ML20059F929

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1993 for Monticello Nuclear Generating Plant
ML20059F929
Person / Time
Site: Monticello 
Issue date: 12/31/1993
From: Richard Anderson, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9401140237
Download: ML20059F929 (5)


Text

,

l-Northem States Power Company 414 Nicollet Mall Minneapohs, Minnesota 55401-1927 Telephone (612) 330-5500 January 12, 1994 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn

  • Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report December, 1993 Attached is the Monthly Operating Report for December, 1993 for the_Monticello Nuclear Generating Plant.

l ff f f ' 4W Roger O Anderson Director Licensing and Management Issues Director, Office of Resource Management c:

Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment I

/

I l

((' \\

.150003 9401140237 931231 PDR ADDCK 05000263

v. ;

R PDR k

OPERATING DATA REPORT-

[

DOCKET NO.

50-263 DATE 1-3-94 COMPLETED BY H.

H.

Paustian l

TELEPHONE 612/295-5151-OPERATING STATUS

] Notes

-]

1. Unit Name :

Monticello

]

]

1

2. Reporting period:

December

]

.] _

3.. Licensed Thermal Power (MWt):

1670

]

-]

4. Nameplate Rating (Gross MWe) :

569

]

]

4 5.

Design Electrical Rating (Net MWe):

545.4' -]

]

j

'6. Maximum Dependable Capacity (Gross MWe): __564

]

]

7. Maximum Dependable Capacity (Net MWe):

536

')

]

8.

If Changes Occur in Capacity Ratings (Items Number 3 -Through 7) Since Last' j

Report, Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any: __N/A l

i THIS MONTH YR.-TO-DATE CUMULATIVE'

11. Hours In Reporting Period 744 8760 197281
12. Number Of. Hours Reactor Was Critical 744.0 7391.0 159375.7 l'

.13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7

14. Hours-Generator On-Line 744.0.

7324.5 156600.7 15., Unit Reserve Shutdown Hours-0.0 0.0 0.0

16. Gross Thermal Energy Generated (MWH) 1241429 11871367 241264780
17. Gross Electrical Energy Generated (MNH) 421187 4023863 81554663

'18. Net Electrical Energy Generated (MWH) 406279 3862906-78018793

19. Unit Service Factor 100.0%

83.6%

79.4%.

'20. Unit Availability Factor 100.0%

.83.6%

79.4%

-i

21. Unit Capacity Factor (Using MDC Net) 101.9%-

.82.3%

73.8%-

22. Unit Capacity Factor (Using DER Net)

.100~.1%

80.9%

72.5%

L23. Unit Forced Outage Rate-0.0%.

1.5%-

3.6%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each) 1
Refueling Outage - 9/15/94 - 39 days
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A f
26. Units In Test Status (Prior-to Commercial Operation) : N/A Forecast Achieved j

INITIAL CRITICALITY

^

INITIAL ELECTRICITY COMMERCIAL OPERATION l

i

?

')

h a

v ve

t 4.

AVERAGE DAILY. UNIT POWER ~ LEVEL-DOCKET NO.

50-263 UNIT-Monticello-DATE 1-3-94-.

COMPLETED BY. H; H.

Paustian

~

TELEPHONE 612/295-5151 1

MONTH OF December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(MWe-Net)

(MWe-Net) 1 547.

17 546.

2 543.

18 548.

3 543.

19 545.

4

548, 20 547.

5 545.

21 548.

6 546.

22 548.

j t

7 545.

23 548.

8 549'.

24 549.

9 541.

25 546.

10 544.

26 550.

l 11 544.

27 548.12-545.

28 547.

13 544.

29

547, 14 544.

30 548.

15 542.

31 548.

16 546.

i INSTRUCTIONS On this-format, list the average daily unit power level in MWe-Net for each.

~ day in the reporting month.

Compute to the nearest whole megawatt.

y

k NARRATIVE ~

SUMMARY

OF-OPERATING EXPERIENCE

.. s-DOCKET NO..-50-263

-'i DATE 1-3-94 COMPLETED BY H.

H. Paustian.

TELEPHONE 612/295-5151

-MONTH DEC 4

12-1-93 6

to Power operation.

12-31-93 i

4

?

A i

i Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance. testing.

i l

l

t UNIT SHUIDOVNS AND POWER REDUCTIONS DOCKET No. 50-263 UNIT NAME Monticello DATE 1-03-94 COMPLETED BY 1. H. Paustiart REPORT MONI11 December TELEFBONE 612/295-5151 -

o No.

Date Duration Reason Method LER System Comp.

Cause & Corrective Ty(pe (hours)

(2) of No.

Code Code Action to 1)

Shutdown

-(4)

(5)

Prevent Recurrence (3)

None r

f 1

2 3

4 F: Forced Reason:

Method:

Draft IEEE Standard.

S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-DS)

B-Maintenance or Test

'2-Manual Scram C-Refueling 3-Automatic Scram 5

D-Regulator Restriction 4-Other (Explain)'

IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

-.a.

.a a

=

<e--ws-,t--

a--.

.<-..w-. -

-