Forwards Insp Rept 50-155/93-13 on 930828-1019.Enforcement Conference Held Re Loss of Control Over Two Plant Evolutions
ML20059D156
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/22/1993
From: Phillips M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Donnelly P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20059D160 List:
References
NUDOCS 9311020149
Download: ML20059D156 (3)


See also: IR 05000155/1993013

Text

r

.%

e

,

[(ja stooq'o,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

.,,

'

//'

,o

REGION lli

k

J ;[E

?

799 ROOSEVELT ROAD

GLEN ELLYP, ILLINOIS 60137-5927

%,**u o

OCT 2 21993

Docket No. 50-155

Consumers Power Company

ATTN:

P.M. Donnelly

,

Plant Manager

Big Rock Point Nuclear Plant

10269 US 31 North

Charlevoix, MI 49720

'

Dear Mr. Donnelly:

This refers to the routine safety inspection conducted by Messrs. R. Leemon,

C. Brown, and R. Twigg of this office from August 28 through October 19, 1993.

The inspection included a review of activities at the Big Rock Point Nuclear

facility authorized by NRC Operating License No. OPR-6. - At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, observations, interviews with personnel, and

'

discussions related to a forced power reduction when the reactor feedwater

pump tripped due to personnel error.

No violations of NRC requirements were identified during the course of this

inspection.

However, during this period, an Enforcement Conference was held

with the licensee relating to the loss of control over two plant evolutions;

+

.ne involving the hydrostatic primary system test and the other a breach of

containment integrity with a concurrent mode change.

These issues were

discussed at the Enforcement Conference and are included in special inspection

report Nos. (50-155/93014 and 50-155/93015(DRP)).

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

[

010007

9311020149 931022

PDR

ADDCK 05000155

G

PDR

,

st'

6

o

00T 2 2 tm

p

b'

\\\\ d

Consumers Power Company

-2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Or!'jnr.J cb rd by

B. L Jer

m

  • -

M. P. Phillips, Chief

Reactor Projects Section 2B

Enclosure:

Inspection Report

No. 50-155/93013(DRP)

.

Distribution:

cc w/ enclosure:

David P. Hoffman, Vice President

Nuclear Operations

DC/LFDCB

Resident Inspector, RIII

James R. Padgett, Michigan Public

Service Commissior

Michigan Department of

Public Health

Big Rock Point, LPM, NRR

SRI, Palisades

bec: Public

i

l

R4JI(o!'

BIII

RIl

ke id

gok

4Phillips

9

c o\\

Twigg

x.

.

.

.-.

. _ _ -

.r

.

.

OCT 2 21993

,

l

Consumers Power Company

2

"

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

D

W/ Ark--

$dfCM. P.

i lips, Chief

Reactor rojects Section 2B

Enclosure:

Inspection Report

No. 50-155/93013(DRP)

t

Distribution:

1

cc w/ enclosure:

David P. Hoffman, Vice President

Nuclear Operations

.l

OC/LFDCB

'

-Resident Inspector, RIII

I

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Big Rock Point, LPM, NRR

SRI, Palisades

,

,

. ~ . ,