Forwards Generic Issue Mgt Control Sys Fourth Quarter FY93 Update. Rept Reflects Listed Major Activities That Occurred During Reporting Period
ML20059F954
Person / Time
Issue date: 10/28/1993
From: Beckjord E
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20059F959 List:
References
REF-GTECI-MI, REF-GTECI-SC, TASK-***, TASK-OR NUDOCS 9311050190
Download: ML20059F954 (2)


Text

ga ucg

[q f*.

a < l' S

UNITED STATES Q, s. i NUCLEAR REGULATORY COMMISSION s,, v /

WASMNGTON, D C. M5W

...+

(

OCT 2 s 1993 MEMORANDUM FOR:

James M. Taylor Executive Director for Operations FROM:

Eric S. Beckjord, Director Office of Nuclear Regulatory Research

SUBJECT:

GENERIC ISSUE MANAGEMENT CONTROL SYSTEM - FOURTH QUARTER FY-93 UPDATE Enclosed is the Fourth Quarter FY-93 update of the Generic Issue Management Control System (GIMCS) for your information. This report reflects the following major activities that occurred during the reporting period.

(1)

Three generic safety issues (GSIs) were resolved:

143 (HIGH)

Availability of Chilled Water Systems and 4

Room Cooling HF4.4 (HIGH)

Guidelines for Upgrading Other Procedures r

I.D.3 (MEDIUM)

Safety System Status Monitoring (2)

Four GSIs were prioritized:

146 (RESOLVED) Support Flexibility of Equipment and Components 159 (DROP)

Qualification of Safety-Related Pumps While Running on Minimum Flow 160 (DROP)

Spurious Actions of Instrumentation Upon Restoration of Power 162 (DROP)

Inadequate Technical Specifications for Shared Systems at Multiplant Sites When One Unit Is Shutdown 0400n s

1 I

f

'M 9311050190 931028 L

%,-d PDR GTECI GNI143 6

PDR

[

OCT 3 S 1993 Seventeen GSIs remain to be resolved including five that are scheduled for resolution in the First Quarter of FY-94. There are five issues that remain to be prioritized with four of these scheduled for completion during the First Quarter of FY-94. I will continue to keep you informed of progress in resolving these issues as well as any major problems that might surface during the course of their resolution.

W]

Eric S. Beckjord) Director Office of Nuclear Regulatory Research

Enclosure:

GIMCS Fourth Quarter FY-93 Update cc: See Next Page O

O

4-OCT 2 819s3 cc: w/ enclosure.

RES NRR C. Ader, NLS-324 R. Young, 12E4 R. Emrit, NLS-314 =

R. Borchardt,-13E4 F. Cherny, NLS-314 P. Cota, 12D20 F. Coffman, NLN-316A F. Gillespie, 12G18 T. King, NLS-007 W. Long, 13H15 J. Murphy, NLS-007 T. Murley, 12G18-G. Marino, NLS-007 J. Richardson, 8H3 G. Mazetis, NLS-324 A. Gautam, 9Al W. Minners, NLS-007 T. Boyce, 11H3 J. Flack, NLS-324 J. Wilson, llH3 A. Murphy, NLS-007 C. Miller, llH3' J. Kramer, NLN-316 M. Malloy,11H3 P. Norian, NLS-314 J. Fair, 7E23 J. Persensky, NLN-316 G. Hubbard, 8d1 J. Heltemes, NLS-007 P. Kadambi, NLS-314 NMSS H. Vandermolen, NLS-372 R. Bernero, 6E6 C. Serpan, NLS-217C J. Austin, SE4 J. Wachtel, NLN-316 R. Baer, SD23-M. Cunningham, NLS-372 L. Bell, SE4 L. Shao, NLS-007 B. Sheron, NLS-007 AE00 L. Shotkin,-NLN-353 E. Jordan, 3302 T. Spels, NLS-007 H. Bailey, 5211 R. Kornasiewicz, NLS-260 M. Drouin, NLS-324 J. McCausland, NLS-139 s

REGIONS T. Martin, Region I S. Ebneter, Region II A. Davis, Region III J. Milhoan, Region IV OTHERS J. Martin,, Region V M. Taylor, EDO, 17G21 D. Adams, ACRS, P-315 S. Duratswamy, ACRS (6), P-315 J. Kopeck, 2G5 K. Olive, 10204 H. Schecter, IP, 3H5 W. Usilton,.0-622 PDR DCS s

b-

_ _ _ _ _