ML20059D668
| ML20059D668 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 12/22/1993 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20059D671 | List: |
| References | |
| NUDOCS 9401100033 | |
| Download: ML20059D668 (3) | |
See also: IR 05000277/1993028
Text
-
-.
.
- --
-.
-
i-T
'l
DEC 2 21993
j
'
s
Docket Nos. 50-277
l
50-278
i
l
Mr. D. M. Smith
Senior Vice President-Nuclear
'
Philadelphia Electric Company
Nuclear Group Headquarters
.
Correspondence Control Desk
P. O. Box 195
Wayne, Pennsylvania 19087-0195
Dear Mr. Smith:
l
SUBJECT: COMBINED INSPECTION REPORT NOS. 50-277/93-28 AND'50-278/93-28
i
This letter refers to the announced engineering inspection conducted by Mr. Harold Gregg on
l
November 15 - 19, 1993, at the Peach Bottom Atomic Power Station, Units 2 and 3, Delta,
Pennsylvania. Mr. Gregg discussed the results of the inspection with Mr. A. Wasong and
j
others of your staff at the conclusion of the inspection.
!
>
This inspection was performed to review your activities related to reactor coolant main steam
safety and safety / relief valves. These valves have important safety functions in protecting the
!
health and safety of the public. Within the scope of this inspection, your program activities
l
l
were found to be effective and in accordance with NRC regulations.
i
No reply to this letter is necessary, and your cooperation with us is appreciated.
i
Sincerely,
c; w. 1 s,m a nt,
m. wye map
%/ Jacque P. Durr, Chief
l
Engineering Branch
!
Division of Reactor Safety
i
1
l
Enclosure: Inspection Report Nos. 50-277/93-28 and 50-278/93-28
i
i
070027
9401100033 931222
ADOCK 05000277
gi
G
-
l
,
.
.
-
. . .
-
-
-
-
-. .,.:
(
DEC 2 21993
Philadelphia Electric Company
2
cc w/ encl:
J. Doering, Chairman, Nuclear Review Board
G. Rainey, Vice President, Peach Bottom Atomic Power Station
G. Cranston, General Manager, Nuclear Engineering Division
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
G. Edwards, Plant Manager, Peach Bottom Atomic Power Station
A. J. Wasong, Manager, Experience Assessment
G. A. Hunger, Jr., Manager, Licensing Section
J. W. Durham, Sr., Senior Vice President and General Counsel
J. A. Isabella, Director, Generation Projects Department,
Atlantic Electric
B. W. Gorman, Manager, External Affairs
R. McLean, Power Plant Siting, Nuclear Evaluations
D. Poulsen, Secretary of Harford County Council
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
!
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2) Inspection Reports
NRC Resident Inspector
Commonwealth of Pennsylvania
TMI - Alert (TMIA)
I
l
!
l
l
_-_
___- _.
.
.
DEC 2 21993
Philadelphia Electric Company
3
,
j
bec w/ encl:
l
Region I Docket Room (with concurrences)
i
bec w/ encl: (Via E-Mail)
W. Dean, OEDO
Joseph Shea, NRR
L. Nicholson, Acting PDI-2, NRR
F. Cherny, RES
G. Hammer, NRR
M. Wegner, AEOD
!
l
l
l
RI:DRS
I.
S
RI:DRS
Durr$ (Y
!
G
Ea n
'{\\
'
-
p
12
3
12/p/93
12@/93 /
OFFICIAL RECORD COPY
A:PB9328. INS