Discusses 931220 Telcon Between C Sisco & D Mcclellan Re Arrangements Made to Evaluate Licensed Operator Requalification Training Program at Facilities & Requests That Listed Matls Be Furnished to Prepare for Insp
ML20059D772
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/22/1993
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9401100069
Download: ML20059D772 (5)


Text

__

.. =.

y T

/

DEC 2 21993 Docket Nos. 50-277 i

50-278 i

Mr. D. M. Smith Senior Vice President-Nuclear Philadelphia Electric Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box 195 Wayne, PA 19087-0195 l

Dear Mr. Smith:

l

SUBJECT:

PEACH BOTI'OM REQUALIFICATION PROGRAM INSPECTION AND l

l INITIAL REACTOR OPERATOR LICENSING EXAMINATION (RETAKE)

{

l In a telephone conversation on December 20,1993, between Mr. C. Sisco of this office and -

l Mr. D. McClellan of your training department, arrangements were made to evaluate the licensed operator requalification training program at the Peach Bottom facilities. The NRC '

l will perform this evaluation based on inspection activities in a temporary or subsequent i'

inspection procedure, rather than an NRC-administered requalification _ examination. The inspection will be performed based on facility administered examinations' that are scheduled to start the week of March 7,1994. The specific on-site inspection will be performed during the week of March 7,1994.

In order to prepare for the inspection activities, you will need to furnish the followmg j

l materials.

l Sample Plan / Test Outline i

i l

Copies of exam materials to be administered during the inspection week l

l Mr. McClellan has agreed to provide these materials by February 21,1994. Your staff should assure appropriate measures are taken to preclude examination compromise when i

submitting these materials.

In addition, arrangements were made for the administration of a licensing examination of a Reactor Operator applicant to retake the simulator portion of the examination. The examination is scheduled during the same week at the inspection activities. To prepare the OFFICIAL RECORD COPY G:PB3794

)

070023 ry 9401100069 931222

/

I PDR ADOCK 05000277.

v -

G PDR r

t 1

Mr. D. M. Smith 2

DEC 2 21993 examination and meet the schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 1 of this letter. Any delay in receiving approved and indexed reference material or the submittal of inadequate or inco:nplete reference material may result in the examination being rescheduled. Mr. McClellan has agreed to provide these materials by February 7,1994.

The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above. Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

ES-301 and ES-302, Attachment I contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

Your staff should submit the preliminary Reactor Operator license application and waiver requests at least 30 days before the examination date so that the NRC will be able to review the application and the medical certification and evaluate any requested waivers. If the application is not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires October 31,1995. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, includes gathering, xeroxing, and mailing the required material. Send comments about this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.

OFFICIAL RECORD COPY G:PB3794

v Mr. D. M. Smith 3

DEC 2 21993 Thank you for your consideration in this matter. Mr. McClellan has been advised of the NRC guidelines and policies addressed in this letter. If you have any questions on the evaluation process, please contact me at (215) 337-5210.

Sincerely, Ari +.nl Signed iay.

RICHARD J. CONTE Richard J. Conte, Chief BWR Section Operations Branch Division of Reactor Safety

Attachment:

Reference Materials cc w/

Attachment:

J. Doering, Chairman, Nuclear Review Board G. Rainey, Vice President, Peach Bottom Atomic Power Station G. Cranston, General Manager, Nuclear Engineering Division C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

A. J. Wasong, Manager, Experience Assessment G. A. Hunger, Jr., Manager. icensing Section J. W. Durham, Sr., Senior \\ ce President and General Counsel G. Edwards, Plant Manager, Peach Bottom Atomic Power Station J. Stankiewicz, Training Superintendent D. McClellan, Operator Training Supervisor J. A. Isabella, Director, Generation Projects Department Atlantic Electric Co.

B. W. Gorman, Manager, External Affairs R. McLean, Radioecology & Environmental Impact Programs, Department of Natural Resources D. Poulsen, Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Pablic Service Commission of Maryland NRC Resident Inspector Commonwealth of Pennsylvania TMI-Alert (TMIA)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

OFFICIAL RECORD COPY G:PB3794

(.-

Mr. D. M. Smith 4

DEC 2 21993 bec w/

Attachment:

Region I Docket Room (w/ concurrences)

{

Master Exam File OL Facility File bec w/ Attachment (VIA E-MAIL):

W. Dean, OEDO Joseph Shea, NRR j

L. Nicholson,' Acting PDI-2, NRR i

t (NOTIFY VIA E-MAIL AND NO ATTACHED DOCUMENTS):

i L. Bettenhausen, DRS i

R. Conte, DRS i

C. Sisco, DRS l

i

.i i

I 1

i

)

RI:DRS RI:DRS Sisco dmg Cone

}

1 /20/93 12/2)93 OFFICIAL RECORD COPY G:PB3794

ATTACHMENT 1 REFERENCE MATERIALS i

1. Requalification Scenario Bank
2. Simulator Malfunction Book (Cause ad Effect)
3. Surveillance Test index
4. EOP, Off Normal, and Operational Transient procedures l

ATTACIIMENT 1

)

REFERENCE MATERIALS j

\\

1. Requalification Scenario Bank
2. Simulator Malfunction Book (Cause and Effect)
3. Surveillance Test index i
4. EOPs, Off Normal, and Operational Transient procedures 1

i i

I i

i 1

I i

l I