ML20059J858
| ML20059J858 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/07/1993 |
| From: | Broughton T GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20059J859 | List: |
| References | |
| C311-93-2140, NUDOCS 9311150082 | |
| Download: ML20059J858 (1) | |
Text
.
GPU Nuclear Corporation '
u,
.f -
g gf Post Office Box 480 Route 441 South Miodletown, Pennsylvania 17057 0191 7
1 717 944 7621 l
TELEX 84 2366 Writer's Direct Dial Number:
717-948-8005 l
November 7, 1993 C311-93-2140 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
Three Mile Island Nuclear Generating Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Cycle 10 Core Operating Limits Report, Revision 0 Pursuant to TMI-1 Technical Specification Section 6.9.5.4, enclosed is a copy of the Cycle 10 Core Operating Limits Report,. Revision 0.
The Cycle 10 Core Operating Limits Report ' also incorporates protective and maximum allowable 1
- setpoint limits - for axial power imbalance and the trip setpoint.for nuclear overpower based on RCS flow currently included in Technical Specification Sections 2.1.2 and 2.3.1 to support THI-1 Technical Specification Change Request No. 234 to be submitted to NRC in November 1993.
The cycle-specific core operating limits contained in this report have been determined in accordance with Technical Specification 6.9.5.
If additional information is required, please contact us.
Sincerely, T. G. Broug on Vice President and Director,.TMI-1 TGB/DJD/ame Enclosure cc: Region I, Administrator
/
O
.TMI-1 Senior Resident Inspector Of
'TMI-1-Senior Project Manager 9311150082 931107 E.
-11009O
/[/.
PDR ADDCK 05000289 g
/
i
~V P
PDR g
GPU Nuclear Corporation.is a subsidiary of General Pubhc Utihties Corporation