Forwards Insp Repts 50-352/93-24 & 50-353/93-24 on 930908-14.No Violations Noted
ML20059J653
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/04/1993
From: Hodges M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20059J656 List:
References
NUDOCS 9311150001
Download: ML20059J653 (3)


See also: IR 05000352/1993024

Text

e,

..

-

,

o;

n-

4,

t

NOV

4 1993

Docket Nos. 50-352

50-353

Mr. D. M. Smith

Senior Vice President-Nuclear

Philadelphia Electric Company

Nuclear Group Headquarters

Correspondence Control Desk

P.O. Box 195

Wayne, Pennsylvania 19087-0195

Dear Mr. Smith:

SUBJECT: COMBINED INSPECTION REPORT NOS. 50-352/93-24 AND 50-353/93-24

This letter refers to the NRC review in response to the September 7,1993, loss of one

offsite source event at the Limerick Generating Station, in Limerick, Pennsylvania. .The

review was conducted by Mr. A. L. Della Greca and T. A. Easlick of this office on

September 8 through 14,1993, at the Limerick site. At the conclusion of the inspection, on

September 14, 1993, Mr. Della Greca held an exit interview with Mr. R._ Boyce and other

memters of your staff. At that time, the scope and the results of the inspection were

discussed.

The inspection was directed toward areas important to public health and safety. The areas

examined are described in the NRC Region I Combined Inspection Report that is enclosed

with this letter. Within this areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and observations by the

inspector.

Our inspection concluded that the loss of one offsite electrical power source and the

subsequent reactor scram were the result of your inadequate control of maintenance activities-

not directly related to the operation of the plant. Poor communications between various -

working groups and between these groups and management rendered the existing controls-

ineffective. Another contributor to the event was your decision to place responsibilities on

_

the facilities group that were apparently beyond their capabilities and training. Your staff's

activities to identify the causes of the event and to correct the hardware deficiencies

associated with the event were adequate. Also, your immediate and interim corrective

actions put in place to address the above findings, while a full investigation of the event was

ongoing, were considered appropriate.

9311150001 931104

PDR

AD';cK 0500

2

G

+

fa'

1

'

NOV

4 1993

.

Philadelphia Electric Company

2

Following the inspection, on October 4,1993, a public management meeting was conducted

with Mr. D. R. Helwig and other members of your staff to discuss the event, its root causes,

and corrective actions thereof. A ' copy of the slides used by your staff at the meeting is

enclosed as Attachment A. Attachment B is a list of NRC and PECo personnel present at the

meeting.

At the management meeting, your staff concurred that the control of excavation activities by

the PECo facilities was less than adequate and identified the causes leading to the event and

the actions that were or will be taken to address the issues involved.

As a result of the inspection and of the management meeting, two unresolved items,

pertaining to your resolution of the above concerns and to the root cause of the breaker

failure, were identified. They will be reviewed during a future inspection of your licensed

program.

Your cooperation with us in this matter is appreciated.

Sincerely,

C or, -

R. :-j Cy:

i.Arvin Yi. HQas

Marvin W. Hodges, Director

Division of Reactor Safety

Enclosure: NRC Region I Combined Inspection Report Nos. 50-352/93-24 and 50-353/93-24 -

cc w/encls:

J. Doering, Chairman, Nuclear Review Board

D. R. Helwig, Vice President - Limerick Generating Station

G. A. Hunger, Jr., Manager - Licensing Section

J. L. Kantner, Regulatory Engineer - Limerick Generating Station

Secretary, Nuclear Committee of the Board

Public Document Room (PDR)

I_ocal Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO

NRC Resident Inspector, Limerick

Commonwealth of Pennsylvania

_)

I

..

NOV

4 .1993

'

.

Philadelphia Electric Company

3

bec w/ encl:

Region I Docket Room (with concurrences)

,

bec w/ encl (Via E-Mail):

V. McCree, OEDO

F. Rinaldi, NRR

M. Boyle, Acting PDI-2, NRR

t

,

+

,

t

-

RI:DRS

RI:DRS

RI:DRS

DellaGreca

Rul

Durr

h

A

10//f /93

Ig{/93

/$/2/93

i

OFFICIAL RECORD COPY

'

A: LIM 9324. INS

,

. -

-

- -

-