Forwards SE Accepting Rev 3 to Topical Rept OPPD-NA-8302-P, OPPD Nuclear Analysis,Reload Core Analysis Methodology, Neutronics Design Methods & Verification
ML20059H843
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/02/1993
From: Steven Bloom
Office of Nuclear Reactor Regulation
To: Tira Patterson
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20059H847 List:
References
TAC-M85844, NUDOCS 9311100242
Download: ML20059H843 (4)


Text

__

November 2, 1993 Docket No. 50-285 P

t Mr. Terry. L. Patterson Division Manager - Nuclear Operations Omaha Public Pcwer District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort Calh9un, Nebraska 68023-0399 l

Dear Mr. Patterson:

SUBJECT:

SAFETY EVALUATION FOR OPPD-NA-8302-P, REVISION 03, "0 PPD NUCLEAR ANALYSIS, RELOAD CORE ANALYSIS METHODGLOGY, NEUTRONICS DESIGN METHODS AND VERIFICATION" (TAC NO. M85844)

By letter dated February 5, 1993, as supplemented by letter dated June 25, 1993, you submitted proposed changes to the Fort Calhoun Neutronics Design Methods and Verification (0 PPD-NA-8302, Rev 03). The NRC staff has reviewed the proposed changes and ' finds them acceptable.

A copy of our Safety Evaluation is enclosed.

Sincerely, ORIGINAL SIGNED BY:

Steven D. Bloom, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V-Office of Nuclear Reactor Regulation i

Enclosure.

Safety Evaluation cc w/encksure:

See next page DISTRIBUTION:

Docket File NRC & Local PDRs PD4-1 Reading S. Bloom E. Adensam W. Beckner i

P. Noonan ACRS(10) (P-315)

OGC'(15818)

A. B. Beach, RIV J. Roe E. Kendrick 0FC LA:PD44M[ Plhhl D:PD4-ItebD NAME PNoon'anY Shloom:pk WBeckner DATE tl /Al /93 h/?_./93 S

N/ /93 COPY YEklid)

YES/NO VES/NO gg Qh OF"CIAL RECORD COPY Document Name: FC85844.SE r-

,., e,

. ~

w Ie b*

0400%

g) '

I' 9311100242 931102 PDR ADDCK 05000285 P

PDR

I November 2, 1993 Docket No. 50-285 Mr. Terry. L. Patterson Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 399 Hw). 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399

Dear Mr. Patterson:

SUBJECT:

SAFETY EVALUATION FOR OPPD-NA-8302-P, REVISION 03, "0 PPD NUCLEAR ANALYSIS, RELOAD CORE ANALYSIS METHODOLOGY, NEUTRONICS DESIGN METHODS AND YERIFICATION" (TAC NO. MS5844)

By letter dated February 5, 1993, as supplemented by letter dated June 25, 1993, you submitted proposed changes to the Fort Calhoun Neutronics Design Methods and Verification (OPPD-NA-8302, Rev 03). The NRC staff has reviewed the proposed changes and finds them acceptable.

A copy of our Safety Evaluation is enclosed.

Sincerely, ORIGINAL SIGNED BY:

Steven D. Bloom, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page DISTRIBUTION:

Docket File NRC & Local PDRs PD4-1 Reading S. Bloom E. Adensam W. Beckner P. Noonan ACRS(10) (P-315)

OGC (15B18)

A. B. Beach, RIV J. Roe E. Kendrick 0FC LA:PD4SM Phl D:PD4-lubD n i NAME PNoon,an/ f 781com:pk WBeckner N/ /93 1

DATE

// /4 /93 l( /7_/93 COPY YE M YES/NO YES/NO 0FFICIAL RECORD COPY Document Name:

FC85844.SE

~,.

l

[

UNITED STATES y.kZ1.l)}~

NUCLEAR REGULATORY COMMISSION.

1 t

' WASHINGTON. D.C. 200664001 e'

h

%?

  • o 3

November 2., 1993

-Docket No. 50-285 l:

Mr. Terry L. Patterson I

Division Manager - Nuclear Operations-l l

Omaha Public Power District.

i Fort Calhoun Station FC-2-4 Adm.

Post Office Box 399 Hwy. 75 - North of Fort Calhoun 1

Fort Calhoun, Nebraska 68023-0399

Dear Mr. Patterson:

SUBJECT:

SAFETY EVALUATION FOR OPPD-NA-8302-P, REVISION 03, "0 PPD NUCLEAR l

ANALYSIS, RELOAD CORE ANALYSIS METHODOLOGY, NEUTRONICS DESIGN i

METHODS AND VERIFICATION" (TAC NO. M85844) t i

By letter dated February 5,1993, as supplemented by letter dated June. 25, i

1993, you submitted ~ proposed changes to che Fort Calhoun Neutronics Design l

Methods and Verification (OPPD-NA-8302, Rev 03). The_ NRC staff has revi:!wea the proposed changes and finds-them acceptable.

A copy of our Safety Evaluation is enclosed.

l Sincerely, O

J g -i Steven D. Bloom, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V l

Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation j

l cc w/ enclosure:

l See next page i

i i

i l

1 I

t i

Mr. Terry L. Patterson I

Omaha Public Power District Fort Calhoun Station, Unit 1 cC; Mr. Michael F. McBride, Esq.

LeBoeuf, Lamb, Leiby & MacRae l

1875 Connecticut Avenue, NW Washington, D.C.

20009-5728 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Raymond P. Mullikin, Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 s

Rockville, MD 20852 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health j

Nebraska Department of Health 301 Centennial Hall, South Post Office Box 95007 i

Lincoln, Nebraska 68509 Mr. James W. Chase, Manager j

Fort Calhoun Station Post Office Box 399 Fort Calhoun, Nebraska 68023 l

'l 1