ML20059H150

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/93-44 & 50-446/93-44 on 931114-1225.Violations Noted.Failure of Work Group to Follow Requirement Specified in Station Adminstrative Procedure
ML20059H150
Person / Time
Site: Comanche Peak  
Issue date: 01/20/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20059H154 List:
References
NUDOCS 9401260286
Download: ML20059H150 (15)


See also: IR 05000445/1993044

Text

g

'

^

,

.

OR Rf Cp

UNITED ST ATES

~

f

h

NUCLE AR REGULATORY COMMISSION

j ,'i

j

(

REclON IV

  • hJ

f

611 RYAN PLAZA DRIVE, SUITE 400

g

s

&

AR LINGTON, T EX AS 76011 8064

  • * " '

'

JAt4 2 01994

Dockets:

50-445

50-446

Licenses:

NPF-87

-

NPF-89

i

,

TV Electric

,

ATIN:

W. J. Cahill, Jr., Group Vice President

Nuclear Engineering and Operations

>

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

i

SUBJECT: NRC INSPECTION REPORT 50-445/93-44; 50-446/93-44

>

This refers to the inspection conducted by Messrs. D. N. Graves,-G. E. Werner,

and K. M. Kennedy of this office on November 14 through December 25, 1993.

The inspection included a review of activities authorized for your Comanche

'

Peak Steam Electric Station, Units 1 and 2, facility. At the conclusion of

the inspection, the findings were discussed with those members.of your staff

identified in the enclosed report.

t

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress. The purpose of the inspection was to determine

whether activities authorized by the license were conducted safely and in

i

accordance with NRC requirements. The results of this inspection are

.

documented on pages 1 and 2 in the enclosed report.

!

Based on the results of this inspection, a licensed activity appeared to be in

violation of NRC requirements. The violation involved the failure of a work

group to follow the requirements specified in a Station Administrative

Procedure concerning the revision of a work order and is not being cited

i

because the criteria in Paragraph VII.B.1 of Appendix C to 10 CFR Part 2 of

the NRC's " Rules of Practice" were satisfied.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

I

!

i

I

o\\

,

,

s

9401260286 940120

I V

y\\ (-

PDR

ADOCK 05000445

G

PDR

,

1

- - - -

- . .

. - - -

t

9

.

.

TU Electric

-2-

!

'

Should you have any questions concerning this inspection, we will be pleased

I

to discuss them with you.

Sincerely,

[

l]

1

.

'

I

_l ba

IBillBeach, Director

'

Division of Reactor Projects

j

Enclosure:

- Appendix A - NRC Inspection Report

50-445/93-44; 50-446/93-44 w/ attachment

cc w/ enclosure:

TU Electric

i

ATTN:

Roger D. Walker, Manager of

Regulatory Affairs for Nuclear

-j

Engineering Organization

,

Skyway Tower-

,

400 North Olive Street, L.B. 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

l

Dallas, Texas 75224

GDS Associates, Inc.

Suite 720

1850 Parkway Place

l

Marietta, Georgia 30067-8237

1

i

TU Electric

l

Bethesda Licensing

f

3 Metro Center, Suite 610

l

'

Bethesda, Maryland 20814

Jorden, Schulte, and Burchette

ATIN: William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

1025 Thomas Jefferson St., N.W.

Washington, D.C.

20007

.

.

_.

__

_

.

,

,-

!

i

!

i

'

TV Electric

-3-

-,

Newman & Holtzinger, P.C.

ATTN: Jack R. Newman, Esq.

i

1615 L. Street, N.W.

Suite 1000

,

Washington, D.C.

20036

Texas Department of Licensing & Regulation

ATTN:

G. R. Bynog, Program Manager /

.

!

Chief Inspector

'

Boiler Division

P.O. Box 12157, Capitol Station

l

Austin, Texas 78711

-!

lionorable Dale McPherson

,

i

County Judge

P.O. Box 851

i

,

Glen Rose, Texas 76043

,

'

't

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

1

!

'

!

i

!

!

'

,

t

l

i

'

i

i

<

!

!

!

!

s

,

.

'[',,

.'

j

'

,

-

!

,

TU Electric

-4-

4

0 to3M

l

,

E-mail to D. Sullivan (DJS)

i

ibcc to DMB (IE01)bys

bcc distrib. by RIV:

,

J. L. Milhoan

Resident Inspector (2)

,

Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/B)

Section Chief (DRP/TSS)

A. B. Beach (DRP)

,

.

t

!

!

,

i

!

,

'

RIV: SRI:DRP/B

PE:DR3/B'- g

C:DRP/B

/

D:DC?

LAYandellbty

ABB(hh

!

DNGraves/

TR

a

01/19/94

01//6794

01/6/94

/

01/10/94

1

!

'

E50' U1

J

9

4

TU Electric-

-4-

JM12 01993

E-mail to D.~Sullivan (DJS)

bec to DMB (IE01)

bec distrib. by RIV:

J. L. Milhoan

Resident Inspector (2)

Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/B)

Section Chief (DRP/TSS)

A. B. Beach (DRP)

RIV: SRI:DRP/B

PE:DR W 3

C:DRP/B- /

D:DQ

LAYandellbe

ABBhh

DNGravesf)

TR

a

01/19/94

01//8/94

01/6/94 [

01/10/94