Forwards Insp Repts 50-498/93-45 & 50-499/93-45 on 931107-1218.No Violations Noted
ML20059J734
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/25/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cottle W
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20059J740 List:
References
NUDOCS 9402010147
Download: ML20059J734 (5)


See also: IR 05000498/1993045

Text

g

g

- -

-

-

.%-

~

[pH #f k

NUCLEAR REGULATORY COMMISSION

Gg

UNITED STATES

.

[

@

j

R EGION IV

c.

8

G11 RYAN PLAZA DRIVE, SUITE 400

[

ARLINGTON, TEXAS 76011 8064

'

JAN 2 51994

  • ~

Dockets:

50-498

50-499

Licenses:

NPF-76

NPF-80

Houston Lighting & Power Company

ATTN:

William T. Cottle, Group

Vice President, Nuclear

P.O. Box 289

Wadsworth, Texas 77483

SUBJECT:

NRC INSPECTION REPORT 50-498/93-45; 50-499/93-45

,

This refers to the inspection conducted by Mr. D. P. Loveless, and the

inspectors identified in the attached report, of this office on November 7

through December 18, 1993.

The inspection included a review of activities

authorized for your South Texas Project, Units 1 and 2, facility. At the

conclusion of the inspection, the findings were discussed with you and those

members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, inspection of installed equipment and system

alignments, interviews with personnel, observations of activities in progress,

and specific reviews of items requiring closure prior to plant restart. The

purpose of the inspection was to determine whether. activities authorized by

the license were conducted safely'and in accordance with NRC requirements.

It was noted that an inadvertent loss of power to your 13.8KV Switchgear 2F

resulted from a failure to properly control work activities and confusing

labeling in the plant.

This violation is not being cited because the criteria

in Paragraph VII.B.2 of Appendix C to 10 CFR Part 2 of the NRC's " Rules of

Practice," were satisfied.

This violation was identified by the licensee and

prompt and effective actions were taken to correct the problem.

Additionally, during this inspection a review and independent verification of-

your system certification program was performed. . Based on the results of this

inspection, it was determined that the program, as implemented, should provide

for the proper certification that plant systems and components important to

safety are ready to support restart.

Therefore, Restart Issue 13, identified

in NRC Inspection Report 50-498/93-31; 50-499/93-31, is considered resolved.

Also, during this inspection a review of your efforts to reduce the

maintenance adequacy of your fire protection backlog on your fire protection'

!

systems was performed.

Based on the results of this inspection, it was

i

determined that management's efforts to reduce the backlog of system

i

t I

\\

9402010147 94-0125

i

PDR

ADOCK 05000498

/

1 i

G

PDR

l

A

.

.

_

w

?

.

Houston Lighting & Power Company

-2-

,

!

deficiencies were good, and that the status of the fire protection system

'

backlog should not affect plant restart. Therefore, Restart Issue 8,

,

identified in NRC Inspection Report 50-498/93-31; 50-499/93-31, was considered

'

resolved.

1

Good progress has been made in reducing the engineering backlogs.

This area

l

will be reviewed further during the next inspection period. Restart Issue 5,

"

"The Outstanding Design Modifications, Temporary Modifications, and other

Engineering Backlog Items, Including the Licensee's Review of These for Issues

Affecting Equipment Operability, Safe Plant Operation, and Operator Work-

Arounds," remains open.

,

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

f

this letter and its enclosures will be placed in the NRC Public Document Room,

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

!

Sincerely,

,

(J//

'

,

A. Bi

Beach, Director

Division of Reactor Projects

Enclosure:

.

Appendix - NRC Inspection Report

50-498/93-45; 50-499/93-45

i

CC:

Houston Lighting & Power Company

ATTN: James J. Sheppard, General Manager

i

Nuclear Licensing

P.O. Box 289

Wadsworth, Texas 774S3

,

City of Austin

Electric Utility Department

'

ATTh;

J. C. Lanier/M. B. Lee

721 Barton Springs Road

Austin, Texas 78704

.

}

City Public Service Board

ATTN:

K. J. Fiedler/M. T. Hardt

P.O. Box 1771

.

San Antonio, Texas 78296

1

.

.

.

. - .

-

_-

, '

.

JAN 2 51991

Houston Lighting & Power Company

-3-

Newman & Holtzinger, P. C.

ATTN: Jack R. Newman, Esq.

1615 L Street,.NW

Washington, D.C. - 20036

Central Power and Light Company

ATTN:

G. E. Vaughn/T. M. Puckett

P.O. Box 2121

Corpus Christi, Texas 78403

INP0

Records Center

700 Galleria Parkway

-

Atlanta, Georgia 30339-5957

Mr. Joseph M. Hendrie

50 Bellport Lane

,

Bellport, New York 11713

,

Bureau of Radiation Control

State of Texas

1100 West 49th Street

Austin, Texas 78756

Judge, Matagorda County

-

Matagorda County Courthouse

1700 Seventh Street

Bay City, Texas 77414

'

Licensing Representative

Houston Lighting & Power Company

Suite 610

.Three Metro Center

Bethesda, Maryland 20814

Houston Lighting & Power Company

ATTN:

Rufus S. Scott, Associate

General Counsel

i

'

P.O. Box 61867

Houston, Texas - 77208

Shaw, Pittman, Potts & Trowbridge

ATTN: Joseph R. Egan, Esq.

2300 N Street, N.W.

Washington, D.C.

20037

!

.=

t

.

Houston Lighting & Power Company

-4-

E-Mail report to D. Sullivan (DJS)

bcc to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector

Section Chief (DRP/A)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/A)

,

R. Bachmann, OGC, MS: 15-B-18

Section Chief (DRP/TSS)

DRS

A. B. Beach, D/DRP

O /-

RIV:SRddRP/A SRI:DRP/B[.

C:DRP/B /

RI:DRS/ES

RI:DRS/ES

h

LAYandelk

PAGoldberh

RBVickreyM//

DPloveless:ww

DNGraves

/w/94-[

//a//94

/ /14 /94

I /38/94

i /k/94

l

C:DRS/ES &

RI:DRS/PS[/

C:DRS/PS'J/N RI:dhIPS

C:DRSS/FIPA

'

TFWesterman

JEWhittemore

-bnstable.

DBSpitzberg

,BMurray. [

'

/ /M/94

I/>f/94

//dY/94

I/lY/94-

\\ /

4

C:DRP/Af

D:DRh/,a

WDJohnsbn

ABBq[cb

f /24/94

f/d/94

_

F

-

,

f

Houston Lighting & Power Company

-4-

E-Mail report to D. Sullivan (DJS)

bcc to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan

Resident Irspector

Section Chief (DRP/A)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DP,SS-FIPS

RIV File

Project Engineer (DRP/A)

R. Bachmann, DGC, MS: 15-B-18

Section Chief (DRP/TSS)

DRS

A.

B.

Beach, D/DRP

n /-

RIV:SR[: RP/A SRI:DRP/B[.

C:DRP/B /

RI:DRS/ES

RI:DRS/ES

h

LAYandelk

PAGoldberd

RBVickreyMf/

DPtoveless:w

DNGraves

I /JA/94

i /M /94

1/w/94[

//4//94

/ /.t1/94

N h lPS

C:DRSS/FIPA

C:DRS/ES &

RI:DRS/PS[]

C:DRS/PF)/h RI:

TFWesterman

JEWhittemore

bnstable

DBSpitzberg

,BMurray. [

'

//w/94

I/.29/94

//JY/94

( /LY/94

\\ /M4

C:DRP/Af

D:DR

/,

ABBqNck

WDJohnson

I /24/94

l/d/94