Text
-.. _ _ -..
--~~
'4 aw
,,,w l
0J ^
$e UNITED STATES I
j NUCLEAR REGULATORY COMMISSION l
7 s.
wasumorow. o. c.aoses 3
.7[
[
J f
~ COMMONWEALTH EDISON COMPANY DOCKET N0. 50-373
' i i
LASALLE COUNTY STATION, UNIT 1 AMENDMENT TO' FACILITY OPERATING LICENSE Amendment No. 75 License No. NPF-11 1.
The Nuclear Regulatory Comission (the Comission) has found-tha't:
l A.
The application for amendment filed by the Comonwealth Editon Company (the licensee), dated May 16, 1990, complies with the standards and requirements.of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's ragulations set forth in 10 CFR Chapter I; B.
The facility will operate'in conformity with the application, the provisions of.the Act, and the regulations of the Comission; C.
There is reasonable assurance: (1)thatthe'activitiesauthorizedby=
this amendment can be conducted without endangering the health and safety of the public.and (ii) that such activities will be conducted s
in compliance with the Comission's regulations set forth in 10 CFR i
Chapter I; j
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and l
E.
The issuance of this amendment lis in accordance with 10 CFR Part 51 l-of the Commission's regulations and_all applicable requirements have been satisfiet 2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the enclosure to this license amendment and paragraph
-2.C.(2) of the Facility Operating License No. NPF-11 is hereby amended to read as follows:
l I
1 9009200200 900913 9'
ADOCK0500g3 DR
- 1
.~..
__.._1_,...
- - -.....--.,... -., _ __. 1
L l
i 2
l I
(2) Technical Specifications and Environmental Protection Plan The Technical-Specifications contained in Appendix A, as revised I
through Amendment No. 75, and the Environmental Protection Plan contained in A>pendix B, are hereby incorporated in the license.
i The' licensee s tall operate the facility in accordance with tiie Technical Specifications and the Environmental Protection Plan.
3.
This amendment is effective upon date of issuance.~
FOR THE NUCLEAR REGULATORY COMMISSION l
Vk Ric9a'J.BarrettDirector Project Directorate III-2 Division of Reactor Projects - III, l
IV, Y and Special Projects
.0ffice of Nuclear Reactor Regulation l
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 13, 1990 o
l 1
8 A
t.
l
' 4 ATTACHMENT TO LICENSE AMENDMENT NO. 75 rACILITY OPERATING LICENSE N0.' NPF-11 DOCKET NO. 50-373 Replace th'. rollowing pages of the Appendix 'A' Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and contain a vertical line indicating the area of change.
REMOVE INSERT 3/4 8-4 3/48-4 3/4 8-6' 3/4 8-6 1
kk i
9
ELE'CTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS 6.
Verifying the diesel generator is aligned to provide standby power to the associated amergency busses.
7.
Verifying the pressure in all diesel generator air start receivers to be greater than or equal to 200 psig.
b.
At least once per 31 days and after each' opera +1on of the diesel where the period of operation was greater' than or equal to I hour by checking fcr and removing accumulated water _ from the day fuel tanks.
c.
At least once per 92 days and from new fuel oil prior to addition to the storage tanks by verifying that a sample obtained in accordance-with ASTM-D270-1975 has a water.and sedirint content of less than or equal to 0.05 volume percent and a kinematic viscosity 9 40'C of greater than or equal to 1.9 but less than or equal to 4.1 when.
tested in accordance with ASTM-0975-77, and an impurity level of less than 2 mg of insolubles per-100 ml.when tested in accordance-with ASTH-02274-70.
d.
At least once per 18 months during shutdown by:
1.
Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service.
2.
Verifying the diesel generator capability
- to' reject a load of greater than or equal to 1190 kW for diesel generator 0, greater than or equal to 638 kW for diesel generators 1A'and 2A, and greater than or equal to 2421 kW for diesel generator IB while maintaining engine speed less than or equal to 75% of the difference between nominal speed and the overspeed trip setpoint or 15% above nominal, whichever is:less.
3.
Verifying the diesel generator capability *'to reject a load of i
2600 kW without tripping.
The_ generator voltage,shall not exceed 5000 volts during and following the load rejection.
4.
Simulating a loss of offsite power
- by itself, and:-
a)
For Divisions 1 and 2 and for Unit 2 Division 2:
1)
Verifying de-energization of the emergency busses and load shedding from the emergency busses.
- All planned diesel generator-starts performed for the purpose of meeting these surveillance requirements may be preceded by an engine prelube period, as recommended by_the manufacturer.
LASALLE-UNIT 1-3/4 8-4 Amendment'No. 75 q
4
n
.=.
',t [
L5
-l 6
d
.;ENCTRICAf,POWERSYSTEMS SURVEILLANCE REQUIREMENTS (Continued)-
1 i
2)L Verifying the diesrul, generator starts on the auto-start signal.. energizes'the emergency busses with permanently; connected loads within 131.econds, energizes the.
auto-connected emergency loads through the load sequencer and operates for greater than or equalito 5 minutet while its generator is' loaded with the U
, emergency loads.
After energization, the; steady
~ state voltage and frequency of the emergency busses _
shall be maintained at 4160.1416 volts and 60 11.2 Hz' i
during this, test.
b)T 'For Divisi,n 3:-
1)
Ve'i')ing de'energization of the emergency bus.
h
,2)
Ver m ',,gthe diesel generator _ starts on the auto-start I
signal energizes the emergency bus'with'its. loads' Li within 1. seconds and operates for greater than or
.i equal to i minutes whilelits generator _istloaded with the emergency loads. "After'energ zation, the steady:
r state voltage and; frequency of the emergency bus f
shall be maintained at-4160 1416 volts and 60 11.2 Hz i
during this test.
i 7.
Verifying that all diesel generator 0,-1A, and IB automatic trips except the following are automatically bypassed on an ECCS actuation signal: _
7 a)
For Divisions 1 and 2
. engine ~overspeed, generator differential current,-and emergency manual stop.
l b) for Division 3.- engine overspeed.: generator. differential-t j
current, and emergency: manual stop.-
8.
Verifying the diesel generator' operates *-for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of.this test,:the diesel generator shall be loaded to greater then or equal to' 2860 kW and during.
i the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test,-the diesel-sgenerator shall=
be loaded to -2400 kW -to 2600 kW.*** The generator voltage and -
frequency-.shall be 4160 +420e -150 volts and=60 +3.0, -1.2 Hz-within 13= seconds.after the start. signal; the steady state 3
- All planned diesel generator starts performed.for the purpose of neeting these' surveillance requirements may be preceded by an engine prelube period,
.as. recommended by the manufacturer.
- Transients, outside of'this load band, do not invalidate the' surveillance tests.
)
LASALLE-UNIT 1 3/4 8-6 Amendment No. 75 q -
,[(_ s.pynf
'~'k UNITED 8TATES -
- NUCLEAR REGULATORY COMMISSION-ti
' WASHINGTON, D, C 20886
- k*ses q
i COMMONWEALTH EDISON COMPANY DOCKET NO. 50-374-LASALLE COUNTV STATION, UNIT 2-AMENDMENT-TO FACILITY OPERATING LICENSE Amendment No. 59 License No. NPF-la i
1.
The Nuclear Regulatory Comission (the C' omission)- has found that:-
A.
The application for amendment-filed by the Commonwealth Edison
)
Company (the licensee), dated,May 16, 1990, complies with'the i
standards and requirements:of;the Atomic Energy Act of 1954, as amended (the Act), and-the Comission':,1 regulations set forth:in.
10 CFR Chapter,1;
.q B.
The facility will operate in conformity-with the1 application the-provisions of the Act, and the regulations of the Comission; C.
There is-reasonable assurance: (i)=thattheactivitiesauthorizedby
~this amendment can-be conducted without endangering the health and-o safety of the public,-and (ii) that such activities will-be conducted-in compliance with:the Comission's' regulations set forth in'10 CFR Chapter I; D.
The issuance of this amendment will not'be inimical.to'the common defense and security or to the health and safety of:the public; and.
~
1 E.
The' issuance of this-amendment is in accordance with 10 CFR Part 51 1
-of the Comission's regulations and tll applicable requirements have b^en satisfied.-
'2.
Accordingly, th'e license <ls amended by changes to the Tednical Specifica-i tions as int.icated in the enclosure to this. license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-18 is-hereby amended to read as follows:-
1 1
I.,
1 l
n
1.-
\\:
. (2) Technical Specifications and Environmental Protection Plan
~
The Technical Specifications' containedLin Appendix A, as revised through Amer.damid No. 59 and the Environmental Protection Plan-contained in Appendix B, are hereby< incorporated-in the license.
The -licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan..
3.
.Thisamendmehtis.effectiveupondateofiisuance.
FOR THE NUCLEAR REGULAT RY; COMMISSION _
1 i
i l
I Richard arrett, Director Project Directorate III-2'
' Division of Reactor Projects - III, IV, V and Special Projects..
Office of Nuclear Reactor Regulation Attachn. ant:
Changes toLthe Technical 1
Specifications-4 y
.Date of Issuance:
September 13, 1990 i
s i
i
\\
-i
)
' I
- ATTACHMENT TO LICENSE AMEN 0 MENT IH). 59 -
FACILITY OPERATING LICENSE NO. NPF-18
- DOCKET NO. 50-374-Replace the following'pages of the' Appendix "A' Technical Specifications lwith the enclosed pages. The revised pages'are-identified by amendment number and contain a vertical line indicating the area ofichange.
REMOVE' INSERT.
3/4 8 A 3/4 8 1
'3/4 8-6 3/4 8-6 1
i c
i l~..
4 i '.
. I.
l'
.*7.-
q
'g d
.~
ELECTRICAL' POWER SYSTEMS 4
SURVEILLANCE REQUIREMENTS 6.
. Verifying the diesel. generator is aligned to provide standby.
power to the associated emergency busses.
7.
-Verifying,the pressure in all diesel generator air start receivers to be greater-than or equal to 200 psig.
b.'
At least once per 31 days and af ter each operation of the diesel where the period of operation was' greater than or equal-to I hour by checking.-for and removing accumulated water from the dey fuel tanks.
. At least' once per 92 days and from new fuel oil prior to addition.to c.
the storage tanks'by verifying that i sample:obtained in accordance with ASTM-D270-1975 has'a water and sediment content-of less than or-equal to 0.05 volume percent and a kinematic-viscosity.9 40'C of-greater than.or, equal.to 1.9 but-less than or equal to.4.1'when-tested in accordance with ASTM-0975 -
- nd an impurity level of:
~1ess than 2'mg of insolubles per 100 -
when tested in accordance with' ASTM-D2274-70.
I d.
At least once per 18 months during shutdown by:
1.
Subjecting the diesel.to an inspection in accordance with-procedures prepared in conjunction with its manufacturer's recommendations for this class of? standby. service ~.
2.
Verifying the diesel generator capability
- to reject a-load of greater-than:or equal.to 1190 kW for diesel generator 0, greater than or equal,to 638 kW for diesel; generators 1AJand 2A,~and greater than or equal lto 2421 kW-for diesel generator 28.while maintaining engine speed less than or equal < to.75% of the difference between nominal speed and the overspeed trip'setpoint, or 15% above nominal, whichever is less.
3.
' Verifying the diesel generator. capability
- to reject a load'of-2600 kW without' tripping.- The' generator, voltage..shall not -
exceed 5000 volts.during and following the' load: rejection.
4.
Simulating a loss of offsite power * ~by~ itself, and:
a)
For. Divisions 1 and 2 and for Unit 1 Division ~2:
.1)-
Verifying de-energization of~the emergency busses and
~
load shedding from the emergency busses.'
- All"p1'anned diesel generator starts performed for the purpose of meeting these surveiliance requirements may be preceded bf an engine prelube. period, as recommended by-the manufacturer.
~ /4'8-4" Amendment No. 59-
-LASALLE - UNIT 2 3
4 oj.
?
1 o
ELECTRICAL POWER' SYSTEMS-1 SURVEILLANCE REQUIREMENTS (Continued)
- j 2) 1 Verifying the diesel generator starts on the auto-start
-l L
- signal, energizes the emergency busses.with permanently
)
connected loads _within:13 seconds, energizes the.
. auto-connected emergency loads through the load.
sequencer and operates for' greater than'or. equal to-
'I 5 minutes while its generator is loaded ^with the:
emergency loads.
After energization, the' steady l
. state voltage and frequency of the emergency busses-1
'a maintained at 4160 1416 volts and 60.11.2 Hz-L
~is. test.
.1
'b)
ForJ
. s... 2.
'1) L Verifying de-energization of ' ' emergency b' us...
L 2)
Verifying tb. diesel generatot
$. arts on the' auto-start:
signal, energizes the, emergency bus with-itsl loads-withln 13 seconds and operates for greater than or-equal to 5 minutes while its generator isL oaded with l
the energency loads. 'After energization, the steady state voltage and frequency lof the: emergency bus t
shall be maintained at 4160'i416 volts and.60.11.2 Hz during this test.-
L 7.
~Verifyingtaatalldieselgenerator0,2A;and28-automatic-trips except thi following are' automatically bypassed on-an ECCS actuation signal:
a).
For Divisions 1 and 2 -engine overspeed, generator differential current, and emergency manual stop.
?
I b)
For Division 3'--engine overspeed, generator differential current, and emergency manual stopt 8.
Verifying the diesel generator operates
- for et least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />;of this test, the-diese1Lgenerator shall be loaded to greater than or equal,to 2860 kW and during the remaining 22. hours-of-this test,.the diesel' generator shall J
be loaded to 2400.kW to 2600 kW.*** The generator-voltage and frequency shall be 4160 +420, -150 volts and 60 +3.0, -1.2 Hz' within 13,secon(s after the' start signal; the' steady-state:
i
- All planned diese3 generator starts performed for the purpose of meeting...
i these surveillance-requirements'may bel preceded by an engine preluw per.fod,.
as recommended by the manufacturer.
^^* Transients, outside of this loari band, do not invalidate the surveillance-tests.
)
LASALLE,- UNIT 2 3/4 8-6 Amendment No. 59-
.