ML20059J552
| ML20059J552 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 12/31/1993 |
| From: | Miller D, Newburgh G NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| MP-94-17, NUDOCS 9402010069 | |
| Download: ML20059J552 (5) | |
Text
-
$90RTHEAST UTILITIES cenerei omce. seiden street. Beriin. connecticut 9
Us-I =$[c' EO J )o.1
.s, %on
.o,.I.s$'[,1YuYch.,,,
P.O. box 270 HARTFORD CONNECTICUT 06141-0270 k
k (203) 665-5000 DON ALD B. MILLER, Jr.
January 11, 1994 SENIOR VICE PRESIDEN7'- MILLSTONE -
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Facility Operating License No. DPR-21 Docket No. 50-245
Dear Sir:
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating report for Millstone Unit 1 is enclosed. One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY CO ANY
?
D. B. Miller, Jr.
Senior Vice President - Millstone Station
)
DBM/gsn cc:
T. T. Martin, Region I Administrator J. W. Anderson, NRC Project Manager, Millstone Unit No.1 P. D. Swetland, Senior Resident inspector, Millstone Unit Nos.1, 2 & 3 jf
}i 9402010069 931231
/
- t PDR ADOCK 05000245 R
.J
OPERATING DATA REPORT UNIT NAME Millstone Unit 1 DATE 940109 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 EXT 5730 OPERATING STATUS 1.
Docket Number 50-245 1
- 2. Reporting Period
_ December 1993 Notes:
3.
Utility Contact G. Newburgh
- 4. Licensed Thermal Power (MWt):
2011
- 5. Nameplate Rating (Gross MWe):
662 6.
Design Electrical Rating (Net MWe):
660 7.
Maximum Dependable Capacity (Gross MWe):
670.00 8.
Maximum Dependable Capacity (Net MWe):
641.00 9.
If Changes Occur in Capacity Ratings (items Number 4 Through 8) Since Last Report, Give Reasons:
N/A
- 10. Power Level To Which Restricted, if any (Net MWe):
N/A
- 11. Reasons For Restrictions,if Any:
N/A 1
This Month Yr.-To-Date Cumulative
- 12. Hours in Reporting Period 744.0 8760.0 202416.0 13 Number Of Hours Reactor Was Critical 744.0 8481.2 157950.6
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 3283.3
- 15. Hours Generator On-Line 744.0 8439.2 154215.0
- 16. Unit Reserve Shutdown Hours 0.0 0.0 93.7
- 17. Gross Thermal Energy Generated (MWH) 1431929.0 16678969.0 290545842.0
- 18. Gross Electrical Energy Generated (MWH) 472394.0 5515559.0 97926558.0
- 19. Net Electrical Energy Generated (MWH) 451287.0 5273223.0 93426134.0
- 20. Unit Service Factor 100.0 96.3 76.2
- 21. Unit Availability Factor 100.0 96.3 76.2
- 22. Unit Capacity Factor (Using MDC Net) 94.6 93.9 70.6
- 23. Unit Capacity Factor (Using DER Net) 91.9 91.2 69.9
- 24. Unit Forced Outage Rate 0.0 3.7 12.1
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage, January 1994,71 day duration.
- 26. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
N/A
- 27. Units in Test Status (Prior to Commercial Operation):
Forecast Achelved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NO. 50-245 UNIT Millstone Unit 1 DATE 940101 COMPLETED BY G. Newbu gh TELEPHONE (203) 447-1791 EXT 5730 MONTH: DECEMBER 1993 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 586 17 604 2
633 18 602 3
633 19 600 4
630 20 597 5
627 21 592 6
623 22 532 7
623 23 619 8
603 24 611 9
621 25 609 10 617 26 606 11 617 27 603 12 615 28 601 13 613 29 601 14 610 30 602 j
15 570 31 598 16 609 1
INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-245 UNIT NAME Millstone Unit 1 DATE 940109 s -
COMPLETED BY G. Newburah TELEPHONE (203)-447-1791 EXT 5730 REPORT MONTH: December 1993 2
No.
Date Type' Duration Reason Method of License System Component Cause & Corrective (Hours)
Shutting Event Code' Code' Action to Down Reactor Report #
Prevent Recurrence
-c N/A
' F: Forced Reason
' Method
S: Scheduled A - Equipment Failure (Explain) 1 - Manual
" Recommended Practices B - Mainteneance or Test 2 - Manual Scram for System identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
F - Administrative 6 - Other (Explain)
' IEEE Standard 803A-1983, G - Operational Error 11 plain)
" Recommended Practices H - Other (Explain) for Unique identification in Power Plants and Related Facilities - Component Function identifiers"
REFUELING INFORMATION REQUEST 1.
Name of the facility:
Millstone Unit 1 2.
Scheduled date for next refueling outage: Januarv 1994 3.
Scheduled date for restart following refueling: March 1994 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
None identified at this time.
5.
Scheduled date(s) for submitting licensing action and supporting information:
None at this time.
6.
Important licensing considerations associated withrefueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
188 GE10 Fuel Assemblies 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
In Core:
(a) 580 in Spent Fuel Pool: (b) 2116 Unconsolidated 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present Caoacity: Maximum 3229 fuel assembiv locations 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming present license capacity:
1997, soent fuel cool full, core offload capacity is reached.