ML20059G522
| ML20059G522 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/06/1994 |
| From: | Link B WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20059G525 | List: |
| References | |
| CON-NRC-94-001, CON-NRC-94-1 VPNPD-94-004, VPNPD-94-4, NUDOCS 9401240207 | |
| Download: ML20059G522 (1) | |
Text
.
~
q l Wisconsin
' Electnc i
' POWER COMPANY 231 W Mictugon. Po. Ibn 2046. Mitwoukee. WI 53201-2046
[414]221 2345
(
h
~!
VPNPD-94-004 NRC-94-001 January 6, 1993 i
Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION j
Mail Station P1-137' Washington, DC 20555 1
Gentlemen:
DOCKETS 50-266 AND 50-301-EMERGENCY PREPAREDNESS EXERCISE SCENARIO
[
POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 LI i
In accordance with Mr. A. Bert Davis' letter of March 16,.1987,
{
a complete copy of the Point Beach Nuclear Plant Emergency' Plan-Exercise Scenario is provided for your records.
The exercise was conducted on December 8, 1993.
Please address any questions regarding this~ matter directly to j
our Emergency Preparedness Coordinator, Richard Chojnacki at (414)755-6491.
Sincerely, l
/
+
,/ - y m.
Bob Link-Vice President Nuclear Power l
GJM/jg N
Enclosure E
cc:
NRC Regional Administrator, Region III (w/o/e)
,f NRC Resident Inspector (w/o/e)
-l l.
I40002 Sb j
- ransa annae[
4 V;.
A sakWayofHianswDwarOxiwatkw 1
g 3
'