Forwards Enforcement Conference Repts 50-277/93-27 & 50-278/93-27 on 931210.Enforcement Conference Held to Examine Events Which Occurred on 931027,28 & 29
ML20059C757
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/22/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20059C760 List:
References
EA-93-158, NUDOCS 9401060075
Download: ML20059C757 (3)


See also: IR 05000277/1993027

Text

~

..

.

.

DEC 2 21993

Docket Nos. 50-277, 50-278

EA No.93-158

Mr. D. M. Smith

Senior Vice President-Nuclear

Philadelphia Electric Company

Nuclear Group Headquaners

Correspondence Control Desk

P. O. Box 195  ;

Wayne, Pennsylvania 19087-0195

]

Dear Mr. Smith:

SUBJECT: Meeting Report No. 50-277/93-27; 50-278/93-27 (Enfomement Conference)

This letter refers to the second half of the radiological controls program inspection conducted

by Messrs. R. Fernandes, G. Kenna, L. Ecken and Dr. R. Bores of this office on November

'

8-10, 1993, and to the subsequent Enforcement Conference held at the NRC Region I office,

King of Pmssia, Pennsylvania, on December 10, 1993. The inspection was conducted to

examine events which occurmd on October 27,28, and 29.

>

The Enforcement Conference was held as a result of the findings of the inspection and was

'

. attended by you and members of your staff. The following matters were discussed during

the Enforcement Conference: the events, their safety significance, and the facts associated  ;

with the events; the appropriateness of the appamnt violations relative to criteria outlined in t

the NRC's Enforcement Policy (10 CFR Part 2, Appendix C); the safety significance of the ,

appamnt violations and the possible basis for exercising discretion in accordance with Section

VII of the Enforcement Policy; your short and long-term corrective actions; and factors that

NRC considers when it determines the amount of a civil penalty that may be assessed in l

accordance with Section VI.B.2 of the Enforcement Policy. In addition, a summary of your _;

. mot cause analysis of the event was discussed. The conference was closed to the public.  !

The enclosed Enforcement Conference Report provides additional details regarding the above i

matters and related topics discussed at this conference. ,

No reply to this letter is required. You will be notified of our evaluation of appropriate j

enforcement action at a later date.  ;

!

-!;

9401060075 931222

OFFICIALRECORD COPY g ?} 39h i

!

PDR ADOCK 05000277

S

3 m.* ~("f %) ' l

G PDR

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -__ _

.

.

,

-l

- Philadelphia Electric Company 2 UtG 2 2 1993

Your cooperation with us in this matter is appreciated.

.

OriginalSigned By;

James H.Joyner

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards

Division of Radiation Safety

and Safeguanis

Enclosure: Enforcement Conference Report 50-277/93-27; 50-278/93-27 with attachments

cc w/ encl:

J. Doering, Chairman, Nuclear Review Board

G. Rainey, Vice President, Peach Bottom Atomic Power Station

G. Cranston, General Manager, Nuclear Engineering Division

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

G. Edwards, Plant Manager, Peach Bottom Atomic Power Station

A. J. Wasong, Manager, Experience Assessment

G. A. Hunger, Jr., Manager, Licensing Section

J. W. Durham, Sr., Senior Vice Pmsident and General Counsel

J. A. Isabella, Director, Generation Projects Depanment, I

Atlantic Electric

B.- W. Gorman, Manager, External Affairs

R. McLean, Power Plant Siting. Nuclear Evaluations

D. Poulsen, Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Infonnation Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Pennsylvania

TMI - Alert (TMIA)

OFFICIAL RECORD COPY

_ _ - _ _ _ _

.

-

.

!

Philadelphia Electric Company 3 N 2 2 1933  !

bec w/ encl:

Region I Docket Room (with concurrences)

t

bec w/ encl: (Via E-Mail)

D. Holody, Enforcement Officer

W. Dean, OEDO

Joseph Shea, NRR

L. Nicholson, Acting PDI-2, NRR

1

b

I

.

!

!

}

r

!

I

.

i

!

,

!

.i

t

i

RI:DRSS RI:DRSS RI:DRSS

hE

Ecken

M

Bores Joyner

!

,

12//6/93 12/20/93 12/u/93

!

Official Record Copy  ;

-!