Responds to to Administrator of Region I Ofc Re Review of License Application from Donegal Const Corp. Application Confirmed as Complete & Accurate & License Issued on 900808
ML20059G520
Person / Time
Issue date: 08/17/1990
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Kolter J
HOUSE OF REP.
Shared Package
ML20059G523 List:
References
CCS, NUDOCS 9009130011
Download: ML20059G520 (4)


Text

,;.

W.

~"

,a W !

ff;

'__g.

[.fjf

    • tovy.
d. L i k

UNITED STATES <

.y v% :...- 7, NUCLEAR REGULATORY COMMISSION L i

.n

j

' WASHINGTON, D. C. 20555

    • "*/

1 a

l,..

g August 17,(1990 s

'The Honorable Joe Kolter:

United States Houst of Representatives-Washington, D. C.

20515-1

Dear. Congre'ssman 'Kolter:

a m-

+

-I am responding to-your ' letter ~ datediJuly 31, 1990,: to the Administrata of the' NRC's Region,I office. JYou requestedLthat the..NRC expedite review.ot a. license application from the Donegal Construction Corporation.(Donegal):of-Greensburg,

~ Pennsylvania. ThelRegion_ I staff reviewed Donegal's application 1 dated July 16,.

1990, confirmed'that the submitta1Lwas complete,and accurate,-and issued the license ~on' August 8, 1990.

~

W We also reviewed our records relativeito Donegal's previous license applications to :the NRC.. A synopsis 'of our review. is' attached; for your, information. We

-1 hope this is responsive to your concerns.-

Sincerely, i

.\\

l__ [

s i. Tay r

xecutive'. Director

'for.0perations Attactment.

Synopsis;with Enclosures l

p I:

L NLLTEXT ASCII SCAM 9009130011 900817 PDR CRG NE ED PDC

/)('

,a-e-w.-

3

,A w d,,

P mg; -

~

ag

  • y)

3 e

August 1,7,c1990 u

3

The llanorable Joe Kolter?

. Uni +.ed' States Hodse of-Representatives; 4

--Washington, D. C.-

-20515

' L

DearLCongressman Kolter:

I am resporiding to your letter, dated July 31, 1990, to the; Administrator df ihe #

9!

-NRC's. Region I; office.:.You requested that the.NRC expediteLreview.of'allicense i

> application!from the Donegal-Construction' Corporation (Donegal) of Greensburg -.

Pennsylvania. :The Region I staff, reviewed Donegal's application dated July 16,.

1990,-_ confirmed that the submittal was: complete and accurate,'and issued the license on-August 8, 1990.

e c v 1

'We also reviewed our. records relative to Donegal's previous license applications.

4 to the NRC. A synopsis of'our review is attached fortyour'-information.'_lWe hope;thit,.is responsive to your concerns.:

]

2 Since,ely-1hi@31 M2ned By:

4 4

james M.TayW James M. Taylor Executive Director for Operations,

Attachment:

nSynopsis with Enclosures Distribution:

EDO Control'0005721 ED0 r/f R. Bernero, NMSS T. Martin, RA-RI i

H. Thompson, EDO D. Rathbun GPA/CA M. Knapp,-DRSS-RI

.L. Bettenhausen, DRSS-RI.

J. - >!hita, DRSS-RI l

R. Cunningham,.NMSS

'W. Parler, OGC

  • See previous concurrence R. Scroggins, OC

=0. Dandois, OC/LFDCB

G. Jackson, OC/LFDCB f

l DRSS DRSS DRSS DRSS DRA RA

. WHITE BETTENHAUSEN COOPER KNAPP KANE MARTIN *-

1

/s/

/s/

/s/

/s/

/s/

/s/

l 8/06/p 8/10/90 8/10/90-8/10/90 8/13/90 8/13/90 T

A NI 8/g/90 7y.

9

d' 1

,7

..r 4-

- q ATTACHMENT i

. SYNOPSIS ~OF'NEW LICENSE APPLICATION REVIEW

- l

.FOR SUBMITTALS FROM THE; 1

DONEGAL CONSTRUCTION CORPORATION'(DONEGAL)-

- 1 Oh August 15, 1988, NRC Region:I received'a newilicense" application from.,

I Donegal,- signed by their;TechnicalLSupervisor, Mr. ? Richard Hudock, and dated.

October 5, 1987. When the app _lication.was reviewed,?it~was' discovered that the 1

license fee of ~ $230'.00 was not: enclosed-with the su'a11ttal.

Subsequently,. the :

NRC License Fee Management Branch informed Donegal!of the oversight in a letter-dated September 6, 1988 (Enclosure 1).: When Donegal did_'not' respond to the letter, a.NRC License -Fee Management ^ Branch staff member; contacted the Donegal office by telephone ~on January 23 and 26,1989. A Donegal representative responded that, since Mr. Hudock was no' longer with the corporation, the owners had decided-to withdraw the application. Accordingly, the'NRC staff; voided the.

action on February 6,'1989.

On July 18, 1989, NRC Region I received another new -license application from.

Donegal, signed-by their Technical Supervisor, Mr.~ Donald Pfeifer,.and dated July 14, 1989.s.Mr.'Pteifer indicated that the $230.00 fee that was. submitted 1

with.the company's previous application dated October 5, 1987, should be-applied to this submittal.

In a letter dated August 3, 1989, the NRC License Fee Management' Branch reminded Donegal of the previous correspondence (September 6,1988) on.this subject, reiterated that the NRC had not received any application' fee with thec previous submittal, and stated that a $230.00 application. fee was required prior to issuance of the license. Further, Donegal was 1.nformed that this, latest (July 14 1989) application would be voided if they: did not respcod within30 days (Enclosure 2).

1 NRC did not receive a response from Donegal. Consequently,- in a memorandum L

dated December 14, 1989, NRC's Division of Accounting'and Finance-informed NRC Region-I that, since Donegal had not responded, the applicant's July 14,-1989 dpplintion was abandoned for non-payment of the' required fee (Enclosure 3)..

t On January 26,1990, the NRC Region I staff attempted to contact Mr. -Pfeiter in an effort to resolve this matter. While Mr. Pfeifer was unavailable, hh representative indicated that Donegal did not want the application abandoned and that Mr. Pfeifer would contact the NRC on this matter.

However,~neither 1

Mr. Pfeiter nor any other representative of Donegal. contacted the NRC.

Consequently, NRC Region I let stand the decision to abandon the application.

On July 19, 1990, NRC Region I received another license applicetion from

~

Donegal, signed and dated by Mr. Pfeifer on July 16, 1990.

Review of this application was initiated after NRC's Division of Accounting and' Finance confirmed that the required application fee was submitted. The license was l

1ssued on August 8, 1990.

i

Enclosures:

As Stated l

l' b

i 5

e e

,e

,v

,,w

--n, se,-,

o a

+

w

k, ~.

4.' t'

,1'

~

'j

3. ? ?,

[

i p

CONGRESSIONAL CORRESPONDENCE SYSTEM DOCUMENT PREPARATION CHECKLIST.

This checklist is to be submitted with.saob1 document (or group of

.Qs/As)isent for entering:into the CCS.

1.

BRIEF-- DESCRIPTION OF DOCUMENT (S)

/dC 3.'

TYPE: OF DOCUMENT Correspondence Eearings=(Qs/As)-

d ' Sensitive 3.

DOCUMENT CONTROL Sensitive--(NRC Only)

Non-i 4.

CONGRESSIONAL COMMIM'EE mad SUBCOMMITTEES (if applicable).

. Congressional. Committee Subcommittee 5.

SUBJECT CODES (a)

(b) l-(c) 6.

SOURCE-0F DOCUMENTS (a) 5520 (document name-M v' an..

(c)

Attachments (b)

Sc (d)

Rekey (e)

Other 7.

SYCTEM LOG, ATES (a) 7h Date OCA sent document toLCCS' (M

Date CCS receives docun'ent' (c)

Date returned to OCA for additional information (d)

Data resuhaitted by OCA to CCS (e)

Date entered into CCS by.

(f)

Date OCA notified that document it in CCS-8.

COMMENTS l

l

.=

. =. -..

- -... -. =.

.