ML20059F379

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1993 for Millstone Nuclear Power Station Unit 3
ML20059F379
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/31/1993
From: Doboe L, Miller D
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-94-12, NUDOCS 9401130314
Download: ML20059F379 (5)


Text

. _ . . . .. . _ ._. . _ .

, EAST UTILITIES o nera cues . semen sueet Bernn. Connecucu f )d2NUd [.$[$[$2U

+. . . w w ,

  • e .. o O. BOX 270 n.~ ~.

f4 ART FORD. CONNECTICUT 06141-0270 k k J ((.2 [N.[l,[72. (203) 665-5000

  • IX)NALD H LULLER. A FINKW 31CffI' RESIDE %7. Anil. STONE Re: 10CFR50.71(a)

January 10, 1993 MP-94-12 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Reference- Facility Operating License No. NPF-49 Docket No. 50-423

Dear Sir:

In accordance with reponing requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Repod 94-1 covering operation for the month of December 1993 is hereby forwarded.

Very truly yours, NORTHEAST NUCLEAR ENERG OMP NY

/

Donald B. Miller Jr.

Senior Vice President, Millstone Station - NNECO Attachment cc: T. T. Martin, Region I Administrator P. D. Swetland, Senior Resident inspector, Millstone Unit Nos.1,2 & 3 V. L. Rooney, NRC Project Manager, Millstone Unit No. 3 os34u arv 4 se 9401130314 931231 PDR ADOCK 05000423 Il N PDR  ; -

I l

              • NRC OPERATING STATUS REPORT COMPLETED BY REACTDR ENGINEERING *******

l

1. DOCKET.... 50-423 OPERATING STATUS l
2. REPORTING PERl00... DECEMBER 1993 OUTAGE + ONLINE HOURS... 0.0 + 744.0 = 744.0
3. UTILITY CONTACT.................L. C. Doboe 203 4471791 x 6076 eeee** eeeeee
4. L I CE NSED T HE R MAL P0WE R . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3411
  • MILLSTONE *
5. N AME PLAT E R AT I NG ( GR OSS MWE ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,253 MW
  • DNIT 3 *
6. DEllCN E L ECTR I CAL RAT I NG ( NET MWE ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,153.6 *************
7. MAX I MUM DEPENDA8LE CAPACI TY ( GROSS MWE ) . . . . . . . . . . . . . . . . . . . . . . . . 1,184 2
8. MAX I MUM DEPENDABLE CAPACI T Y (hE T MWE ) . . . . . . . . . . . . . . . . . . . . . . . . . . 1,137.0 9 IF CHAEGES DCCUR ABOVE SINCE LASY REPORT, RE ASONS ARE. .. . .......

N/A

10. POWE R LEVE L TO kH I CH REST R ICTED , I F ANY (NE T MWE ) . . . . . . . . . . . . . . .N/A
11. REASON FOR RESTRICTION, IF ANY....N/A MONTH YEAR TO DATE Cu4ULATIVE TO DATE

===== ............ sum.........ssses.

12. HOURS IN REPORTING PERIDO 744.0 8,760.0 67,440.0
13. NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 6,275.e 49,313.9
14. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 6,466.5
15. HOURS GENERATOR ONLINE 744.0 6,106.6 48,237.6
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
17. GROSS THERMAL ENERGY GENERATED (MWH) 2,4 B0,277.0 20,094,807.5 157,285,106.1
18. GROSS ELECTRICAL ENERGY GENERATED (MWH) 859,795.5 6,849,406.5 54,167,645.1
19. NET ELECTRICAL ENERGY GENERATED (MWH) 824,969.4 6,479,338.4 51,466,605.7
20. UNIT SERVICE FACTOR 100.0 69.7 71.5 ,
21. UNIT AVAILA81LITY FACTOR 100.0 69.7 71.5
22. UNIT CAPACITY FACTOR (US!kG MDC NET) 97.5 65.1 67.0
23. UNIT CAPACITY FACTOR (USING DER NET) 96.1 64.1 66.2 24, UNIT FORCED OUTAGE RATE 0.0 4.3 17.2
25. UNIT FORCED OUTAGE HOURS 0.0 2 72.5 10,004.9 J

S HUTDOWH S SCHEDUL ED DVE R NE X T S I X MON T H S ( T YPE , D AT E , AND DURAT I ON OF E ACH ) . . . . . . . . . . . . . .

N/A l

IF CURREhTLY SHUTDOWN, ESilMATED STARTUP DATE......N/A l I

)

i

. .- ~. . . . . _ . , - - .

- AVER A G E D AILY UNIT POWER LEVE L DOCKET NO: 50-423 UNIT: MLLLSTONE UNIT 3 DATE: lanygrv 5.1994 COMPLETED BY: L. C. Doboe 203-447-1791 x 6076 MONTH P_ccember 1993 1

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL .

(MWE-NET) (MVE-NET) 1 798 16 1104 2 1110 17 1127 3 1086 18 1137 4 1083 19 1138 5 1132 20 1137 6 1138 21 1026 7 1130 22 1001 8 1111 -23 1133 9 1132 24 1138 10 1137 25 1139 11 1134 26 1137 12 1072 27 1137 13 1138 28 1136 14 1135 29 1137 15 1130 30 1140 31 1139

- w- m . -, -. y c.,---- , e .. + - , . , - --

t i

U N I T S II U T D O W N S A N D P O W E R RE D U CTIO N S ,

DOCKET NO: 50-423 UNIT: MILLSTONE UNIT 3 DATE: January 5.1994 *

[ COMPLETED BY: L. C. Doboe TELEPHONE: 203-447-1791 x 6076 i

i Number Date Type Duration Reason Method of Licensee System Component Cause and Correctist Action to Prornt (1) (Hours) (2) Shutting Event Report Code Code Rcuuw Down the Number (4) (5)

Reactor j (3)

None 1

1 1; Tvt'e: 2.; Reasons: 1; Method 4: IEEE Standard 805-1984 F: Forced A Equipment Failure (Explain) 1 Manual S: Scheduled B Maintenance or Test 2 Manual Scram 5: IEEE Standard 803A-1983 C Refueling 3 Automatic Scram D Regulatory Restriction 4 Continued from Proious Month E Operator Training & License 5 Power Reduction Exam (Duration = 0)

F Administrative 9 Other(Explain)

G Operational Error (Explain)

H Other

R E FUE LING INFO R M A TION R EO U EST December 1993

1. Name of facility: Millstone 3.
2. Scheduled date for next refueling shutdown: Mav. 27.1995
3. Scheduled date for restart following refueling: August 10.1995
4. Will refuelir.g or resumption of operation thereafter require a technical specification change or other license amendments?

En

5. Scheduled date for submitting licensing action and supporting information.

NM

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design of performance analysis methods, significant changes in fuel design, new operating procedures:

Nnne

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a): 193 (b): 332

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present size - 756.

No increase _mqRestei

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

End ofcyclei l

l l

i