om p
, i(*"* ts.}0 UNITED STATES
+
8 3
o-NUCLEAR REGULATORY COMMISSION,
i
{ g "e(..
waswiwoTON. D. C. 20666 f
\\'.% * /
september 5, 1990 l
MEMORANDUtt FOR: William T. Russell, Associate Director for Inspection and Technical Assessment FROM:
Ashok Thadani, Director Division of Systems Technology L
SUBJECT:
BWROG MANAGEMENT MEETING REPORT
\\
The August 2, 1990, Management Meeting between tha BWR Owners' Group and NRR was held as scheduled. Due to the effectiveness of these meetings, their scheduling has been increased from two to three meetings per year.
et the request of BWROG. Enclosure 1 is the BWROG. handout provided at the meeting, which includes the meeting agenda as well as background i
information on selected agenda topics. is a listing of
[
meeting attendees.
These meetings are held to discuss the status of ongoing issues of l
interest to the Owners' Group and staff, as well as identification of new iscues which will be the subject of Owners' Group activities.
The Owners' Group expressed their satisfaction on the effectiveness of f
these meetings in monitoring progress on the programs Ond enhancing interactions with the staff, r
Some topic specific information of interest which was discussed at the meeting incleded:
I BWR Stability /ATWS BWROG is completing their assess-ment, focus will likely be pro-cedure based.
Expect draft report to staff by December, with final l
in January 1991.
MSIV Leakage Control System BWROG inqtiired on schedule, staff committed to provide.
Current in-formation is that staff hopes to-have SER completed by end of March i
1991.
However, a one to two nonth.
i delay is possible due to needed changes in OG radiological. assess-ment computer code.
[) 9 +
l.
9009120332 900905 d
i PDR TOPRP EMVGENE C
h f03 PDC no
William T. Russell Septenber 5,1990 HOV Testing The staff expressed the importance of this istJe, and noted t1at valve mispositioning was also still an issue along with closure capability against pressure differential.
Staff noted that inspections will be delayed to allow industry review of -
Supplement 1 to GL 89-10. Staff also committed to participate in a meeting in near future to discuss position on licensing basis and operating ex-perience on mispositioning. This meeting is scheduled for Sept. 7.
ATWS Diversity Owners' Group inquired on status of I
their. appeal. The staff expects it to be signed out by ED0 shortly.
RG 1.97 Neutron Monitoring The OG indicated that they will appeal staff's position requiring neutron flux monitoring. The appeal is now under staff review.
MSL Red Motiitor OG inquired on schedule.
Expected staff completion date is end of October.
Containrent Testing Staff will be responding shortly to OG coments directed to their ex-l pectation of proposed Appendix J leak testing rule change.
Rule and RG changes currently underway by
- staff, i
i Channel Box Bow The staff expressed their concern regarding reuse of channel boxes, and noted that a formal position would be forthcoming shortly. Operational issues regarding the six plants cur-i rently reusing boxes.is also undar i
staff consideration and will be i
decided shortly.. - Staff-comented that at present no consistent method for determining CPR penalty was being utilized.
4 1
. William T. Russell Sept. amber 5,1990 EPGs Staff expressed concern over incon-sistencies between plant licensin basisandEPGs(NCADoneexample)g The staff will anticipate follow-up by OG to resolve these inconsistencies.
For more information on these topics, please contact the responsible Branch Chief or sqyself.
ORIGINfA SIGNED BY A.C.THADANI Ashok Thadani, Director Division of Systems Technology
Enclosures:
As stated Distribution Central file DST Rdg MRubin Rubin CHRON AThadani BWROG PDR Meeting participants i
TA: DST D: DST MRubin ml NTha ani 8/
/90
/
/90 t
i i
a j
3 i
1 newsunc 1 NRC/BWROG MANAGEMENT HEETING E
i AUGUST 2, 1990 ROCKVILLE, MARYLAND l
J OG8/080290 3
NRC/BWROG MANAGEMENT MEETING
. AUGUST 2, 1990 PROPOSED AGENDA IIME SUBJECT 1:30 BWR STABILITY 2:00 MSIV LEAKAGE 2:15 MOV TESTING 2:30 EPG ISSUES 2:40 R.G. 1.97/ NEUTRON MONITORING SYSTEM 2:50 VALVE EROSION 3:00 CONTAINMENT TESTING 3:10 INTERFACING SYSTEM LOCA 3:15 LER/JCO-ACTIVITY 3:20 REVIEW SCHEDULES 3:25 DISCUSSION i
i OG8/080290-
l l
STABILITY LONG-TERM SOLUTIONS 1
o EXTENSIVE BWROG DEVELOPMENT PROGRAM IS IN PLACE - RESOURCES ARE FOCUSED ON THE REAL PROBLEM AND RESOLUTION IS NEARLY COMPLETE INTERIM CORRECTIVE ACTIONS ARE IN PLACE LONG-TERM NARDWARE SOLUTIONS NAVE BEEN
. IDENTIFIED GENERIC DEVELOPMENT / LICENSING WORK SHOULD BE COMPLETED.TNIS YEAR FINAL DESIGN AND IMPLEMENTATION PNASE TO I
BEGIN EARLY 1991 o
LICENSING BASIS. REPORT SUBMITTED TO NRC ON 2/2/90 SOLUTION DESCRIPTIONS AND PROPOSED LICENSING BASIS POSITIVE NRC FEEDBACK ON ALL SOLUTION a
OPTIONS o
BWROG STABILITY COMMITTEE WORKING CLOSELY WITN THE NRC STAFF TO RESOLVE TNIS ISSUE o
GOOD EXAMPLE 0F AN INDUSTRY-LED, COOPERATIVE EFFORT TO RESOLVE A COMPLEX ISSUE i
STABILITY ATWS/ STABILITY o
LICENSING ISSUE ON ATWS/ STABILITY RAISED BY NRC NIGN VISIBILITY ISSUE OCRE PETITION NEEDS TO BE ADDRESSED NATIONAL LABORATORY ANALYSIS NOT RESOLVING o
BWROG BELIEVES THAT TNE LOW PROBABILITY OF ATWS/ STABILITY WOULD PRECLUDE CONSIDERATION ON TNE BASIS OF IPE GUIDELINES DIFFICULT TO QUANTIFY ATWS RULE /0CRE PETITION COMPLICATE ISSUE o
TO EXPEDITE RESOLUTION OF THIS LICENSING ISSUE THE BWROG PLANS TO:
PROCEED WITH EVALUATION PROGRAM AS REVIEWED WITN NRC REVIEW AND, AS APPROPRIATE, UPDATE EPG.
ACTIONS PERFORM QUALITATIVE ASSESSMENTS AND CONFIRMATORY ANALYSIS TO ASSURE THE q
ACTIONS ARE APPROPRIATE i
l I
STABILITY I
ATWS/ STABILITY (CONT'D) eI l
i o
BWROG EXECUTIVES' CONCERNS BEYOND DESIGN BASIS EVENT SYMPT 0M BASED EPGs PROVIDE PROTECTION
'l l
l l
FOR THIS AS WELL AS SPECTRUM OF OTHER 7
l BEYOND DESIGN BASIS EVENTS COSTS FOR STUDIES MUST LIMIT WORK TO WITHIN PROPOSED PROGRAM AND RESOURCES 1
THIS PROGRAM CANNOT BE ALLOWED TO TURN INTO o
I AND ENDLESS "WHAT IF" EXERCISE POTENTIAL EXISTS FOR PROTRACTED ANALYSIS i
WITHOUT RESOLVING ISSUE i
BWROG PROGRAM PROVIDES THE BASIS FOR MEANINGFUL RESOLUTION THROUGH OPERATOR ACTION EXTENDED ANALYSIS OF THIS ISSUE WILL D0 LITTLE TO IMPROVE SAFETY o
GOOD EXAMPLE OF A LICENSING-ISSUE WHICH COULD ABSORB VAST RESOURCES (UTILITIES AND NRC) i WITHOUT SUBSTANTIAL PAYOFF IN IMPROVED SAFETY
-o THE BWROG APPROACH PROVIDES FOR REAL IMPROVEMENT WITHOUT' ANALYSIS TO PARALYSIS L
-i
i e
L' i
BWR OWNER $' GROUP MSIV LEAKAGE CLOiURE 1
1 l
PURPOSE:
INCREASE ALLOWABLE HSIV LEAKAGE RATE LIMITS AND ELIMINATION OF REQUIREMENTS FOR LEAKAGE CONTROL SYSTEM 1
i HETHOD:
JUSTIFY ADEQUACY / FUNCTIONALITY 0F NON-1 i
SEISHIC MAIN STEAM AND MAIN CONDENSER COMPONENTS i
CURRENT STATUS:
REVIEW 0F BWROG POSITIONS IN PROCESS:
RADIOLOGICAL DOSE METHODOLOGY CALCULATION o
ONLY CURRENT DISCREPANCIES INV0LVE I0 DINE RESUSPENSION RATES l
MET WITH NRC ON JUNE 4 AND JULY 17 o
SEISMIC JUSTIFICATION VIA B31.1 DESIGN MARGIN, SQUG DATA BASE, AND STUDY OF U.S. BWR DESIGNS NRC HAS APPROVED BWROG APPROACH MET WITH NRC ON JUNE 5 AND JULY 31 L
RELATIONSHIP WITH ABWR LICENSING o
o NRC ORIGINALLY GAVE DIFFERING GROUND RULES TO BWROG AND ABWR (RG 1.3 ASSUMPTIONS)
NRC HAS APPARENTLY RESOLVED DIFFERENCES l
l TAG 21/080290
,-s-e.v.w mw,-.
,-ww..e,._.w,,-
_,,-c.,.,,y,.rm
.___,___m,__
1 l
BWR OWNER $' GROUP l
MSIV LEAKAGE CLOSURE (CoNTINt'ED) i BWROG PROPOSED SCHEDULE l
o REVISE BWR0G DOCUMENTATION, ISSUE 10CFR100 APPENDIX A EXEMPTION, REVISE HOPE CREEK SUBMITTAL (SEPTEMBER '90) 1 i
o 0BTAIN NRC APPROVAL-(N0VEMSER '90) o IMPLEMENT AT HOPE CREEK (JANUARY '91) l l
OVERALL.. ASSESSMENT:
PROGRAM G0ING EXTREMELY WELL, NRC PROVIDING EXCELLENT SUPPORT TO THE REVIEW PROCESS (ASSIGNING 0F E. TR0TTIER AS PROJECT MANAGER
)
HAS BEEN EFFECTIVE)
?
h i
1 l
TAG 21/080290
MOV TESTING o
NRC CONCERNED ABOUT SELECTED SYSTEM MOV CLOSURE CAPABILITY AGAINST DESIGN BASIS FLOWS AT NRC REQUEST, BWROG HAS ACTIVATED RRG BWROG HAS DRAFTED A SAFETY ASSESSMENT OF I
THE ISOLATION FUNCTION OF THESE M0Vs MOVs UNDER CONSIDERATION ARE ALREADY IN THE GL 89-10 PROGRAM, WITN BWROG AND UTILITIES GIVING HIGH-LEVEL ATTENTION TO THIS ISSUE o
BWROG RECOGNIZES AND WILL RESPONSIVELY ADDRESS THE ISSUE o
RESULTS OF 8/1/90 NRC BULLETIN TARGETED FOR 9/1/90 LONG LEAD TIME IF MARDWARE REPLACEMENT REQUIRED BWROG DEVELOPING " GENERIC WAIVER OF COMPLIANCE" i
M0V. TESTING (CONT'D) o VALVE MISPOSITIONING (VMP) i DESIGN BASIS ALREADY CONSIDERS SYSTEMS NOT AVAILABLE 00E TO SINGLE FAILURE OR OPERATOR ERROR (I.E., VALVE MISPOSITIONING)
TESTING FOR VMP-SHOULD NOT BE REQUIRED SINCE IT IS 8EYOND THE DESIGN BASIS BWR06 SENT LETTER TO NRC DOCUMENTING DESIGN BASIS o
A$$UMPTIONS FOR RNR SYSTEM, 6/13/90 DESIGN BASIS REVIEW AND DELTA-P METHODOLOGY FOR RiiR o
SYSTEM COMPLETED WORK CONTINUING ON REMAINING SYSTEMS l
WAZ8/072590-4
- _..~.-.
i l
)
EMERGENCY PROCEDURES COMMITTEE B
l l
o SYMPTOMATIC VERSUS LICENSING BASIS i
j CONTINUED EPC DISCUSSION ON MEANING 0F SER i
FOR EPG REVISION 4 IMPLEMENTATION i
EPC WILL DRAFT LETTER TO NRC STATING EPG PHILOSOPHY J
o STEAM COOLING 1
THADANI (NRC) LETTER TO FLOYD (BWROG)
DATED MAY 1, 1990 4
l EPC IS DEVELOPING CLOSURE PLAN o
)
EPC MET WITH NRC STAFF ON 7/26 DISCUSSED EPG PHILOSOPHY FOR NOT USING NCAD TO REPRESSURIZE CONTAINMENT AGREED THAT CONTINUED TECHNICAL DIALOG IS NECESSARY TO RESOLVE THIS ISSUE t
l WAZ8/073090-1
R.G. 1.97/ NEUTRON MONITORING SYSTEM (NMS) o' NRC RAS RECENTLY RE' ITERATED ITS POSITION THAT BWRs INSTALL A QUALIFIED NMS NRC DID NOT PROVIDE A TECHNICAL BASIS FOR THIS POSITION o'
BWR06 POSITION REMAINS THAT A QUALIFIED NMS IS NOT NECESSARY FOR BWRs NO DESIGN BASIS EVENT WHERE RECRITICALITY IS A CONCERN FOR BEYOND DESIGN BASIS ACCIDENTS, RECRITICALITY HAS NOT BEEN IDENTIFIED AS A SIGNIFICANT CONTRIBUTOR TO CORE MELT RISK INSTALLATION OF A QUALIFIED NHS IS NOT JUSTIFIED ON A COST / BENEFIT BASIS 1)
HAS N0 DEMONSTRATED SAFETY BENEFIT 2)
IS EXTREMELY COSTLY ($1 MILLION TO
$7 MILLION) o BWROG IS PREPARING AN APPEAL OF NRC's POSITION 1
WAZ8/072590-2
l l
VALVE EROSION o
BWROG IS PROACTIVE ON THIS ISSUE IDENTIFIED VALVES WITH POTENTIAL FOR CAVITATION e
OR WITH CAVITATING FLOW SET INSPECTION SCHEDULE FOR ASSESSING EXTENT OF CORROSION o
MANY VALVES INSPECTED RESULTS HAVE BEEN SUBMITTED TO NRC RESULTS INDICATE NO CHRONIC PROBLEM o
RECOMMENDATIONS FOR REDUCING / ELIMINATING. VALVE CAVITATION UNDERGOING UTILITY REVIEW o
BWROG PLANS TO SL'BMIT FINAL REPORT TO NRC IN AUGUST i
i i
i WAZ8/072590-3 I
I i
h BWR OWNERS' GROUP CONTAINMENT TESTING COM4ITTEE PURPOSE:
DEVELOP GENERIC SIAMPARDIZED CONTAINMEHI i
TESTING PROGRAM CURRENT-STATUS:
FEBRUARY 8. 1990 NRC MEETING c
NRC ATTITUDE TOWARD CHANGES DOCUMENTED IN i
DRAFT LTR PERCEIVED AS POSITIVE PROGRESS MADE ON RESOLVING MANY DIFFERENCES CHANGES CONTINUE TO BE MADE TO DRAFT APPENDIX J NRC PROMISED TO FORMALIZE REVISED POSITIONS WITNIN 2 MONTHS (G. ARNDT, RESEARCN) 4 I
CURRENT PROBLEM:
SCHEDULE CONTINUING TO SLIP, STILL NO RESPONSE FROM NRC BWROG HAS ASKED NRC TO ASSIGN PROJECT MANAGER TO FACILITATE A~ TIMELY REVIEW
~
PROCESS (RECOMMEND IT BE IN NRR)
BWROG G0ALS RESOLVE ALL DIFFERENCES PRIOR TO ISSUANCE OF REVISED APPENDIX J APPROVAL OF BWROG LTR AS STANDARD TESTING DOCUMENT TAG 21/080290
p r'
INTERFACING' SYSTEMS LOCA' 69c STAFF HAS INDICATED THEY CONTINUE TO BE CONCERNED WITH i
o I
INTERFACING SYSTEN LOCA i
IN 1986, BWROG ASSESSED THE PROBABILITY OF BWR ECCS FAILURE j
o DUE TO OVERPRES$URIZATION i
PERFORMED IN RESPONSE T0 AE00 STUDY
,l i
NEDC-31339 SUBMITTED TO NRC IN DECEMBER 1986 o
CONCLUSIONS OF BWROG STUDY:
i j
- 1) SAFETY MARGINS DURING OVERPRES$URIZATION GREATER THAN THOSE SPECIFIED IN ASME CODE 4
- 2) CONDITIONAL PROBABILITY FOR ECCS PRESSURE BOUNDARY RUPTURE IN THE EVENT OF OVERPRESSURIZATION IS 3.0E-5/ EVENT (2-3 ORDERS OF MAGNITUDE LESS THAN AEOD l
STUDY SHOWED) i
OVERPRESSURIZATION IS 3.0E-7 PER REACTOR YEAR (AEOD l
" JUDGED" 1.0E-4 TO 1.0E-5).
l
- 4) MOST PROBABLE RESULTS OF OVERPRESSURIZATION ARE MINIMAL, AND OVERPRESSURIZATION CONDITION WOULD BE TERMINATED 1
EARLY BY OPERATORS REACTING TO ALARMS 4
- 5) LOW DESIGN PRESSURE ECCS AND RCIC SYSTEM INTEGRITY SHOULD BE MAINTAINED SHOULD OVERPRESSURIZATION OCCOR o
BWROG HAS ALSO MADE RECOMMENDATIONS TO REDUCE OVER-PRESSURIZATION EVENT FREQUENCY b
WAZ8/073090 l
INTERFACING SYSTEMS LOCA (CONT'D) t CURRENT ACTIVITIES o
6/15/90 NRC/NUMARC/EPRI MEETING DESCRIBED AS "FIRST IN A SERIES" t
l l
WAZ8/073090
l. g, l
t i
[7 LER/JC0
,1 i
-l l
o OBJECTIVES:
l.
1)
.T0 ENHANCE THE VALUE OF THE LER INFORMATION FCR j
UTILITY,AND NRC;USE o!
DEVELUP FURTHER UTILITY GUIDANCE'REGARDING i'
l INTERPRETATION OF 10CFR50.73 REPORTING
.j CRITERIA AND; PREPARATION OF:LERs
-2)
TO BETTiR DEFINE THE APPLICATIONS 0F JC0s-DEVELOP FURTHER INDUSTRY' GUIDANCE REGARDING.
APPLICATION OF JCOs FOR EQUIPMENT GUALIFICA-TION DEFICIENCIES AS'WELL AS A BROADER SCOPE.
OF' DEFICIENCIES g
o PWR PARTICIPATION ENCOURAGED BECAUSE OF POTENTIAL GENERIC APPLICATIONS' o
NUMARC INVOLVED BECAUSE OF INDUSTRY-WIDE INTEREST j
o NRC INVOLVEMENT.IS IMPORTANT IF. GUIDANCE-IS TO ACHIEVE l
ITS MAXIMUM POTENTIAL.VALUE i'
4 J
4-WAZ8/072590
)
i-l
..o
c 1
i LER/JC0 (CONT'0)'
lI
,j o
STATUS 0F'LER' GUIDANCE
,l J
MOST FREQUENTLY APPLIED 10CFR50.73 EEPORTW.i H
CRITERIA IDENTIFIED DRAFT GUIDANCE DEVELOPED FOR:THESE CRITERIA-~
'~.
.l COMMITTEE MEETING BEING HELD AUGUST 2 TO REVIEW.
DRAFT GUIDANCE WITN EXPECTED SIGNIFICANT PWR-
' ATTENDANCE
~
COMMITTEE MEMBERS AND NUMARC TO MEET WITH NRC ON AUGUST 14 i
PURPOSE: WORKING' LEVEL MEETING TO DISCUSS-THE LER GUIDANCE BEING PREPARED:ANDLTO EXCHANGE.INFORMATION ON CONCERNS WITH THE i
LER PROCESS o
STATUS OF JC0 ' GUIDANCE BASED ON EXISTING NRC GUIDANCE, DEVELOPED:A' j
PROCESS FOR ADDRESSING DEGRADED CONDITIONS?AND j
i NONCONFORMANCES, WITH EMPHASIS ON JCOs CURRENTLY DRAFTING GUIDANCE l
o PLAN TO REQUEST A NRC-CONTACT AND MEET WITH THE.
NRC IN THE NEAR FUTURE l
l 1
(
L WAZ8/072590 l
l_.
, _.~._. _.
s j
a 1
MAIN STEAMLINE RADIATION MONITOR j
e, o
0BJECTIVE:
ELI4INATE MSLRM AUTOMATIC MSIV CLOSURE AND SCRAM FUNCTIONS-t FUNCTIONS / RE REDUNDANT.0R UNNECESSARY-
'b RECOGNIZED SAFETY AND OPERATIONAL BENEFITS d
o BWROG MET WITH NRC, 3/22/90 J
NRC~ CONCLUDED BWROG PROPOSAL IS ACCEPTABLE AND
-4 AGREED-TO ISSUE A FAVORABLE SER 1
NRC EXPECTED TO ISSUE SER 60 DAYS.AFTER BWROG
.j I
DOCUMENTED COMMITMENTS MADE DURING THE MEETING BWROG SUBMITTED LETTER SATISFYING NRC REQUEST,-
4/19/90 d
d i
i.
I e
WAZ8/072590-1
j
.c.
1
+
l l
MAIN ~STEAMLINE' RADIATION MONITOR'(CONT'D) l o
CURRENT: STATUS i
RADIATION-PROTECTION BRANCH PROVIDED SER. INPUT--TO~-
l-REACTOR: SYSTEMS BRANCH, 6/28/90'.
L REACTOR SYSTEMS' BRANCH EXPECTS 70 ISSUE DRAFT SER,
[
~
L c/31/90:
\\
.CRGR REVIEW MAY BE NEEDED t
- BWROG REQUESTS ' EXPEDITIOUS COMPLETION 0F THE SEF-4 o-19 UTILITIES (31 PLANTS): PLAN-TO IMPLEMENT THE-IMPROVEMENTS UPON NRC APPROVAL 1
APPROVAL SUPPORTS IMPLEMENTATION'0F HYDROGEN' WATER CHEMISTRY l
I i
k WAZ8/072590 1
. ~.
a s
i ENCLOSURE 1.
L NRC COMPLETED BWROC REVIEWS l
'BWROC ACTIVITY NRC SER OR RESPONSE ISSUED.
- 1) Emergency Procedures Committee 9/88 i
- EPGs, Revision 4 l
i i
l-
-7/87 Relay a
.(NEDC 30851P) 1/88 Solid State-Rod Block; Instrumentation LTR 9/88:
(NEDC 30851P, Supplement 1) s ECCS Instrumentation LTR.
12/88 (NEDC 30936P, Part I)'
s Isolation Instrumentation 1/88-Common to RPE/ECCS LTR (NEDC-30851P,. Supplement 2) 3
.ECCS Instrumentation LTR 12/88
.(NEDC 30936P, Part II)
Revised Reactivity Control-Informal comments-System Tech Specs received 10/88 (EAS-46-0487), comments only requested Isolation Actuation Instru'e.mtation 6/90 l
- 3) IE Bulletin 85 03 8/88 Common Methodology for Valve Load Definition I
(
- 4) RWCU System Improvements
.12/88 V
- 5) ATWS Diversity
-4/89
-(Note: Based on additional input, o
l BWROG has appealed NRC position) i
- 6) Neutron Monitor System Regulatory Guide 1.97 1/90 BWROG' position (Note: BWROC preparing appeal) rej ec ted i
- 7) Mark I Hardened Vent 4/90; l
General Design Criteria l
.8)
BWR-Stability Licensing 5/90 l
L Basis for Long Tern Solution l
9)
BWR Stability Margin 4/90 Verba1Lfeedback
& ATVS Evaluations (6/89) received i
008:674 01/080290
i
- L ENCIDSURE 2
.1,' '
j 4..,
BWROC OPEN SUBMITTALS/ ISSUES TO NRC 1
SUBMITTAL DATE.
NRC SCHEDULE FOR REM q
BVROC ACTIVITY.
- 1) MSL Ra'diation Monitor 7/87 Questions received 9/88
'i l'
. MSIEM LTR
, Responses submitted-4/89
_and 10/89, Closure Mtg 3/90 I
i l
- 2) Suppression Pool Temperature Limit LTR
.6/89
. Quencher Discharge Limit 3/85
. Normal Operating Limit 5/89 6/89
/
- 3) Improved Tech Specs 5/89; 12/90
'l 4)- Technical' Specification 3/90 Not Communicated-
-Supplemental Screening Application Report 1
- 5) ATWS Diversity 8/89 Appeal Not Communicated
- 6) Rod Worth Minimizer 11/89 Start ' June 1993 Improvement 6 90 Jl
- 7) Drywell Inspection 12/89 f
- 8) Containment Testing 8/89 4/90 (Draft submitted for comment)
- 9) Control Systems 3/90 Not Communicated (GL 89 19)
- 10) SRV Setpoint Tolerance 7/90 Not Communicated l
s i
i l-l l'
OG8:674 01/080290
7 ENCLOSURg 3-FUTURR BUROC SUAMITIALS TO NRC
-l
{]i S'JtJIOT OBJECTIVE RIAIU1 i
- 1) MOV Testing (GL 89 10)
Develop standard method.
Submittal: targeted i
ology for calculati,ng :
for 12/90 l
valve maximum differential pressures-1l 1
- 2) - Valve Erosion Assess extent of:cavita -
' Submittal-targeted tion / erosion in SWR' valves for 8/90 P
used in' throttling appli.
. cations. Recommend alternatives'for reducing /
1 eliminating cavitation
- 3) BWR Stability Supplemental information
. Submittal targeted Licensing Basis for on options /1C andt1D for 8/90' Long. Term Solution
- 4) BWR Stability Final licensing basis Submittal targeted report on long term for 12/90 solution alternatives
- 5) ATWS/ Stability Draft analysis basis Scheduledsfor 12/90 for resolving ATWS/
Stability: issues
- 5) Hydrogen Water Demonstrate with improved'
. Submittal targeted:
Chemistry Piping water chasistry, including for 3nd quarter 1990 Inspection Intervals hydrogen water chemistry,-
that safety margins are maintained with increased piping inspection intervals
- 7) Neutron Monitor Appeal NRC position regard-Submittal targeted-i system ing. insta11stion of a 8/90
- Reg Guide 1.97 Qualified Neutron Monitor Systes l'
- 8) MSIV Leakage Revised submittal of submittal targeted Radiological Dose method-for 9/90. Draft.
ology and seismic justi-reports have been fication as basis to reviewed increase allowable leakage i
limit and remove 1.CS l
008:674 01/080290
-.- e$
=i A
ENCLOSURE /2L BWROG/NRC EXECUTIVE MEETING' I
AUGUST 2, 1990 j
f NAME ORGANIZATION
' PHONE P. W. Marriott GE (408)l925-6948'
(
Steven J. Stark GE Bob Binz PSE8G/BWROG/Vice Chairman
- t L.- Gifford BWROG/GE.
301 :770-9650 1
C. Ca11awey NUMARC; 202 872-1280L Li W. T. Russell-NRC 301 492-1274'-
S. Newberry HRC 310 492-0821.
l A. Thadani NRC 301 '492-0884 1
-L. Phil11)s NRC 301 492-3232-Gary Hola1an-NRC 301 492-3226
.S. D. Floyd BWROG/CP&L 919 546-6901 G. J. Beck
'BWROG/PEco.
215 640-6450; J
708 515-7575 D. Galle BWROG/ Ceco, T. Rausch BWROG/ CECO 312 294-3850-
'R. Jones-NRC/NRR 301 492-0895.
t!
'L. B. Marsh NRC/EMEB 301 /492-3288 J. A. Kudrick NRC/SPLB 301 '492-0871 R. Dudley NRC/DRSP 301 492-1355 J. E. Richardson NRC/DET 301 492-0722 Mark Rubin NRC/ DST 301 :492-1813 Ralph Architzel NRC/SPLB 301 1492-0804 C. Y. Cheng NRC/EMCB 301 492-0796
}
a '
4 6
i l
l J