ML20059F756
| ML20059F756 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/10/1994 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Link R WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 9401140140 | |
| Download: ML20059F756 (2) | |
Text
.
January 10, 1994 Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN: Mr. R. E. Link Vice-President - Nuclear Power 231 West Michigan Street - P379 Milwaukee, WI 53201 i
Dear Mr. Link I am writing to inform you that your request for a reduced scope systems based instrumentation and control inspection, in accordance with NRC Inspection Procedure 40501 " Licensee Self-Assessments Related to Area-of-Emphasis Inspections," is granted. The option of permitting licensees to conduct a
~'
self-assessment in lieu of being subjected to an NRC conducted area-of-emphasis inspection is a pilot effort being implemented by the NRC to minimize regulatory impact and more efficiently utilize NRC resources.
Our determination that reduced effort is appropriate was primarily based on your letter dated November 9, 1993, and the additional information regarding your self-assessment provided during the meeting held in RIII on December 16, 1993. The information provided regarding the schedule, scope, and team qualifications for the self-assessment meet the guidelines contained in NRC Inspection Procedure 40501. Our determination also took into consideration your performance during prior major inspections (including area-of-emphasis inspections), periodic Point Beach plant performance reviews, and previous SALP ratings.
The reduced systems based instrumentation and control inspection will include in-process and final inspections following the guidance contained in Inspection Procedure 40501.
If you have any questions regarding this letter, please contact Mr. G. Wright at (708) 829-9731.
Sincerely, Original Signed By Geoffrey E. Grant, Director Division of Reactor Safety See Attached Distribution h~.
4 RIII Y '1Vrig k)
%f Mb il 1 RIII R FIIT,.
III RIII f)(),,
A g
T6ngue Greger Fo ey rt utter 01/(3/94 1/(./94 01/6/94 01/6 /94 0/
94
/94 0
g i
9401140140 940110 4
PDR ADOCK 05000266 G
PDR i
l
~
Wisconsin Electric Power Company.
2 January 10, 1994 cc G. J. Maxfield, Plant Manager l
OC/LFDCB i
Resident Inspector, RIII-Virgil Kanable, Chief l
Boiler Section Cheryl L. Parrino, Chairman Wisconsin Public Service l
t Commission
-State Liaison Officer A. G. Hansen, NRR/PDIII-3 D. P. Norkin, NRR/RSIB bcc: PUBLIC i
i I
P i
1 i
l l
l
,