ML20059D524
Jump to navigation
Jump to search
| ML20059D524 | |
| Person / Time | |
|---|---|
| Site: | Claiborne |
| Issue date: | 12/23/1993 |
| From: | Peters J, Peters M AFFILIATION NOT ASSIGNED |
| To: | NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| NUDOCS 9401070346 | |
| Download: ML20059D524 (1) | |
Text
w--
- 76a3oyo
' December 23, 1993 Chief, Enrichment Branch Division of Fuel Cycle Safety and Safeguards Office'of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C.
20555
~.
Dear Sir:
It has been brought to my attention that only'45 days are allowed for responce to the DEIS.
The period will expire January 16, 1994.
This does not allow time to receive the report,. study.
it and then respond;. particularly with the Christmas season coming during the 45 days.
At'this time the only proper and correct. thing to de-is a 90 DAY EXTENSTON TO THE RESPONSE PERIOD.
Best Wishes, i
// $+
W e
John and Martha Peters Rt. 4, Box 310 Homer, Louisiana 71040 060140 h,}I b~
9401070346 931223 y
PDR ADDCK 07003070 C
PDR i