Text
r
.%
e
,
[(ja stooq'o,
UNITED STATES
NUCLEAR REGULATORY COMMISSION
.,,
'
//'
,o
REGION lli
k
J ;[E
?
799 ROOSEVELT ROAD
GLEN ELLYP, ILLINOIS 60137-5927
%,**u o
OCT 2 21993
Docket No. 50-155
Consumers Power Company
ATTN:
P.M. Donnelly
,
Plant Manager
Big Rock Point Nuclear Plant
10269 US 31 North
Charlevoix, MI 49720
'
Dear Mr. Donnelly:
This refers to the routine safety inspection conducted by Messrs. R. Leemon,
C. Brown, and R. Twigg of this office from August 28 through October 19, 1993.
The inspection included a review of activities at the Big Rock Point Nuclear
facility authorized by NRC Operating License No. OPR-6. - At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of a selective examination of procedures
and representative records, observations, interviews with personnel, and
'
discussions related to a forced power reduction when the reactor feedwater
pump tripped due to personnel error.
No violations of NRC requirements were identified during the course of this
inspection.
However, during this period, an Enforcement Conference was held
with the licensee relating to the loss of control over two plant evolutions;
+
.ne involving the hydrostatic primary system test and the other a breach of
containment integrity with a concurrent mode change.
These issues were
discussed at the Enforcement Conference and are included in special inspection
report Nos. (50-155/93014 and 50-155/93015(DRP)).
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
[
010007
9311020149 931022
ADDCK 05000155
G
,
st'
6
o
00T 2 2 tm
p
b'
\\\\ d
Consumers Power Company
-2
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Or!'jnr.J cb rd by
B. L Jer
m
- -
M. P. Phillips, Chief
Reactor Projects Section 2B
Enclosure:
Inspection Report
No. 50-155/93013(DRP)
.
Distribution:
cc w/ enclosure:
David P. Hoffman, Vice President
Nuclear Operations
DC/LFDCB
Resident Inspector, RIII
James R. Padgett, Michigan Public
Service Commissior
Michigan Department of
Public Health
Big Rock Point, LPM, NRR
SRI, Palisades
bec: Public
i
l
R4JI(o!'
BIII
RIl
ke id
gok
4Phillips
9
c o\\
Twigg
x.
.
.
.-.
. _ _ -
.r
.
.
OCT 2 21993
,
l
Consumers Power Company
2
"
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
D
W/ Ark--
$dfCM. P.
i lips, Chief
Reactor rojects Section 2B
Enclosure:
Inspection Report
No. 50-155/93013(DRP)
t
Distribution:
1
cc w/ enclosure:
David P. Hoffman, Vice President
Nuclear Operations
.l
OC/LFDCB
'
-Resident Inspector, RIII
I
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Health
Big Rock Point, LPM, NRR
SRI, Palisades
,
,
. ~ . ,