ML20059G875
| ML20059G875 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 11/02/1993 |
| From: | Fox J GENERAL ELECTRIC CO. |
| To: | Poslusny C Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 9311090157 | |
| Download: ML20059G875 (2) | |
Text
-
GENuclect Energy l
s Gere!Electnt Com;>ay 175 Curtner Avenue. San Jose, CA 95125 i
i i
November 2,1993 Docket No.52-001
'I k
i i
i Chet Poslusny, Senior Projeet Manager l
Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation
Subject:
Submittal Supporting Accelerated ABWR Schedule - Technical l
Specification Format j
i
Dear Chet:
Enclosed is a sample page of a technical specification format that reflects our need for GE document contro and NRC staff requirement for maintaining the STS format in WorkPerfect. We have added a GE document number on the header and replaced i
the date with the SSAR Amendment number OL the footer. The technical i
Specifications will be included similar to that provided for SBWR. Please provide markup comments, if any, as soon as possible.
Please provide a copy of this transmittal to Mark Reinhart.
i Sincerely, l
i J k Fox Advanced Reactor Programs l
cc:
Alan Beard GE)
Norman Fletcher DOE)
Cal Tang GE) a kV Ji9.L291 I
$[4fI 9311090157 931102 PDR ADOCK 05200001 A
PDR l
i 22astoo nee. 3 APLHGR 3.2.1 3.2 P"0WER DISTRIBUTION LIMITS 3.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)
LC0 3.2.1 All APLHGRs shall be less than or equal to the limits specified in the COLR.
i APPLICABILITY:
THERMAL POWER 2 25% RTP.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Any APLHGR not within A.1 Restore APLHGR(s) to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> limits.
within limits.
B.
Required Action and B.1 Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion to < 25% RTP.
Time not met.
l SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
)
SR 3.2.1.1 Verify all APLHGRs are less than or equa!
Once within to the limits specified in the COLR.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 2 25% RTP AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter I
ABWR TS 3.2-1 Amen &ent 33
!