ML20059G168
| ML20059G168 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 11/01/1993 |
| From: | Doerflein L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 9311080024 | |
| Download: ML20059G168 (2) | |
Text
..
e NOV 011993 No.93-141 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT MEETING Licensee:
Northeast Utilities (NNECo, CYAPCo and NUSCo)
Facilities:
Connecticut Yankee Atomic Power Station Millstone Nuclear Power Station, Units 1,2 and 3 Docket Nos.:
50-213, 50-245, 50-336 and 50-423 Time and Date:
10:00 a.m. - Noon, November 9,1993 l
Location:
Executive Conference Room Region I, King of Prussia, PA
Purpose:
Licensee Presentation on Engineering Integration and Organizational Issues NRC Attendees:
T. Martin, Regional Administrator R. Blough, Chief, Division of Reactor Projects (DRP)
Branch No. 4 L. Doerflein, Chief, DRP Section 4A
+
C. Miller, Deputy Director, Division of Reactor Safety (DRS)
J. Durr, Chief, Engineering Branch (EB), DRS f
Licensee Attendees:
J. Opeka, Executive Vice President - Nuclear R. Kacich, Nuclear Licensing Director
' NOTE:
This meetmg is open to the public for observation only. Handicapped persons requiring assistance to attend or participate in this meeting shall make their requests known to Larry Doerflein, USNRC, Region I,475 Allendale Rd., King -
)
of Prussia,- PA 19406, (215) 337-5378, no later than two business days prior to the meeting.
!M Prepared bh:
V L. T. Doerflein, Chief f Reactor Projects Sectioh 4A, PB4, DRP I
.i ci 93110B0024 931101
/
i
)D -
PDR ADOCK 05000213
.P PDR
?
~
Distribution (Via E-Mail):
J. Taylor, Executive Director for Operations (EDO) l-J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)
H. Thompson, Deputy Executive Director for Nuclear. Material Safety, Safeguards and Operations Support (DEDS)
B. Grimes, Director, Division of Operating Reactor Support, NRR C. Rossi, Director, Reactor Inspection & Licensee Performance, NRR J. Lieberman, Director, Of5ce of Enforcement I
S. Lewis, Of5ce of the General Counsel (OGC)
T. Murley, Director, Office of Nuclear Reactor Regulation W. Russell, Associate Director for Inspection and Technical Assessment, NRR J. Partlow, Associate Director for Projects, NRR S. Varga, Director, Division of Reactor Projects - I/II, NRR J. Calvo, Assistant Director for Region I Reactors, NRR S. Bajwa, RPEB/NRR l
V. McCree, Regional Coordinator, OEDO N. Green, Jr., Policy Development and Technical Support Branch l
J. Stolz, Project Directorate I-4, NRR D. Jaffe, Project Manager, NRR A. Wang, Haddam Neck Project Manager P. Swetland, Millstone Senior Resident Inspector W. Raymond, Haddam Neck Senior Resident Inspector l
Region I Branch Chiefs K. Abraham, Public Affairs Of5cer, RI D. Screnci, Field Public Affairs Of5cer, RI M. Miller, State Liaison Officer, RI K. Smith, Regional Attomey, RI D. Holody, Enforcement Officer, RI B. Letts, Office of Investigations, Region I Field Of5ce P. Jefferson, DRMA, RI L
1 l
l
b 3
u Distribution:
Public Document Room (PDR)
{
Local Public Document Room (LPDR)
State of Connecticut.
l Regional Administrator Secretary, RI l
DRP Division Secretary, RI DRSS Division Secretary, RI DRMA Division Secretary, RI
.i Projects Branch No.1, Secretary, RI 1
Region I Receptionist i
t i
i t
i L
4 I
7 O-RI:DRP RI:DRP -
dD'ibn i
Blough 11/1 /93 11///93 P
5 F-;
a
-,.