Requests 90 Day Extension,On or Before 940215 in Order to Adequately Respond to NRC Re Sewer Sys & Sink Holes
ML20059G447
Person / Time
Site: Neely Research Reactor
Issue date: 10/07/1993
From: Karam R
Neely Research Reactor, ATLANTA, GA
To: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9311080154
Download: ML20059G447 (1)


Text

<

l i ,, ~ . ,,['h e Georgia Institute of Technology gg gl

~

NEELY NUCLEAR RESEARCH CENTER L, s74 [ 900 ATLANTIC ORIVE

',,'""'"d' ATLANTA. GEORGIA 30332O425

[404] 894-3600 USA October 7, 1993 Mr. Douglas M. Collins, Chief Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards U.S. Nuc' ear Regulatory Commission, Region II 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323-0199

Dear Mr. Collins:

In order to adequately respond to the concerns expressed in the information you sent us in your letter of September 14, 1993, regarding the sewer system and sink holes, the Georgia Institute of Technology is contracting with outside consultants to perform an evaluation of the problem (s) and their potential impact on the Georgia Tech Research Reactor. Since the evaluation will take time, I am request.5g a ninety day extension, i.e., on or before February 15, 1994 our response be sent to you.

We appreciate your cooperation in this matter.

Sincerely, 0 0~'

R.A. Karam, Ph.D., Director Neely Nuclear Research Center RAK/ccg cc: Dr. Gary Poehlein Mr. James Priest, Director Georgia Tech Plant Operations c