ML20059G443
| ML20059G443 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 01/07/1994 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Reid D VERMONT YANKEE NUCLEAR POWER CORP. |
| Shared Package | |
| ML20059G446 | List: |
| References | |
| NUDOCS 9401240164 | |
| Download: ML20059G443 (3) | |
See also: IR 05000271/1993030
Text
s
1'
4
JAN
7 1994
l
Docket No.
50-271-
Mr. Donald A. Reid
i
Vice President, Operations
Vermont Yankee Nuclear Power Corporation
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
Dear Mr. Reid:
,
SUBJECT: INSPECTION REPORT NO. 50-271/93-30
,
This letter refers to an inspection conducted by Mr. S. K. Chaudhary on
!
November 16-19, 1993, at the Vermont Yankee Nuclear Power Station, Vernon, Vermont
and additional review of records ending on December 17, 1993, at King of Prussia,
Pennsylvania. Mr. Chaudhary discussed the interim results of the inspection with
-l
'
Mr. R. J. Wanczyk and other members of your staff on November 19, 1993.
Mr. Chaudhary discussed the final results of the inspection and the extended records review.
with Mr. B. R. Buteau of your staff by telephone on December 17, 1993.
,
The inspection was intended to promote public health and safety, and focussed 'on the
~
,
engineering and technical support program that assures the continued integrity of the design,
and the operational safety of the plant. Areas examined during this inspection are described
.
in the NRC Region I inspection report which is enclosed with this letter. Within these areas,
'
the inspection consisted of selective examination of procedures and representative records,
interviews with personnel, and observation by the inspector.
'
Within the scope of this inspection, the design change and modification program, and
engineering / technical support to the plant operation were found to be satisfactory, and to
meet the regulatory requirements and your commitments.
l
l
1
i
i l
9401240164 94o107
[IPf kli
D
ADOCK 05000271--
G
1
..
' 1(
l
i
___ - - .
_
]
_
_
_
_
-
__
JAN
7 1994
,
Ve.rmont Yankee Nuclear
2
Power Corporation
No reply to this letter is necessary, and your cooperation with us is appreciated.
Since~
orianal siguen nr.
Jacque P. Durr, Chief
>
Engineering Branch
Division of Reactor Safety
Enclosure: NRC Inspection Report No. 50-271/93-30
,
cc w/ encl:
R. Wanczyk, Plant Manager
J. Thayer, Vice President, Yankee Atomic Electric Company
L. Tremblay, Senior Licensing Engineer, Yankee Atomic Electric Company
J. Gilroy, Director, Vermont Public Interest Research Group, Inc.
3
D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire
Chief, Safety ' Unit, Office of the Attorney General, Commonwealth of Massachusetts
R. Gad, Esquire
G. Bisbee, Esquire
-
R. Sedano, Vermont Department of Public Service
T. Rapone, Massachusetts Executive Office of Public Safety
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
State of New Hampshire, SLO Designee
State of Vermont, SLO Designee
Commonwealth of Massachusetts, SLO Designec
l
,
k
..
,
JAN
7 1994
,
Vermont Yankee Nuclear
3
Power Corporation
'
bec w/ encl:
Region I Docket Room (with concurrences)
E. Kelly, DRP
J. Shedlosky, DRP
,
bec w/enci (VIA E-MAIL):
W. Dean, OEDO
D. Dorman, NRR
'
W. Butler, NRR
,
/
,j
@
S
RI:DRS
RI:DRS
'
Cggry
es
Durr
+2bff3-
-til /s.3 '
1/G/94
'l5l41
) 3i yu
I
/ OFFICIAL RECORD COPY
A:VY9330. INS