ML20059C977

From kanterella
Jump to navigation Jump to search
Discusses Transmittal of 10CFR21 Monthly Repts to Licensees of Nuclear Power Plants & Forwards Initial Mailing of Nov 1993 Monthly Rept.W/O Encl
ML20059C977
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/30/1993
From: Baker E
Office of Nuclear Reactor Regulation
To: Mcgaha J
GULF STATES UTILITIES CO.
References
NUDOCS 9401060282
Download: ML20059C977 (2)


Text

>

I.4 g

-l December 30,'1993 i

Docket No. 50-458 Gulf States Utilities ATTN: Mr. John R. McGaha Vice President - River Bend Nuclear Group Post Office Box 220 St. Francisville, Louisiana 70775

Dear Mr. McGaha:

SUBJECT:

TRANSMITTAL OF 10 CFR PART 21 MONTHLY REPORTS In order to provide expeditious dissemination of 10 CFR Part 21 matters, the U.S.

Nuclear Regulatory Commission (NRC) will mail a copy of its 10 CFR Part 21 monthly report to licensees of nuclear power plants.

The enclosed November 1993 monthly report is the initial mailing. These reports will continue to be made available to the public at the NRC public document room and at the local public document rooms.

If you do not wish to receive this report, or you have a specific contact other than yourself, please provide this information to Walter P. Haass,-

U.S. Nuclear Regulatory Commission, 0WFN, M/S 9D4, Washington, DC 20555.

Sincerely, Original Signed By Edward T. Baker, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV/V i

Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION _(w/o enclosures) 10 CFR Part 21 Monthly Report

' Docket 1 ile: ~

E. Baker F

for November 1993 NRC & Local 'PDRs OGC PD#1V-2 R/F ACRS (10) cc w/o enclosure:

J. Roe J. Gagliardo, RG-IV See next page E. Adensam W. Haass E. Peyton CTFICE PDIV-2/LA PAIV;2/9M PDIV,2/h EPYtE bakbk SBlack NAME DATE 12/n /93 12//393 12//7/93

//

/ /

OFFICIAL RECORD COPY FILENAME: B:\\ MONTHLY. REP

..,cm -m e OV7;"f'h [ f oso m, u-94010602B2 931230 I O PDR ADOCK 05000458 P PM c w

p. l ~. ( Mr. John R. McGaha cc w/o enclosure: Winston & Strawn Mr. Harold W. Keiser ATTN: Mark J. Wetterhahn, Esq. Executive Vice President and 1400 L Street, N.W. Chief Operating Officer Washington, D.C. 20005-3502 Entergy Operations, Inc. P. O. Box 31995 Mr. Les England Jackson, Mississippi 39286 Director - Nuclear Licensing Gulf States Utilities Company Mr. Michael B. Sellman St. Francisville, Louisiana 70775 Plant Manager River Bend Station Mr. Philip G. Harris Post Office Box 220 Cajun Electric Power Coop, Inc. St. Francisville, Louisiana 70775 10719 Airline Highway P. O. Box 15540 Mr. James J. Fisicaro Baton Rouge, Louisiana 70895 Manager - Safety Assessment and Quality Verification Senior Resident Inspector Gulf States Utilities Company P. O. Box 1051 Post Office Box 220 St. Francisville, Louisiana 70775 St. Francisville, Louisiana 70775 President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, Louisiana 70775 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 3 Mr. J. David McNeill, III William G. Davis, Esq. Department of Justice Attorney General's Office P. O. Box 94095 Baton Rouge, Louisiana 70804-9095 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 Administrator Louisiana Radiation Protection Division P. O. Box 82135 Baton Rouge, Louisiana 70884-2135}}