ML20059J313
| ML20059J313 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 11/01/1993 |
| From: | Beckner W Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20059J316 | List: |
| References | |
| NUDOCS 9311120165 | |
| Download: ML20059J313 (4) | |
Text
.
e n cuq I
UTITED STATES t
Ofl.j
-[, k' g /
NUCLEAR REGULATORY COMMISSION
- g WASHINGTON, D.C. 20555-0001 gs
+...+
ENTERGY OPERATIONS. INC.
DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION. UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.87 License No. NPF-38 1.
The Nuclear Regulatory Comission (the Commission) has found that:
A.
The application for amendment by Entergy Operations, Inc. (the licensee) dated August 5, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth 1 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable req ~uirements have been satisfied.
i 9311120165 931101 1
PDR ADDCK 05000382 P
PDR iso
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-38 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Apoendix A, as revised' through Amendment No. 87, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION ffha D. j$$
William D. Beckner, Director Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: November 1, 1993 f-c l
4
1 e
a ATTACHMENT TO LICENSE AMENDMENT NO. 87 TO FACILITY OPEP,ATING LICENSE NO. NPF-38 DOCKET NO. 50-382 Replace the following page of the Appendix A Technical Specifications with the attached page. The revised page is identified by Amendment number and contains a vertical line indicating the area of change.
REMOVE PAG _E INSERT PAGE 3/4 1-20 3/4 1-20
. REACTIVITY CONTROL SYSTEMS SURVEILLANCE REOUTREMENTS 4.1.3.1.1 The position of each full-length and part-length CEA shall be determined to be within 7 inches (indicated position) of all other CEAs in its group at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except during time intervals when one CEAC is inoperable or when both CEACs are inoperable, then verify the individual CEA positions at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
4.1.3.1.2 Each full-length CEA not fully inserted and each part-length CEA which is inserted in the core below 145 inches shall be determined to be OPERABLE by movement of at least 5 inches in any one direction at least once per 92 days.
e i
t i
f p
f
[
t i
WATERFORD - UNIT 3 3/4 1-20 AMENDMENT NO. 87 i
f
. -