Southern Nuclear Operating Company 4
Post Once Box 1295 B1mingham, Alabrna 35201 Tetephone (205) 868 5131 L
Southern Nudear Operating Company Dave Morey Vice President Farley Prc;ect the SOulhern electitC System October 29, 1993 Docket Nos: 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant Reply to a Notice of Violation NRC Inspretion Report Nos. 50-348/93-13 and 50-364/93-13 Gentlemen:
This letter responds to the violation 93-13-05 as cited in the subject NRC inspection report. The violation therein states:
10 CFR 50, Appendix B, Criterion XVI, " Corrective Actions," requires, in part, that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment and nonconformances are promptly identified and corrected. In the case of significant conditions adverse to quality, the measures estahlished shall assure that the cause of the condition is determined and corrective action taken to preclude repetition. The identification of the significant condition adverse to quality, the cause of the condition, and the corrective action taken shall be documented and reported to appropriate levels of management.
Contrary to the above, as of September 3,1993, measures had not been established assuring that the cause of conditions adverse to quality was determined and corrective action taken to preclude repetition in that the following instrumentation:
Q1P16FT3014BA, Containment Cooler Service Water Outlet Flow Loop on I
9/1/93
- QlP16FY3014AB, Containment Cooler Service Water Outlet Flow Loop on 3/11/92
- Q2P16FT3014AA, Containment Cooler Service Water Outlet Flow Loop on 3/10/92
- QlP16FY3014BB, Containment Cooler Service Water Outlet Flow Loop on 4/10/91 Q2P16FT3014BA, Containment Cooler Service Water Inlet Flow Loop on a
3/11/91
)
l 1
0201%
fD\\
\\
9311030243 931029 PDR ADOCK 05000348 G
i U. S. Nuclear Regulatory Commission Page 2 was found out of prescribed tolerances without establishing or documenting the cause of the condition nor taking corrective action to preclude repetition.
This is a Severity Level IV violation (Supplement I.D.3)
The Southern Nuclear Operating Company (SNC) response to this Notice of Violation (NOV)is provided in the Attachment.
Confirmation I affirm that the response is true and complete to the best of my knowledge, information and belief.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY j l ]hr*
Dave Morey DPH:sar NOV93-13. DOC Attachment cc: Mr. S. D. Ebneter Mr. T. A. Reed Mr. M. J. Morgan
~.
ATTACIIMENT Admission or Denial Violation 93-13-05 occurred as described in NRC Inspection Report 93-13.
Reason for Violation The reason for this violation was inadequate procedures in that there was no direction given for actions to be taken when the subject instruments were found in an out-of-tolerance condition.
Corrective Action Taken and Results Achieved All containment cooler inlet and outlet flow instrumentation (sixteen instruments total for both units) have been recalibrated.
Corrective Steps to Avoid Further Violations Procedural guidance will be enhanced or established as appropriate to identify and evaluate repetitive out-of-tolerance conditions on those components used to satisfy TS surveillance requirements and safety related components in the PM program. This procedural guidance will also provide criteria for determining the appropriate corrective action when these conditions are identified.
The containment cooler inlet and outlet flow instrumentation will be evaluated based on i
this guidance once developed.
Date of Full Compliance March 4,1994 l