NUCLEAR REGULATOPU COMMISSIONL REGION 1II.
-R'eport No.: 50-116/0L-90-31' Docket No. 50-116.
License No._Ra59; Licensee: JLlowa State'Un.iversityl Nuclear Engiaeering'. Department' Research Nuclear Reactor 261 Sweeney Hall l
Ames',tlAL50011' p
Facility Name:
Iowa State Universitys Examination Administered Att Ames, IA Examination Conducted:- l July 19 and '20',1990.
- l J
HQS Examiner, fp d
P.s /- 90 B. _ kTetzel V
Date i
Chief Examine 4//hN J/-76'
(
' N. Wettir' son' Date
~i a
Approved By:
f
/ 96 r
M.. J./@rdan, Chief Date Operft6r Licensing Section #1 Examination Summary Examination administered on July 19 and 20,1990 (Report N). 50-116/0L-90-01)
Operator licensing examinations were administered to two Senior Reactor 0perator (SR0) candidates, one SR0 instant.and one SR0'upgride. Only one.
?
written examination was administered to the SR0 instant. Tte SR0_ upgrade was waived.from taking the written portion of the' examination.
Results:
Both candidates successfully passed the'operatir.g portion: of the examination. The SR0 instant successfully passed the~ written examination. -No generic weaknesses were identified 2in the licensee's training program during 4
i the administration of this licensing exualattion.
a 9009120138 900905 PDR ADOCK 05000116.
V PNU h;
t
m i.'-
u-
/
REPORT-DETAILS' 1.
Examiners H. Peterson~ Chief Examiner, NRC, Region III'
- B, Wetzel, Examine', NRC, Headquarters r
i 2..
Facility 1 Representative f
~
- R. Hendrickson, Reactor l Manager;'
- Denotesthosepresentatthemanagementexitmeetingon1Jul[20,1990.
s
. 3..
Summary of Results Written 0perating' 0verall Pass / Fail Pass; Ui11 Pass / Fail-SR0' 1/0
-2/0
-2/0-1 J(NOTE: The SR0 upgrade receive'd a waiver from'the' written exam.).
5
.i 4.
. Exit Meeting A management exit-meeting was conducted at the Iowa State' University Research Nuclear Reactor-Facility 'on July 20, 1990..
representative who attended lthe meeting is listed.in~ Paragraph 2The facility (abl of this report.
~
]
1 The following items were discussed during the exit' meeting, a
a.
.The examiners -had extremely -good cooperotiun from the facility
'i personnel, including a thorough' tour prior to the administration =
of the' exam.
b.
No generic weaknesses in training were iioted during the: exam process.-
c.
One candidate displayed unfamiliarity with the Rod Worth Procedure.
Although this procedure.is only performed onceLa year and'therefore the. candidate hod not had the-opportunity to observe it:being
.I performed, as a SR0 the candidate could-theoretically have.the responsibility for. directing the performance of this surveillance, a
He should have a'. thorough working. knowledge of this procedure. even though he had not yet performed it.
j 1
a I
6 i.
y 7
+ c O..
y
,w
-Enclosure 2
' Facility' Coments' and' NRC Re' solution 'of Coments~.
- 1. -.
Facility-Coment: L.QuestionA'.002. -Answer M.5.1 inches..
Facility Justification:
Af.= '-5 F * -0.00384 %.A k/k/F +l. 5 (%>vSid);* -0.172l%A k/k/(% void)
- Af = 10,0668. % A k/.k J
j So 0.0668 %.d k/k"is needsd.; hrefIre,
<'t WithdrawalL= 0.0668 %-: A k/kLdivhed by 0.0132' %M k/k/ inch Withdrawal = 5.06. inches
~
~
. Recommended Resolution: Delete the; question since.theLcorrectianswer.
.is not among: choices.
NRC Resolution:
Coment accepted. : The question ' willi be delete' ifrom the d
exam..The key was incorrect.
y 2.
Facility Coment: Question.A.004'.n CorrectLanswer is;"B'".
- Facility Justification:
The'. listed answer on the answer key isla
. typographical error.
' Recomended Resolution: Accept answer "B only.
t NRC Resolution: Comment accepted. Answer ' key changed..
s 3.
Facility Comment: Question A.012.. Answers "A". and:"B" are correct.
Facility 00stification: A prompt critical reactor is supercritical..
~
Recommendt d Resolution: Accept both answers "A" and "B".
l -.
l NRC Resalution: Comment noted.. Answer "A" does not need to be accepted for this exam because the candidate chose the correct' answer, "B";-
The question will be reviewed for a possible rewrite prior to uploading to the exam bank.
4.
Facility Comment:. Question A.014. The answer 'is correct, but the
'i reference is wrong.
Recommended Resolution: Change the reference to "ISU-l Operations Projects", P. 11.
NRC Resolution:
Comment.noted. References will'be changed prior to uploading to the exam bank.
fi 4-',,
,a
- ?
\\
, ; y, y,7
'5 Facility C6 ment:. Question' A;015. The; answer is' correct, but the
- reference is not
- relevant.' -
, Facility Resolution: ' Change' reference to general know~ ledge.--
NRC' Resolution:L Coment noted.. References will;be changed prior to
= uploading {to the' exam bank.
- 6. M Facility Coment: iQuestion A.019.
None,of'the listed / answers are' Ecorrect.:'
Facility Justification':: The gross: current produ'ced by neutrons is:
independent of the. voltage applied to the compensat.ingl.section of.a compensated. ion chamber (CIC)L-.The. net current produced by a CIC is reduced by overcompensation. ;The cause of the reduction is an increasesinL the compensating current procedure per gama ray interaction in the.
compensating region of the CIC,Lnot a reduction >in the number of neutron:
-interactions.
Note that a short, yet complete,, answer for Question A.019 is difficult to phrase.
- L j
Facility Resolution:
Delete.the question.
j NRC Resolution: LComent-accepted. - Qubstion deletedh 7.
Facility Coment: Question B.001,-Part 4.
The answer-should be "Anyone in the Nuclear Engineering Lab.";
l Facility-Justification:. all holders-of outside Nuclear Engineering Lab
]
keys are trained to initiate the Emergency' Response Procedure upon
}
observation of an emergency condition.3 All;of them are capable'of; 1
turning on the evacuation bell switch.
Reference:
Emergency! Plan Response Procedure, P. 1.
Facility Resolution: Delete the question.
i 4
NRC Resolution: Coment accepted.
Part 4 of qiiestion is(deleted.
i 8.
Facility Comment: Question C.007.
"B" is the correct answer for the
- 1 question as stated, but "C" is acceptable.:
{
l Facility Justification: - The Technical Specifications' state that~the drop L
time shall not exceed 600 ms, but the drop-time' includes the' delay time.
l L
Delete the phrase " excluding the delay time" to make'"C" the correct i
answer.
Reference:
Technical Specifications _, P. 1-1.,
i l
4 Facility Resolution:
Accept both answers "B" and "C".
s 1
b NRC Resolution: Question deleted. The phrase " excluding the delay time"'
l made answer "B" incorrect and the question confusing'. Both answers could; not be accepted as correct for this question.