ML20059G075

From kanterella
Jump to navigation Jump to search
Forwards GENE-523-141-1093, Evaluation & Screening Criteria for Peach Bottom Unit-3 Shroud Indications. Document Provided for Info in Preparation for Upcoming Meeting on 931103 W/Nrc
ML20059G075
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/29/1993
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059G078 List:
References
NUDOCS 9311050279
Download: ML20059G075 (1)


Text

.

fi f

~

PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP liEADQUARTERS 955-65 CHESTERBROOK BLVD.

WAYNE. PA 19087-5691 i

October 29, 1993 (215) 640#KO Docket Nos. 50-277 j

50-278 License Nos.

44 STATION SUPPORT DEPARTMENT l

U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555 i

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 Preliminary Information Regarding Core Shroud Indications i

Dear Sir:

Enclosed is a document entitled " Evaluation and Screening Criteria for the Peach Bottom Unit 3 Shroud Indications." This document is considered preliminary in that our reviews are not yet complete. This document is being provided for your information in preparation for our upcoming meeting on November 3, 1993.

If you have any questions, please do not hesitate to contact us.

Very truly yours, (fy g

) d PYcu 7 GM G. A. Hunger, Jr., Director Licensing Section l

I Enclosure cc:

T. T. Martin, Administrator, Region I, USNRC W. L. Schmidt, USNRC Senior Resident Inspector, PBAPS l

l I

9311050279 931029 E

PDR ADOCK 05000277

~

1 P

PDR Ej

.