Text
r i
&b8!!' memorandum Oct,ober 26, 1993 CHEM.92-005 i
11YSDEC - Division of Water Source Surveillance Section Bureau of Wastewater Facilities Operations l
50 Wolf Road - Room 320 i
Albany, Hew York 12233-3506 i
Re:
Monthly Discharge Monitoring Report Perini t #0004472 Con Edison Indian Point Units 1 and 2 How York Power Authority Indian Point Unit 3 Gentlemen:
4 Enclosed are the Discharge Monitoring Reports '(DMR) for the month of September 1993.
A Notice of non conformance to the permit is' attached.
Explanation for deviations from the permitted circulator flows are forwarded to the Department of Environmental Conservation as they occur and, therefore, are not enclosed.
P If you have any questions regarding this submissio'n, please contact Mr. Reynolds Burns of Con Edison at (914)734-5q05 or Mr. James Gillen of New York Power Authority at (914)736-8450 Ve$y trlily yours, i
i
, f(nkt{},
' Uwe -
St'ephen F. Quinn
~~
General fanager Nuclear Power Generation Con kdison, Indian Point I and 2 Attachment I
/km I
f/ ';(>
2sona 9402010255 931026 DR ADDCK 05000003 PDR e
n A
NOTICE OF NON CONFORMANCE SPDES PERMIT #0004472 i
i 1
'the liidian Point Site has been unable to maintain the required 1.75-foot head differential in the discharge canal under all operating conditions. This was originally believed to have been due to a combination of erosion from beneath the gates and with gate operation. Repair work to correct the gates problems is completed.
Further inspection performed during the course of the ongoing repair program revealed that additional structural repairs to the discharge canial are necessary (see letter of June 18,1993 from NYPA to DEC). The new repair activities are expected to take place at the end of 1993. This schedule assumes the thnely receipt of approvals for the rehabilitation work from the Army Corps of Engineers.
I I
t l
i i
i l
e J
l P
I l
l
Edih8lmemorandum r
INDIAN POINT STATION JUNE 22,1993 10:
DISinlBUllON FROM:
Stephen D. Dram Vice President, fluclear Power
SUBJECT:
Delegation of Responsibility Duilng the period that Stephen E. Oulnn, Generel Manager of Nuclear Power Generallon is assigned to INPO's on loan program, Thomas Schmelser, Acting General Manager is delegated all the dulles and responsibilities of the position.
i
.L p el hen B. Bram j
I I
I i
I i
/seO622/93 i