ML20059D744
| ML20059D744 | |
| Person / Time | |
|---|---|
| Issue date: | 09/30/1993 |
| From: | Fields J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | John Miller CAE-LINK CORP. |
| References | |
| CON-FIN-T-8471, CON-NRC-38-92-281 NUDOCS 9311020389 | |
| Download: ML20059D744 (3) | |
Text
09730/1993 69:5?
FPON C riE - L 1 H t: TNG OP5 TO 913014927617 P.et a
_. ST ja '93 09:56/t1 U 5 N.;iTMR QMTm
["*%
(
B UNITED STATES
/
NUCLEAR REGULATORY COMMIS$10N $
k
- es,*,/
wasmnaron, o.c. oss>.cooi y
v k
CAE-Link Corporation a
ATTN: Judy Hiller N
P.O. Box 1237 8
Binghamton, New York 13902-1237
Dear Ms. Miller:
Modification No. 2 to Task Order No. 4 entitled, "All Employee
Subject:
Training Survey" Under Contract No. NRC-38-92 281 The p(u pose of this modification is to (1) provide for a within scop and 2 Task 0 der No. 4 is modified in accordance with the attached Statement of Work and the contractor's proposal dated September 24,1993. The effective date of this task order modification shall be the date of this letter.
)
The cost ceiling of this task order is increased by $9,082.00 from $27,477.00 i
to $36,559,00. The total estimated reimbursable costs amount is increased by
$8,394.00 from $25,392.00 to $33,786.00 and the fixed fee is increased by
$688.00 from $2,085.00 to $2,773.00.
Accounting data for Modification No, to Task Order No. 4 is as follows:
APPN No.: 31X0200 BOC code: 2510 B&R No.:
384-20-616-271 Job Code: T8471 t
OBLIGATED AMOUNT:
$9,082.00 A summary of obligations for this task order, from award date through the date
{
of this action is given below:
Total Amount Obligated FY931 $36,559.00 4
~
Cumulative total of NRC 0b11gationst $36,559.00 This modification obligates FY 1993 funds in the amount of $9,082.00.
Issuance of this task order modification does not amend any terms or conditions of the subject contract.
Post-it' brand fax transmittat memo 7671 L f of d P
- )^1'." $, m lYTYW e-u PDR CONTR
&/p y6,/7 N' h$ly;r/5W N
9311020389 930930 NRC-36-92-281 PDR r
h
09/30/1993 09 58 FRON CAEeLINK THG OPS TO 913010927617 P.02
- 4 NRC-38-92-281.
Task Order No. 4 Nodification No.1 Page 2 of 2 Your contacts during the course of this task order are:
Technical Matters:
Carolyn Bassin Project Officer (301) 492-8526 p
Contractual Matters:
Rosemary Mann Contract Administrator (301) 492-4416 Please indicate your acceptance of Modification No. 2 to Task Order No. 4 by having an official, authorized to bind your organization, execute three copies of this document in the space provided end return two copies to the contract administrator. You should retain the third copy for your records.
Contract Administrator, on (garding this matter, please contact RoscMary Mann If you have any questions re 301) 492-4416.
Sincerely, 4
J c A. Fields, Contracting Officer Contract Administration Branch No. 3 Division of Contracts and Property Management Office of Administration ACCEPTE0;.
(An ~
w NAME 7so-%
DATE 9
L eteeeWeeeeeeeeeeeeeeeeeeeeeeeeeeeggemememeeeeeee***eme***gemeeeeeeeeeeego....
eeggae,,,,,,,,gg,,,,,,,,,,
y
"' 9 i m 4 9 m i 7
,y.e3
" @ 33*I f '33:;7!M,3 P5 M ] L j"3g25),c tss, 9
C Statement of Work The NRC requires an additional analysis of data 'from the' NRC employee training NRC requests that a crosstab analysis of the 15 survey under Task 4.
demographic issues, specifled by NRC, and all 131 question Provide as an appendix, a comparison of HRC and OPM responses sumarized.
Two copics of the crosstab computer printouts (percentages) to each question.
and a report of the results shall be delivered to NRC for review on or before The NRC will review and coment on the deliverable to 30, 1993.
CAE-Link who will make relevant changes to the report requested by NRC.
September The deliverfoie shall include two draft and two f(nal copies of theInformat{
docureentatfon bound in a 3-ring binder.
orrtnized by qu_estions with one question per psge for es referente.
Compute'f runs.
All de'iverabics shall be made to Mary Louis Roe, Woodmont Building, B MD.
4
- w. -
A 4
e e
i e
1
\\
\\
l
.