmEX OPERATING EXPERIDICE r

UNIT II 5

AUGUST 1990 I

i August 1

'Ihe Unit operated at a runinal value of 100% output.

through August 11

[

<gy August 12 At 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br /> the Unit's output was r=+v=9 to 27% to permit repairs to the 'C' Main Feedwater Flow Control Valve.

August 13 The Unit operated at approximately 27%' output to permit repairs to the 'C' Main Feedwater Flow Control Valve.

(

August-14 At

=1205 hours the

' Unit's output was incrua wl to approximately 97%.

August 15 The Unit operated at approximately 97% output, through August 23 Atxfast 24 At 1605 hours0.0186 days <br />0.446 hours <br />0.00265 weeks <br />6.107025e-4 months <br /> the Unit's output was reduced to 55% to stretch the current fuel cycle.

August 25 The Unit operated at 55%-output to stretcts the current -

through fuel cycle.

August.31 i

August 31 At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit's output was ra+vwi to 40% at System 4

Operator request.

i 1

-l o

t

~

~

i l

IMIT SUIDEME AIO RMR IHilCEIDE Dodest No. - ' 50-412

~

l l

' LRiit Name - tus tant mz

~ Data M --- - 7.

eted By M.A. M1rtaur -

l NERRP KNDI MIIBF 1,1990 (412).res-mn

(.

T3<wenee n=== & us u ve

~

Dethod of.

DRatiG) sum 1 Bm!rt 85tMM mz d..

MWWI to No..

Dste

'Iypel (then)

Iaswwrw12 Dahn M

Itgxrt i Prevert Dnavemos 23 900812 F

0 B

'S YA CH VADEX tilit's output twtrud to 27% to '

o t rgmm to the 'c' semin Flow Cuntzot Vinive.

24 900824 S

O H

5 WA ZZ ~

T17171.

thit's output rsarid to 55% to j

stretx21 ttfe onrumt fuel cycle.

-i i

f

-I 1

2 3

4 P-Rxced Reastn:

Itthod:

Delibit G-Irstzutias fx SHSdnilled A-#unir==rt Faihre (EWplain)

~ 2-termaal Stran 1-ftnal FxYwv=101 of Data 4

Sheets B-feiirixmmice or Test _

fcr 1see Bart (Ist) File 04anemlir1g p=*ri,+1rwi-3-as w w Sa an (MHD0161).

Diasmi 4-Ort'd. from Previcts Ptzith EC ;.__

& Tirs=1se Ex2sa 5 p drtian 5

F-AIttainihive 9-Otf1Er ENhibit I h Source.

(Eglain) i

-)

?

  • i4

.%.4 y.m

.e y.7,

_9

.w

.y

,,. ~,

3-y..

a y.

,.c

-p'..

=,o-

-q l

OPERATING-DATA REPORT DOCKET No.:

50 412 REPORT DATE:

09/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 393-7621

.1 OPERATING STATUS 1.' UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes

2. REPORTING-PERIOD: AUGUST 1990
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPIATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

870

7. MAX. DEPENDABLE CAPACITY (Net MWe):

820

'I

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT. GIVE REASONS:

)AX.

)E 'E9)AB"2 CAPAC"TY (NET MWe) UAS REDUCED TO 820 MW AND PAX.

)E.8E4 )AB' E CAPAC::TY (GROSS MWe) WAS REDUCED TO 870 MW

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A f

THIS MONTH YEAR TO DATE CUMUIATIVE

11. HOURS IN REPORTING PERIOD:

744.0 5831.0 24446.0

[

12. NO. OF HRS. REACTOR WAS CRITICAL:

744.0 5723.4 21280.0

13. REACTOR RESERVE SHUTDOWN HOURS:
14. HOURS CENERATOR WAS ON-LINE:

0.0 0.0 0.0 744.0 5716 0 21142.9 j!

'15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. CROSS THERMAL ENERGY GEN. (MWH):

1664072.0 11902174.0-50714918.4

17. CROSS' ELECT ENERGY GEN. (MWH):

.519400.0 3796100.0 16262200.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

488637.0 3569948.0 15326423.0 l

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 98.0 86.5 20.' UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 98.0 86.5.

i!

21. UNIT CAPACITY FACTOR-(MDC); PCT-80.1 73.7 75.3 22.- UNIT CAPACITY FACTOR (DER): PCT 78.6-73.2

'75.0

23. UNIT IVRCED OUTAGE RATE: (PERCENT) 0.0 2.0 5.5
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE.AND DURATION OF EACH):

'THE UNI" SHUT XW SEPTEMBER 4.1990 FOR ITS SECOND REFUELING OUTAGE. THE OUTAGE ::S Smar t".Fh TO BE COMPLETED BY THE THIRD WEEK IN NOVEMBER 1,9,,90.

p

25. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:

26... UNITS IN TEST STATUS (PPIOR TO COMMERCIAL OPERATION):

L.

FORECAST ACHIEVED L

INITIAL CRITICALITY N/A

_ N/A l:

INITIAL ELECTRICITY N/A N/A-f COMMERCIAL OPERATION N /A _,,

N/A l

1 1:

l; e--

_. _ - _ _ _. - - _ _ _ _..___--------____-____-____--.;