ML20059J233
ML20059J233 | |
Person / Time | |
---|---|
Issue date: | 08/20/1990 |
From: | Hagan T NRC OFFICE OF ADMINISTRATION (ADM) |
To: | Lofy R PARAMETER, INC. |
Shared Package | |
ML20059J215 | List: |
References | |
CON-FIN-L-1351, CON-NRC-03-89-029, CON-NRC-3-89-29 NUDOCS 9009190224 | |
Download: ML20059J233 (4) | |
Text
-
f[1oasc w?
f UNITED STATES -
g NUCLEAR REGULATORY COMMISSION L
- 8 WASHINGTON. D. C. 20655 I
AUG 2 01890 i
Parameter, Inc.
ATTN:
Richard A. Lofy 13380 Watertown Plank Road Elm Grove, Wisconsin 53122 j
Dear Mr. Lofy:
Subject:
Contract "o.-NRC-03-89-029, Task Order No. 6 Entitled " Vendor.
1 Inspection of Cooper-Bessemer Reciprocating -(FIN L-1351)-
You are hereby authorized to commente work on the subject task order-effective August 22, 1990 with an established ceiling of $6,972.25.
In accordance with~ Section G.5, Task Order Procedures, of the subject contract, this letter definitizes Task Order-No. 6.
This effort shall be i
performed in accordance with the enc %:ed !'atement of Work and Parameter r
Inc.'s' revised proposal dated Au;ost 20,-1990, incorporated herein by reference.
The period of performance for Task' Order.No. 6 'is August' 22, 1990 through' l
September 21, 1990.
The total cost ceiling is $6;?72.25. The amount of
$6,760.48 represents the total reimbursable costs, the amount of $11.77 represents the facilities capital cost of money, and 'the amount of $200.00 represents the fixed fee.
Accounting data for Task Order No. 6 is as.follows:
B&R No.:
020-5-14-03-0 FIN No.:
L-2351 l
Appropiation No.:
-31X0200.200 i
Obligated Amounti
$6,972.25 The following individual is considered by the Governmentito be essential to the successful performance of the work hereunder:
D. Beckman l
l The contractor agrees that. such personnel shall' not be removed from the effort under this task order without compliance with Contract Clause H.1 -
Key Personnel.
9009190224 900823 s
....= -
c:
j Richard A. Lofy NRC-03-89-029~.
t Task Order No. 6 l
i' Page 2 of 2 l.
l l
L The issuance of this task order does not amend-any terms or conditions'of l
the subject contract. -
Acceptance of Task Order No. 6 should be made by executing three copies of i
this document in the space provided and returning two copies to the l
Contract Administrator..You should retain the third copy for your L.
records..
Should you have any questions regarding this matter, please feel free to -
contact Brenda DuBose, Centract Management _ Assistant, on'(301) 492-7442.
t I
l Sincerely, 1
Timothy Hagan, Contracting Officer Contract Administration Branch No. 1 i
Division of Contracts and l
Property Management Office of Administration l'
Enclosure:
j.
As stated ACCEP T
.r l
j
.u- -
NAME'
(,/
TITLE 23 [0 DATE
-(
s
.h e a.
e v
w
(
(
~
STATEMENT OF WORK TOR-TASK ORDER NO. 6 l
UNDERCONTRACTNO.NRC-03-89-029(FINL-1351)
Vendor Inspection of Cooper-Bessemer Reciprocating TITLE:
Inspection Report Number:
99900317/90-01 NRC Team Leader:
Walter P. Haass 301-492-3219 BACKGROUND F
1'~
The Vendor Inspection Branch (VIB) of NRR is planning an' inspection of-
't L
Cooper-Bessemer. The principal objective of the inspection will,be to review the vendor's program for the classification and dedication of spare and-i l
replacement parts for use by nuclear utilities in safety-related applications' and to ensure that the program is being implemented by the vendor. The vendor's Part 21 program will also be reviewed.
OBJECTIVE e
The objective of thi; Task Order is to obtain technical expertise from Parameter, Inc. in nuclear power plant emergency diesel engine technology to assist an NRC inspection team in performing the referenced inspection.,
WORK REQUIREMENTS The contractor shall provide the services of one specialist ~in emergency diesel engine technology and vendor inspections-to assist an NRC inspection -
team by performing the following tasks.
Tasks Scheduled Completion 1.
Participate in an NRC on-site inspection.
August 30, 1990 Typical inspection activities will include:
t (a) extrining and evaluating the venior's procedures for classifying-die rei engine parts and. related records; (b). valuating the vendor's program for dedication of commercial-grade ci rarts fo'r use in safety-related applications by nuclear utilities;
.o (c) reviewing the vendor's;QA program for the control of procurement and manufacturing activities;
~
?
)
e j_
'iI l
'i. l
ax.
x, e
(
(
k 3
3 MEETINGS At40 TRAVEL One one-person, five-day trip to the Cooper-Bessemer facility located in Grove City, PA (Task 1).
LEVEL OF EFFORT A!!D PERIOD Of pERFORMAf4CE The level of effort is estimated at 9 professional staff days apportioned among the tasks as follows:
Level of Effort (Days)
Task l
1 5
4 2
TOTAL 9 days The period of performance is August 22, 1990 to September 21, 1990. The inspection is scheduled for August 27 to August 30, 1990.
liRC FURillSHED 11ATERIALS Documents required to prepare for the inspection will be provided by the NRC Team Leader by the start of the period of performance. Documents and othr:r materials required to perform the ir,spection will be prosided at the vendar's
=
f aci li ty.