ML20059J536
| ML20059J536 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 09/13/1990 |
| From: | Barrett R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20059J538 | List: |
| References | |
| NUDOCS 9009200052 | |
| Download: ML20059J536 (8) | |
Text
'
+g...
...., o pAge s'Cy%
UNITED STATES 8+
NUCLEAR REGULATORY COMMISSION -
2 J
wAsmwovow, p. c. roses
[
COMMONWEALTH EDISON COMPANY-AND IOWA-ILLIN0IS GAS AND ELECTRIC COMPANY DOCKET NO. 50-254 00AD CITIES NUCLEAR POWER STATIONc UNIT l' AMENDMENT TO FACILITY-OPERATING LICENSE Amendment No.'126 y
License No. DPR !
- 1. -
The Nuclear Regulatory Comission (the Comission) has found that:-
1 A.
The application'for amendment by Commonwealth Edison Company
'(the licensee). dated July 16, 1990,, complies-with the standards:
and requirements of-the Atomic. Energy Act-of 1954, as1 amended (the Act) and the Comission.'s rules and regulations. set ~ forth'.
in-10.CFR Chapter I;-
B.
The facility will o)erate in conformity'with.the. application the provisions of tie Act, and the rules.and_ regulations of the a
Commission; C.
There is reasonable assurance (1) that the activitiesgauthorized
'i by this amendment can' be conducted without endangering the. health and safety of the-public, and-(ii):that such activitiesLwi11Lbe-conducted in compliance with the Commission'.s regulations;'
D.
The issuance of this. amendment will not be inimical to the'
]
i
~
= common defense-and security or:to the chealth'and safety of-the-public; and-y E.
The issuance of this amendment is in accordance with 10 CFR'Part 51 of-the Comission's regulations.and-all: applicable: requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical /
Specifications as indicated in the attachment to this license amendment,.
.1 and paragraph 3.B. -of Facility. 0perating License No. DPR-29 is hereby amended to read as follows:
4 h
9009200052 900913 PDR ADOCK G5000254 p
PDC d
.,o I
2.,
B.
ThchnicalSpecifications U
The-Technical Specifications ' contained in ' Appendices A and B, as-revised through Amendment No.126 :,' areL hereby incorporated in,the-license. The licensee shall operate the facility-in accordance-with the Technical Specifications.1
~ 3 ~. - This license' amendment is effective as of the date of its issuance, 1
-q FOR'THE NUCLEAR. REGULATORY.-COMMISSION I
v -.
~
- k Richa d. Barre t;' Director-
~"
Project Directorate III-2 a
Division of Reactor Projects --III,
'IV, Y and Special Projects'..
Office of Nuclear Reactor Regulation-4
Attachment:
- Changes to the Technical 1
Specifications Date of Issuance: ' September.- 13. 1990
.I i
a l
a
+
I I
,w
' ATTACHMENT T0 LICENSE AMENDMENT NO.126'
~
FACILITY OPERATING LICENSE ^NO.-DPR-29 DOCKET NO. 50-254 Revise the Appendix A Technical Specifications by removing the page identified below and-insertingLthe attached page. The revised page'is identified by the captioned amendment number and contains' marginal lines indicating.the area of change.
- REMOVE, INSERT 3.12/4.12-11 3.12/4.12-11.
!)
= !
l i
4 s-
' I I
i I
1 i
?
g s
r.-
7
?
t l
- .. I.
QUAD-CITIES DPR-29 TABLE 3.12-1 FIRE DETECTION' INSTRUMENTS INSTRUMENT LOCATION MINIMUM' INSTRUMENTS:0PERABLE Heat:
Smoke Flow Linear Heat-Unit 1 HPCI area:
1 linear heat detector 1~
l.
Unit'l Diesel Generator Room:
2 heat-detectors I
- Unit l' Diesel Oil-Day Tark Area
I heat detector.
1 Unit 1/2' Diesel' Generator' Room a
2' heat' detectors
~1 Unit-1/2 Diesel Oil Day Tank Area:
1 heat detector 1
Unit 1 Cable Tunnel:
1 1 flow detector 1
Control Room, Computer Room Electrical Equipment Room HVAC:
10 smoke detectors 8
-i
-Cable Spreading Room Area:
18 smoke detectors 12 o
j 3.12/4.12-11 Amendment No. 126 U
[/'
~
..l, UNITED 8TATES NUCLEAR REQULATORY COMMISSION a
\\ *... + fl
.a wAsHmo1 row,c.c nosse -
!.~
COMM0'NWEALTH EDISON' COMPANY AND.
IOWA-ILLINOIS GAS AND ELECTRIC COMPANY i
DOCKET NO. 50-265i j
QUAD CITIES NUCLEAR POWER STATION. UNIT 2'
. i AMENDMENT'TO FACILITY. OPERATING-'_ICENSE:
Amendment No.'122.'
License No. DPR-30
- i I.
The Nuclear Regulatory Comission (ths Comission) has:found that:
i
-A.
The application for amendment by Comonwealth Edison Company ~
(the licensee) dated July 16, 1990, complies with'the standards' and requirements of.the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10-CFR Chapter I; B ~.
The facility will-operate:in conformity with;the application,.
the provisions of the Act, and:the rules and regulations of the Comission; C.
There is reasonable assurance:(1) that the activities authorized i
by this amendment can be. conducted without endangeringLthe henith and safety of the public, and (ii) that such activities.will be-l conducted in compliance with the Comission's regulations; s
p D.
The' issuance of this amendment will,not be inimical!to.the^
l common-defense and' security or to the health:and safety of ~ the i
L public;-and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 4
of the Comission's regulations and all applicable. requirements:
have been satisfied.
2.
Accordingly, the license is amended by changes to thE Technical' Specifications as: indicated in'the attachment to this license amendment, I;
-and paragraph.3.B. of Facility Operating License. No. DPR-30 is here>y, amended to read as follows:
1 o
H
~
s a.
4 m
- l
- y....
.e-e
.2
-B.
Technical Specifications
-l The Technical Specifications contained in Appendices A and B,>as revised through Amendment No.122, are hereby incorporated in the license. The licensee shall operate the facility-in accordance v'th the Technical. Specifications.
1 3.
This-license amendment is effective as of.the date of its issuance.-
FOR:THE NUCLEAR REGULATORY-COPHISSION.
i 4
I Richa Barrett,. Director-Project Directorate-III-2~-
i t
s Division of Reactor. Projects - III,
)
'IVL Y and Spechlt Projects Office of Nuclear Reactor Regulation j
Attachment:
1 Changes to,the Technical Specifications Date of Issuance: September 13, 1990 f
b',
h i
4
.,4 ;
I i
l
)
a
/
s 3
x
i l
'^
ATTACHMENT TO LICENSE AMENDMENT-NO. 122 r
FACILITY OPERATING LICENSE N0. DPR-30 10CKET NO. 50-265 I
. Revise the' Appendix A Technical Specifications by removing the page identified below and inserting 1the. attached page. The revised page is identified by.the captioned amendment number and contains marginal, lines indicating the area of: change.
a
-j 4
x REMOVE-INSERT 3.12/4.12-7 3.12/4.12-7 p
i.
q-a 5
i f
I i
l I;
r p.
l e.
. ~..
!4 OdAD-CITIES
-DPR-30 TABLE 3.12-1 FIRE DETECTION INSTRUMENTS INSTRUMENT l.OCATION MIN MUM INSTRUMENT 3 OPERABl.E M
M flow L near Heat.
Unit 2 HPCI area:
1-11near heat detector 1
l Unit 2 Dissel Generator Room: 2 heat detectors 1
Unit 2. Diesel Oil Day Tank Area:. I heat detector-1 Unit 1/2 Diesel Generator Room 2 heat detectors 1
' Unit 1/2 Diesel 011 Day Tank l
= Area:' I heat detector
- 1
-)
Unit 1 Cable Tunnel:
s-1 flow detector 1
Control Room, Computer Room Electrical Equipment Room HVAC:
10 smoke detectors 8'
Cable Spreading Room l
Area:
i.
18 smoke detectors 12 l
4 I
i i
i
'l 51 3.12/4.12 Amendment No.122
-,