[e navy'g 8 UNiiED STATES i
["
g NUCLEAR REGULATORY COMMISSION
~
-i r,
ay WASHINGTON, D. C. 20555 October 12, 1993 Project No. 672 Mr. Peter M. Williams HTGR Division Office of Advanced Reactor Programs U.S. Department of Energy, NE-451 Washington, DC 20585
Dear Mr. Williams:
SUBJECT:
TECHNICAL REVIEW REQUESTED OF NUCLEAR REGULATORY COMMISSION (NRC)
CONTRACTOR REPORT 2-10-93 ON THE MODULAR HIGH TEMPERATURE GAS-COOLED-REACTOR (MHTGR) DESIGN Enclosed is the non-Applied Technology version of Technical Evaluation Report (TER) 2-10-93, " Review and Evaluation of Recent Publications Bearing on the Fuels Sections of the Draft MHTGR PSER," on the discussion of the fuel in Sections 4.1 and 4.2 of NUREG-1338, " Draft Preapplication Safety Evaluation Report [PSER] for the Modular High-Temperature Gas-Cooled Reactor," dated March 1989. This TER was developed for the Nuclear Regulatory Commission (NRC) by a contractor.
The original TER was classified " Applied Technology" because ~it was. based on documents that the Department of Energy (DOE) has classified " Applied Technology." DOE has stated that " Applied Technology" information on the MHTGR design must be kept from the public at this time.
i In our letter of July 23, 1993, we requested that you identify the portions of the original TER that contained " Applied Technology" information and you responded in your letter of August 26, 1993. 'The enclosed non-Applied Technology report is the original TER minus the identified " Applied Technology" information. A page in the enclosed TER explains this fact and how to identify where this information was removed from the original report.
This non-Applied Technology version of TER 2-10-93 will now be placed, with this letter, in the public document room.
You are now requested to provide comments on the technical discussions and conclusions of the original report.
This includes comments on the " Applied Technology" information in the original report. We are not providing you a copy of the original report at this time because you were provided with such a copy in our letter of July 23, 1993.
You are also requested to provide your comments within 75 days of receipt of this letter and have your comments placed into one of two categories:
(1) comments on the " Applied Technology" information and (2) comments on the non-Applied Technology information.
This schedule will allow us to incor-porate your comments into our preapplication safety evaluation report on the design.
180R9P
.%j e 674 p J
sLyn me swgn kwpr m umaa rr g10 6 931012
(
f 672 A PDR
RG ' -
}
{
(j
- l ?
)
k :[
Mr.-Peter M. Williams October 12, 1993
)
J j
This-reporting requirement affects nine or fewer respondents and, therefore, is not' subject to.0ffice of Management and Budget-review under P.L.96-511.
If you have any questions regarding this request,< please. contact me.at-(301) 504-3128.
Sincerely, w
- r. Project Manager' l
Advanced Reactors Project Directorate lAssociate Directorate for Advanced Reactors and License Renewal j
Cffice of Nuclear Reactor Regulation a
Enclosure:
Non-Applied Technology TER 2-10-93 cc w/ enclosure:
See next page
-l 3
Dinributip_n:
gCentralf file"w 1
PDR' ~ """ "
ll PDAR R/F 1
MHTGR R/F DCrutchfield WTravers EThrom JDonohew PShea 0GC 15/B/18 ACRS(10)
P-315 LShotkin NLN-353 FEltawila NLN-344 LA:PDAR:ADk PM:Phhh')AR PD:PDAR:ADAR_
PShea
'JN t
.sa EDThrom
[
k N
93' 9 Ib93
,; r.
1-'.
F
~
3,
) '
' OFFICIAL RECORD COPY '
Document Name: MHTGTER2.RAI
[
4 4
~4 4
g e
1 !
I Mr. Peter M. Williams
- October 12, 1993 MHTGR Project No. 672 cc:
J. David Nulton, Associate Deputy George C. Bramblett, Director Assistant Secretary for Reactor MHTGR-NE Project Division Systems, Development, and Technology General Atomics U.S. Department of Energy, NE-40 P.O. Box 85608 Washington, D.C.
20545 San Diego, California 92186-9784 E.C. Brolin, Acting Director Dave A. Dilling Office of Nuclear Energy, NE-1 Bechtel National, Inc.
U.S. Department of Energy 50 Beale Street Washington, D.C.
20585 P.O. Box 193965 San Francisco, California 94119 Jerry D. Griffith, Director Walter J. Parker Office of Advanceo Reactor Programs Stone and Webster Engineering U.S. Department of Energy, NE-45 Corporation Washington, D.C.
20545 245 Summer Street Boston, Massachusetts 02107 Sterling Franks Technical Director Office of MHTGR Sten Caspersson New Production Reactor Program Combustion Engineering U.S. Department of Energy, NP-61 100 Prospect Hill Road Washington, D.C.
20545 Windsor, Connecticut 06095 i
Salma El-Safwany Phil Rittenhouse ll.S. Department of Energy Oak Ridge National Laboratory San Francisco Operations Office P.O. Box 6138 1301 Clay Street Building 4500S Oakland, California 94612-5208 Oak Ridge, Tennessee 37831-6138 Dr. Daniel L. Hears Steve Goldberg Gas-Cooled Reactor Associates Budget Examiner 10240 Sorrento Valley Road, Suite 300 Office of Management and Budget San Diego, California 92121-1605 725 17th Street, NW Washington, D.C.
20503 Lloyd Walker Marguerite Kingston Modular HTGR Plant Design Office of Science and Technology Control Office - West OE08 P.O. Box 85608 Washington, D.C.
20500 San Diego, California 92186-9784 Ray R. Mills Modular HTGR Plant Design Control Office - East 3226 Tower Oaks Boulevard Suite 300 Rockville, Maryland 20852