| Site: | Grand Gulf |
| Issue date: | 10/26/1993 |
| From: | Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hutchinson C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20059E628 | List: |
| References | |
| NUDOCS 9311030280 | |
| Download: ML20059E624 (5) | |
See also: IR 05000416/1993301
Text
h:
i
.:
'
s
DCT 2 61993
i
,
Docket No. 50-416
.
'
License No. NPF-29
Entergy Operations, Inc.
ATTN:
C. R. Hutchinson, Vice President
Operations - Grand Gulf
P. O. Box 756
,.
Port Gibson, MS 39150
,/
'
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC EXAMINATION REPORT NO. 50-416/93-301)
This refers to the Nuclear Regulatory Commission (NRC) administered
examinations led by Jonathan H. Bartley during the period September 27 -
October 1, 1993. The examinations were administered to employees of your
company who had applied for licenses to operate the Grand Gulf Nuclear
Station. At the conclusion of the examination, the examinations and
preliminary findings were discussed with those members of your staff
identified in the NRC Examination Report, Enclosure 2.
A Simulator Facility Report is included in this report as Enclosure 3.
A copy
of the written examination questions and answer key, as noted in Enclosure 4,
was provided to members of your training staff at the conclusion of the
examination.
>
In February 1992, six candidates from your facility participated in the
Generic Fundamentals Examination. Of the six examined, five passed for an 83
percent pass rate.
In June 1993, five candidates from your facility
participated in thi Generic Fundamentals Examination. Of the five examined,
five passed for a ?.00 percent pass rate.
Based on the results of this inspection, certain of your activities appeared
to be in violatior, of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
In addition, the enclosed Examination Report identifies
activities that violated NRC requirements that will not be subject to
1
enforcement action because the licensee's efforts in identifying and/or
-
correcting the violation meet the criteria specified in Section VII.B of the
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your-
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
i
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
9311030280'931026
~
l
i
ADOCK 05000416
G
g
'
.
..
Entergy Operations, Inc.
2
DCT 2 61993
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
.
Should you have any questions concerning this examination, please contact us.
Sincerely,
ORIGINAL SIGNED BY T. A.PEEBLES
'
Thomas A. Peebles, Chief
Operations Branch
Division of Reactor Safety
Enclosures:
1.
2.
NRC Examination Report
3.
Simulator Facility Report
4.
Written Examination (s) and Answer
Key (s) (Document Control Desk Only)
cc w/encls 1, 2, and 3:
Mr. H. W. Keiser, Executive Vice
President and Chief Operating Officer
Entergy Operations, Inc.
P. O. Box 31995
Jackson, MS 39286-1995
D. L. Pace
General Manager
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P. O. Box 756
Port Gibson, MS 39150
M. J. Meisner, Director
Nuclear Safety and Regulatory Affairs
Entergy Operations, Inc.
P. O. Box 756
Port Gibson, MS 39150
cc w/encls cont'd:
(See page 3)
i
i
.
Entergy Operations, Inc.
3
OCT 2 61993
cc w/encls:
Mike Morre, Attorney General
Frank Spencer, Asst. Attorney General
State of Mississippi
P. O. Box 22947
Jackson, MS 39225
^
J. R. McGaha
Vice President, Operations Support
Entergy Operations, Inc.
P. O. Box 31995
Jackson, MS 39286-1995
R. B. McGehee, Esq.
Wise, Carter, Child,
and Caraway
y
P. O. Box 651
!
Jackson, MS 39205
N. S. Reynolds, Esq.
Winston & Strawn
i
1400 L Street, NW, 12th Floor
Washington, D. C.
20005-3502
!
F. E. Thompson, Jr., M.D.
,
State Health Officer
'
State Board of Health
P. O. Box 1700
l
Jackson, MS 39205
]
The Honorable William J. Guste, Jr.
Attorney General
Department of Justice
State of Louisiana
P. O. Box 94005
Baton Rouge, LA 70804-9005
l
Office of the Governor
State of Mississippi
Jackson, MS 39201
Sam Mabry, Chief
Hazardous Waste Division
Mississippi Department of
Environmental Quality
,
P. O. Box 10385
Jackson, MS 39209
1
cc w/encls cont'd:
(See page 4)
.
.
OCT 2 6 0393
Entergy Operations, Inc.
4
cc w/encls:
President
Clairborne County Board
of Supervisors
Port Gibson, MS 39150
K. G. Hess
Vice President
Bechtel Power Corporation
P. O. Box 2166
Houston, TX 77252-2166
W. W. Watson
Project Manager
Bechtel Power Corporation
P. O. Box 808
4600 W. Main
Russellville, AR
72801
Mr. Marion Dietrich
Training Manager
Grand Gulf Nuclear Station
P. O. Box 756
Waterloo Road
Port Gibson, MS 39150
bcc w/ encl:
P. O'Connor, NRR
W. Beckner, NRR
R. Gallo, NRR
F. Cantrell, DRP
A. Gibson, DRS
J. Jaudon, DRS
G. Hallstrom, DRS
L. Lawyer, DRS
J. Bartley, DRS
M. Morgan, PNL
R. Bernhard, Grand Gulf Senior
Resident Inspector
U.S. Nuclear Regulatory Commission
Route 2, Box 399
Port Gibson, MS 39150
bcc w/encls cont'd:
(See page 5)
<
..
'
.
Entergy Operations, Inc.
5
0CT 2 6'1993
bec w/encls. 1, 2, 3, and 4:
Document Control Desk
bcc w/o encls.:
IMS, Region 11
RII:DRS
RII:DRS
R ;I:
RII:DR
RII:DRP
RII:DRS
(/
%
(et fwd
Q h ;f.
,
JBart, ley:jb/sd
Llawfer
-
WRa 1
FCantrell
TPedbles
g(/93
10g/91
10/Zt/93
10/g/93
10/7A/93
10/4,p/93
O
Doc Name: G:\\la\\grandgul\\I30lrpt.jhb