g
}
-e
.
DEC 2 91993
,
Docket No. 50-271
,
Mr. Donald A. Reid
Vice President, Operations
Vermont Yankee Nuclear Power Corporation
l
RD 5, Box 169
Ferry Road
'
Brattleboro, Vermont 05301
Dear Mr. Reid:
,
SUBJECT: NRC INSPECTION REPORT NO. 50-271/93-16
This letter refers to the announced safety inspection conducted by Mr. J. Stewart and
Mr. M. Buckley of this office from October 11 - 15, 1993. The inspectors reviewed the
i
programs being implemented in response to NRC Generic Letter 89-10 " Safety-Related
!
Motor-Operated Valve Testing and Surveillance-." This generic letter and its supplements
!
provided guidelines to ensure motor-operated valves would be functional during design basis
accident conditions thereby protecting the health and safety of the public. At the conclusion
of the on-site inspection, the results were discussed with Mr. R. Wanczyk and others of your
staff. Additional information was obtained after the on-site inspection and the inspection
concluded on December 14, 1993, with a review of the status of the findings as detailed in
i
the report.
Our inspectors found your program for determining the design basis and verifying the
capability of motor-operated valves to be in accordance with the program commitments made
by your staff at a May 26,1993, presentation to the NRC We also observed a program for
!
controlling MOV switch settings and conducting maintenance on motor-operated valves that
assured safe operations of safety related valves.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
[
the enclosure will be placed in the NRC Public Document Room.
Sincerely,
w 2cwu wace ey y.,
Jacque Durr, Chief
,
Engineering Branch
Division of Reactor Safety
.
Enclosure: NRC Inspection Report No. 50-271/93-16
9401140037 931229
h
ADDCK 05000271.
/
.
G
'
1
/I )
130015
-
u
r
1
'
DEC 2 91993
,
,
,
Vermont Yankee Nuclear
2
Power Corporation
cc w/ encl:
R. Wanczyk, Plant Manager
J. Thayer, Vice President, Yankee Atomic Electric Company
L. Tremblay, Senior Licensing Engineer, Yankee Atomic Electric Company
J. Gilroy, Director, Vermont Public Interest Research Group, Inc.
D. Tefft, Administrator, Bureau of Radiologica'
. State of New Hampsh.re
Chief, Safety Unit, Office of the Attorney Ge .
.ommonwealth of Massach isetts
R. Gad, Esquire
G. Bisbee, Esquire
R. Sedano, Vermont Department of Public Service
T. Rapone, Massachusetts Executive Office of Public Safety
Public Document Fioom (PDR)
local Public Document Room (LPDR)
-
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
'
State of New Hampshire, SLO Designee
State of Vermont, SLO Designee
Commonwealth of Massachusetts, SLO Designee
,
!
,
P
t
f
k_
_
-
-
.
-
--
_.
DEC 2 9 l993
~'
.
Vermont Yankee Nuclear
3
Power Corporation
bec w/ encl:
Region I Docket Room (with concurrences)
E. Kelly, DRP
J. Shedlosky, DRP
bec w/enci (VIA E-MAIL):
W. Dean, OEDO
D. Dorman, NRR
W. Butler, NRR
C. Casto NRR
J. Jacobson NRR
T. Westeman NRR
W. Ang NRR
T. Scarbrough NRR
RI:DRS
RI:DRS -
Rl': AS
RI:DRS
""
A[
d
$71
I
12/l /93
12/r//93
12/lo/93
12/p/9'
OFFICIAL RFf0RD COPY
A:VY9316. INS