Discusses Insp Rept 50-271/93-30 on Stated Date.No Violations Noted
ML20059G443
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 01/07/1994
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20059G446 List:
References
NUDOCS 9401240164
Download: ML20059G443 (3)


See also: IR 05000271/1993030

Text

s

1' 4

JAN 7 1994

l

Docket No. 50-271-

Mr. Donald A. Reid i

Vice President, Operations

Vermont Yankee Nuclear Power Corporation

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

Dear Mr. Reid: ,

SUBJECT: INSPECTION REPORT NO. 50-271/93-30 ,

This letter refers to an inspection conducted by Mr. S. K. Chaudhary on  :

!

November 16-19, 1993, at the Vermont Yankee Nuclear Power Station, Vernon, Vermont

and additional review of records ending on December 17, 1993, at King of Prussia,

Pennsylvania. Mr. Chaudhary discussed the interim results of the inspection with -l'

Mr. R. J. Wanczyk and other members of your staff on November 19, 1993.

Mr. Chaudhary discussed the final results of the inspection and the extended records review.  ;

with Mr. B. R. Buteau of your staff by telephone on December 17, 1993.  ;

,

~

The inspection was intended to promote public health and safety, and focussed 'on the ,

engineering and technical support program that assures the continued integrity of the design,

and the operational safety of the plant. Areas examined during this inspection are described .

in the NRC Region I inspection report which is enclosed with this letter. Within these areas, '

!

the inspection consisted of selective examination of procedures and representative records,

interviews with personnel, and observation by the inspector.

'

Within the scope of this inspection, the design change and modification program, and

engineering / technical support to the plant operation were found to be satisfactory, and to

meet the regulatory requirements and your commitments. l

l

1

!

l

il

9401240164 94o107 i

PDR ADOCK 05000271-- D

G PDR ..

[IPf kli 1

' 1( l

i

___ - - . _ ]

_ _ _ _ - __

JAN 7 1994

,

Ve.rmont Yankee Nuclear 2

Power Corporation

No reply to this letter is necessary, and your cooperation with us is appreciated.

Since~

orianal siguen nr.

Jacque P. Durr, Chief >

Engineering Branch

Division of Reactor Safety

Enclosure: NRC Inspection Report No. 50-271/93-30

,

cc w/ encl:

R. Wanczyk, Plant Manager

J. Thayer, Vice President, Yankee Atomic Electric Company

L. Tremblay, Senior Licensing Engineer, Yankee Atomic Electric Company

J. Gilroy, Director, Vermont Public Interest Research Group, Inc. 3

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

Chief, Safety ' Unit, Office of the Attorney General, Commonwealth of Massachusetts

R. Gad, Esquire

-

G. Bisbee, Esquire

R. Sedano, Vermont Department of Public Service

T. Rapone, Massachusetts Executive Office of Public Safety

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

State of New Hampshire, SLO Designee

State of Vermont, SLO Designee

Commonwealth of Massachusetts, SLO Designec

l

,

k

..

,

,

JAN 7 1994

Vermont Yankee Nuclear 3

Power Corporation

'

bec w/ encl:

Region I Docket Room (with concurrences)

E. Kelly, DRP

J. Shedlosky, DRP ,

bec w/enci (VIA E-MAIL):

W. Dean, OEDO

D. Dorman, NRR

'

W. Butler, NRR

,

, /

RI:DRS

j

'

S

@

RI:DRS

Durr

Cggry es

+2bff3- -til /s.3 ' 1/G/94

'l5l41 ) 3iI yu/ OFFICIAL RECORD COPY

A:VY9330. INS