Notification of Significant Licensee Meeting W/Util on 940203 to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Mar 1994 Refueling Outage
ML20059J781
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/21/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9402010172
Download: ML20059J781 (2)


Text

p HCu UNITED STATES fg NUCLEAR REGULATORY COMMISSION o

REGION IV 3

8 e[ '

611 RYAN PLAZA DRIVE, SUITE 400 t

o,

.Af t LINGTON, T EXAS 760114064 JAN 21 1994 NOTICE OF SIGNIFICANT LICENSEE MEETING Nane of Licensee:

Entergy Operations, Inc.

Name of Facility:

Waterford 3 Docket No.:

50-382 Date and Time February 3, 1994 of Meeting:

1 p.m. (CST) location of Meeting: Waterford 3 Administrative Building Auditorium j

Purpose of Meeting:

Meeting to discuss safe shutdown risk and other issues associated with the scheduled March 1994 refueling outage NRC Attendees:

W. Beckner, Director, Project Directorate IV-1, Office of Nuclear Reactor Regulation (NRR) l T. Stetka, Chief, Project Section D, Division of Reactor Projects (DRP)

E. Ford, Senior Resident Inspector, DRP D. Powers, Chief, Maintenance Section, Division of Reactor Safety D. Wigginton, Project Manager, NRR J. Dixon-Herrity, Resident Inspector, DRP J. Gilliland, Public Affairs Officer C. Hackney, Regional State Liaison Officer Licensee Attendees:

R. Barkhurst, Vice President, Operations D. Packer, General Manager, Plant Operations i

R. Burski, Director, Nuclear Safety R. Azzarello, Director, Design Engineering D. Shipman, Planning & Scheduling Manager R. Starkey, Operations & Maintenance Manager L. Laughlin, Licensing Manager NOTE:

(1) Attendance by other NRC personnel at this meeting should be made known by COB on February 1 via telephone call to Tom Stetka at 817/860-8247.

(2) This meeting is open to attendance by members of the general public.

hj l

Approved By:

d A/ Bi'l Beach, Director

, p g 7. g 6ivision of Reactor Projects c

~

9402010172 940121 f

PDR ADOCK 05000382

?

P PDR l

Ig

Entergy Operations, Inc. !

l l

Distribution:

DMB (IE 45) i i

J. H. Sniezek, DEDR (MS 17G21)

H. L. Thompson, DEDS (MS 17G21) l T. E. Murley, D/NRR (MS 12D1)-

W. T. Russell, ADT/NRR (MS 12G18)

J. G. Partlow, ADP/NRR (MS 12D9) l' J. Lieberman, D/0E (MS 7H5)

L. J. Chandler, OGC (MS 15B18) i OED0 RIV Coordinator (MS 17G21) i L. J. Callan, RA l

J. M. Montgomery, DRA l

G. F. Sanborn, E0 i

C. A. Hackney, RSLO l

J. Gilliland, PAO, RIV-NRC Attendees i

RA Secretary i

Carol Gordon Division Secretary (DRP, DRSS) 4 j

L. S. Ousley RIV File i

e I

l

- t 1

RIV:C:DRP/D P

RSL D:DRPbb

, eTFStetka;df

JTGilT* and C

ey ABBeach f94-1/%94 1/71/94 1/g/

1 i

s,

~ -