Mod 1,revising Time Frame for Delivery & Installation of ADP Equipment to within 90 Days of Contract Award,To Technical & Administrative Support in Moscow for Russian Priority Number 3 (Incident Response)(Lisbon Initiative)
ML20059F028
Person / Time
Issue date: 09/28/1993
From: Mattia M, Rodehau T
NRC OFFICE OF ADMINISTRATION (ADM), SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
To:
References
CON-NRC-26-93-297 NUDOCS 9311040092
Download: ML20059F028 (2)


Text

_

i a.cenAcT so cooc AMEf4DMENT OF SOLICITATION / MODIFICATION OF CONTRACT

,cc,

3c

=

4. ng.outssTeonruacNAsc aco.No.

s.r acaccr e pf g

cTeve ic L eucnoutu r/ woo &4caison teo.

s.cy/ Q 8 '

7.^ousNtsTenco et 01emer men item 6, l

'f,

T RFPA No. AED-93-29) dtd 8/25/93 Ono (1)

Ts. sssuto snY j

U.S. Nuclear Regulatory Commission Division of Contracts & Property Management, P-902 g{

Washington, DC 20555 o eA.,.m_, tam _

xe _

<s,0, m..

Science' Applications International Corporatiorr-20201 Century Boulevard, 3rd Floor Germantown, MD 20874 acA.geeCAnON ov comaAcif0ROea Pr-fw 4nal Investigator /Technf<n1

.NRC-26-93-297 Ced:" Mathow Ranm-tos C AT m sssa m at ass

~

  • E1--F w No. (301)' 3s3-01 so 7/14/93 lFActurycoos 11.THtS (TEM ONLY APPt.lESTO ?F8:NDMENTSOFSOUCITATIONS coca b I.

O

.et.s.

' I.: I the abow sudead sosdcasson k emendar.as set forth Is itesm14.The Biowanddote spectned fer escalp 1 pdor em the hourand dete specIGod In the soGdandoneras seiended.tgr one of the esaded.

i

- ~ '

-~dae of the amendmenc (bl By admonbdging receiptof this *en eedhenorof the ener offens smnet actmembose esoelpeof shls :

SAGE 1088 HGCCfVED ATTHE PLACE DESIGNATED FOft1NE REC esaWednedomsaand15.sadretanino YftGEULT

= hee =#==*eheeseeserbeneedstqredeemsmer

$N RIWGCDON OF YOUR OfVER. If by Wose of this samaarlammat you dealm to thenes en offor orter es the speeles heerand dose spedned.

seteer preddedeerAtehromersecserenekses.temnostothesolichososandthisamendment.endis la.accouetrit4G ANO N *Pf40PRAATtON DATA g(seG.JJ N/A 13.TH A 'EM APPLIES ONLY TO MOOtFICATIONS OF CONTRACT 3DRDtMS, tT t.a 9tFIESTHE CONTRAQ/ ORDER NO. AS DESCRIBED IN ITEM 14.

g, A. THis CHANGL OROCR 45155UE0 PU ASUANT TOs ge.-hf.meeriOJ TNE Cit"MES SET FoRTH 4 T RACT ORDER NO.eH ET1.M 10A.

d t,'. ed75ct, S.THE A90VE PtUtaeCRFO CONTRACT /OROCR ts SAOOffrtED TO REFtEerTHE AousNtSTRAT1VE C

, _ 2 : dear.eseJ bcv roRTH ere aTEs414.PUR$UANT TO THC AUTHOR *TY oF FAR 43.1o3(16 C.THt$ SUPet.LMENTA4. AGREEuENT 4$ ENTERED 4NTO PURbOANT TO AurpoR4TV oFe

o. oi nen ssr<eur erra er motuumaan ant =secura l

X Mutual agreement of the carties 2

copiesto theissuingoffice.

O is requimd to sign this document ord retum I

E.IMPORTANT: Contractor is not,

-^."souciasd--MestrweteuWest ana# der.J vg "-1*J 14.OC5ChWisON OF AMEttOMENTMootf 6 CAT 60N (Org-M ey UCF; --

_"~'2-an_

1 i

SEE NEXT PAGE b

py tt '

9311040092 93092g 1)U 1

PDR CONTR NRC-26-93-297 PDR pgJd:d herem, era terms and conditions of the doc ; at toforenced 6a it+rn 16A.HAME AND T 8TLE OF CONT RACT4NG of t'6CER (Type orprissO 16A.HAME ANO 141LE of 56GNER (Type orpdnu

/

Thomas J. Rodehau, Deputy Contracts Manager MaryJogtti p

MC.DATE 5sGNED 16 ecus 44T O DT l16C.DATgs4GNGD

'F ISc.COff t MACTO6VOf f LHOM lI E 9/28/93 0

.'.,.'.e., c

- ~,,

FANDAltD FORM So (Rcv.1043{

30105

Contract No. NRC-26-93-297 Modification No. One (1)

Page 2 of 2 The purpose of this modification is to revise the time frame for the delivery and installation of the ADP equipment purchased under this contract from "within 30 days after contract award" to "within 90 days after contract award." Accordingly, the contract is hereby modified as follows:

Subsection C.5 entitled " DELIVERY / INSTALLATION / TRAINING" is revised to read as follows:

"C.5 DELIVERY /USTALLATION/ TRAINING The Contracccr shall deliver, install, integrate, test, and train in the use of the system, GAN employees within 90 days after contract award."

All 'other terms and conditions of the contract remain the same, including the ceiling amount of $168,513.00.

l 1

A summary of obligations for this contract, from the award date through the date of this action is given below:

Total FY93 Obligation Amount:

$168,513.00 Cumulative Total 'ri NRC Obligations:

$168,513.00 This modification, does not obligate any FY93 funds.

  • Pursuant to discussions held between J. Himes, A. Hughes and SAIC (T. Rodehau) on September 28, 1993, it was agreed upon that the schedule for the delivery of the ADP equipment purchased under this contract is contingent upon the appropriate Russian authorities obtaining all necessary permits for the installation of such ADP equipment at the designated installation locations. Any delays experienced l

by the Russian authorities in obtairiing such permits shall constitute an excusable delay and the schedule for delivery and installation of the ordered ADP equipment shall be adjusted accordingly.

F of