Forwards Requalification Program Insp Rept 50-213/93-20 on 931004-08.No Violations or Unresolved Items Noted
ML20059K503
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/04/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20059K504 List:
References
NUDOCS 9311160081
Download: ML20059K503 (3)


See also: IR 05000213/1993020

Text

..

J

c^

.,.

.

NOV

41993

Docket No. 50-213

Mr. John F. Opeka

Executive Vice President - Nuclear

Connecticut Yankee Atomic Power Company

P.O. Box 270

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT: REQUALIFICATION PROGRAM INSPECTION REPORT NO. 50-213/93-20

'

During the period of October 4-8,1993, the NRC staff conducted an announced inspection of

your licensed operator requalification training program for the Haddam Neck plant. The

inspection was conducted utilizing NRC Temporary Instruction (TI) 2515/117, " Licensed

Operator Requalification Program Evaluation." The purpose of this TI was to evaluate the

acceptability of your licensed operator requalification training program through a

performance-based inspection in lieu of an NRC staff requalification examination of licensed

operators. The proper implementation of the licensed operator requalification training

program directly relates to safe facility operations.

The inspection included a review of the same attributes as those normally evaluated during a

requalification examination, including the observation and administration of the operating and

3

written examination. Additionally, selected programmatic aspects of the requalification .

training program were reviewed, including, but not limited to, a review of administrative

procedures, interviews with licensed operators and training personnel, and the identification

of, if any, operator performance deficiencies, which were subsequently included as part of

the training process.

Based upon the results of this inspection, it was determined that the Haddam Neck

l

requalification training program is being implemented in accordance with the requirements of

10 CFR 55.59 for the areas reviewed. The inspectors concluded that the Haddam Neck

requalification program was meeting its objective of maintaining safe and competent

operators.

At the conclusion of the inspections, the findings were discussed with Mr. B. Ruth and those

members of your staff identified in the enclosed report. Representatives of your staff

acknowledged the inspection findings. No response to this letter is required.

.

-l

9311160001 931104

OFFICIAL RECO'RD COPY

G:HN9320. INS

1

,

PDR

ADOCK 05000213-

'

'

V

PDR

'

-

v

,

L..

-

_

.-

___.

__.

.:4

Nov 41993:

iy

,

t

Mr. John F. Opeka

2

In accordance with 10 CFR 2,790 of the Commission's regulations, a copy of this letter and

-

the enclosure will be placed in the NRC Public Document Room.

Should you have any questions regarding this inspection, please contact me at (215)

j

'

337-5291.

i

Sincerely,

4

4

2

c.

1

l

Ixe H. Bettenhausen, Chief

Operations Branch

+

Division of Reactor Safety

.

l

Enclosure:

Inspection Report No. 50-213/93-20

.ly

cc w/ encl:

'

W. D. Romberg, Vice President, Nuclear, Operations Services

J. P. Stetz, Vice President, Haddam Neck Station

,

S. E. Scace, Vice President, Millstone Sta. ion

J. Solymossy, Director, Nuclear Quality and Assessment Services

D. J. Ray, Unit Director

R. M. Kacich, Director, Nuclear Licensing

Gerald GarDeld, Esquire

Nicholas Reynolds, Esquire

-

K. Abraham, PAO (2)

l

Public Document Room (PDR)

!

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

.!

NRC Resident Inspector

State of Connecticut SLO

>

bec w/ encl:

Region I Docket Room (with concurrences)

OL Facility File

i

bec w/enci(VIA E-MAIL):

J. Stolz, NRR/PD I-4 -

V. McCree, OEDO

A. Wang, PM, NRR

3

OFFICIAL RECORD COPY

G:HN9320. INS

i

!

fy

n

i

..

NOV

4 1993

c,

'

.4

'

i

. Mr. John F. Opeka

3

!

(VIA E-MAIL AND NO ATTACHMENTS

L. Bettenhausen, DRS

j

G. Meyer, DRS

'

P. Bissett, DRS

K. Ihnen, DRS

,

!

.

.

i

.

!

'!

,

.i

.

.,

.:

,

f!/h

R DRS

RI:DRS

RI:DRS

N

Bettenhausen

Bissett/dr:.g

.

. ) yerkl

N

11/pn 93

I $793

11/4/93

[

.

3

OFFICIAL RECORD COPY

G:HN9320. INS

<+

,

.,