l-Northem States Power Company 414 Nicollet Mall Minneapohs, Minnesota 55401-1927 Telephone (612) 330-5500 January 12, 1994 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn
- Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report December, 1993 Attached is the Monthly Operating Report for December, 1993 for the_Monticello Nuclear Generating Plant.
l ff f f ' 4W Roger O Anderson Director Licensing and Management Issues Director, Office of Resource Management c:
Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment I
/
I l
((' \\
.150003 9401140237 931231 PDR ADDCK 05000263
- v. ;
R PDR k
OPERATING DATA REPORT-
[
DOCKET NO.
50-263 DATE 1-3-94 COMPLETED BY H.
H.
Paustian l
TELEPHONE 612/295-5151-OPERATING STATUS
] Notes
-]
- 1. Unit Name :
Monticello
]
]
1
- 2. Reporting period:
December
]
.] _
- 3.. Licensed Thermal Power (MWt):
1670
]
-]
- 4. Nameplate Rating (Gross MWe) :
569
]
]
4 5.
Design Electrical Rating (Net MWe):
545.4' -]
]
j
'6. Maximum Dependable Capacity (Gross MWe): __564
]
]
- 7. Maximum Dependable Capacity (Net MWe):
536
')
]
8.
If Changes Occur in Capacity Ratings (Items Number 3 -Through 7) Since Last' j
Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A l
i THIS MONTH YR.-TO-DATE CUMULATIVE'
- 11. Hours In Reporting Period 744 8760 197281
- 12. Number Of. Hours Reactor Was Critical 744.0 7391.0 159375.7 l'
.13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours-Generator On-Line 744.0.
7324.5 156600.7 15., Unit Reserve Shutdown Hours-0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1241429 11871367 241264780
- 17. Gross Electrical Energy Generated (MNH) 421187 4023863 81554663
'18. Net Electrical Energy Generated (MWH) 406279 3862906-78018793
- 19. Unit Service Factor 100.0%
83.6%
79.4%.
'20. Unit Availability Factor 100.0%
.83.6%
79.4%
-i
- 21. Unit Capacity Factor (Using MDC Net) 101.9%-
.82.3%
73.8%-
- 22. Unit Capacity Factor (Using DER Net)
.100~.1%
80.9%
72.5%
L23. Unit Forced Outage Rate-0.0%.
1.5%-
3.6%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each) 1
- Refueling Outage - 9/15/94 - 39 days
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A f
- 26. Units In Test Status (Prior-to Commercial Operation) : N/A Forecast Achieved j
INITIAL CRITICALITY
^
INITIAL ELECTRICITY COMMERCIAL OPERATION l
i
?
')
h a
v ve
t 4.
AVERAGE DAILY. UNIT POWER ~ LEVEL-DOCKET NO.
50-263 UNIT-Monticello-DATE 1-3-94-.
COMPLETED BY. H; H.
Paustian
~
TELEPHONE 612/295-5151 1
MONTH OF December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(MWe-Net)
(MWe-Net) 1 547.
17 546.
2 543.
18 548.
3 543.
19 545.
4
- 548, 20 547.
5 545.
21 548.
6 546.
22 548.
j t
7 545.
23 548.
8 549'.
24 549.
9 541.
25 546.
10 544.
26 550.
l 11 544.
27 548.12-545.
28 547.
13 544.
29
- 547, 14 544.
30 548.
15 542.
31 548.
16 546.
i INSTRUCTIONS On this-format, list the average daily unit power level in MWe-Net for each.
~ day in the reporting month.
Compute to the nearest whole megawatt.
y
k NARRATIVE ~
SUMMARY
OF-OPERATING EXPERIENCE
.. s-DOCKET NO..-50-263
-'i DATE 1-3-94 COMPLETED BY H.
H. Paustian.
TELEPHONE 612/295-5151
-MONTH DEC 4
12-1-93 6
to Power operation.
12-31-93 i
4
?
A i
i Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance. testing.
i l
l
t UNIT SHUIDOVNS AND POWER REDUCTIONS DOCKET No. 50-263 UNIT NAME Monticello DATE 1-03-94 COMPLETED BY 1. H. Paustiart REPORT MONI11 December TELEFBONE 612/295-5151 -
o No.
Date Duration Reason Method LER System Comp.
Cause & Corrective Ty(pe (hours)
(2) of No.
Code Code Action to 1)
Shutdown
-(4)
(5)
Prevent Recurrence (3)
None r
f 1
2 3
4 F: Forced Reason:
Method:
Draft IEEE Standard.
S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-DS)
B-Maintenance or Test
'2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)'
IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)