ML20059E333
| ML20059E333 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/27/1993 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Yelverton J ENTERGY OPERATIONS, INC. |
| References | |
| NUDOCS 9311030170 | |
| Download: ML20059E333 (4) | |
Text
F UNITED ST ATES
[jv"to k NUCLEAR REGULATCRY COMMISSION vq
'] '
RE GION IV
[
611 RY AN PL AZA DRIVE, SUITE 400 g
AR LINGTON, T EX A5 760118064 g
.n j..."
27 Dockets:
50-313 50-368 Licenses: DPR-51 NPF-6 Entergy Operations, Inc.
ATTN:
J. W. Yelverton, Vice President Operations, Arkansas Nuclear One Route 3, Box 137G Russellville, Arkansas 72801
SUBJECT:
LICENSED OPERATOR EXAMINATIONS AT ARKANSAS NUCLEAR ONE, NRC INSPECTION REPORT NO. 50-313/94-01; 50-368/94-01 In a telephone conversation on October 22, 1993, between Mr. J. Pellet and Mr. B. Byford, arrangements were made for the administration of licensing examinations at Arkansas Nuclear One, Unit 1.
The examinations are scheduled for the week of February 28, 1994.
Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, " Operator i
Licensing Examiner Standards," (ES-201, Attachment 4) earlier that month.
To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201_by November 30, 1993.
Any delay.in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examinations being rescheduled.
The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021.
In order to. conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.
The NRC will prepare and-administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021.
In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above.
Your staff should retain the original-simulator performance data (e.g., system pressures, temperatures, and levels)-
generated during the dynamic operating tests until the examination results..are final.
9311030170 931027 ~'
N PDR ADOCK 05000313 f-r
-1 P
PDf?~
1
.I' 0
Entergy Operations, Inc..
2 ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.
Your staff should submit preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before' the first examination date so that the NRC will be able to-review the applications and the medical certifications and evaluate any requested waivers.
If the applications are not received at least 30 days before the examination date, a postponement may be necessary.
Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires October 31, 1995.
The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, copying, and mailing the required material.
Send comments regarding this burden estimate or any.
other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear _ Regulatory Commission, Washington, D.C.,
20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NE0B-3019, Office of Management and Budget, Washington, D.C., 20503.
Thank you for your cooperation in this matter. Mr. Byford has been advised of the policies and guidelines referenced in this letter.
If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. S. McCrory at (817)860-8265 or Mr. J. Pellet, Chief, Operations Section, at (817)860-8159.
Sincerely, 4
a e
. 40 ins, irector Division of Reactor Projects Attachments:
As stated cc w/ attachments:
Arkansas Nuclear One ATTN:
Bob Bement, Training Manager i
Route 3, Box 137G Russellville, Arkansas 72801
. Arkansas Nuclear One ATTN:
George King, Operations Training Superintendent Route 3, Box 137G Russellville, Arkansas 72801
Entergy Operations, Inc. bec w/ attachments to DMB (IE01) & (IE42) bcc w/ attachments distrib. by RIV:
J. L. Milhoan Resident Inspector Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RIV File Section Chief (DRP\\TSS)
Project Engineer (DRP/D)
S. McCrory T. Alexion, NRR S. McCrory Reading File J. Pellet i
l RIV:C/05:DRS I3S' AD:DRh 0:
lqJPellet:cs ,d as TGwy S olli V '[ l0/7)/93 /0 E}93 (0 /?gn 3 I/93' 93
T Entergy Operations, Inc. s bec w/atUchments to DMB.!(IE01)_.& (IE42) bec w/ attachments distrib. by RIV: J. L. Milhoan Resident Inspector Section Chief (DRP/D) Lisa Shea, RM/ALF, MS: MNBB 4503. HIS System DRSS-FIPS RIV File Section Chief (DRP\\TSS) Project Engineer (DRP/D) S. McCrory T. Alexion, NRR S. McCrory Reading File J. Pellet RIV:C/05:DRS RS AD:DRh D: JPellet:cs as TGwy n 5 olli (0/2,b/93 /> l'. '/93 (O/7/93' l W 93 020021}}